§ 13.30.070 — Requirements for facilities within the public right-of-way
Municipal Code, City of Roseville, California · Roseville Municipal Code § 13.30.070
Corpus is an independent public-information project, not the official City of Roseville website. Stable reference: corpuslaw.us/code/6af95dbc-a056-4648-bac2-3ab2b8b0f197
§ 13.30.070: Requirements for facilities within the public right-of-way.
A. Design and Development Standards. All wireless telecommunications facilities that are located within the public right-of-way shall be designed and maintained as to minimize visual, noise and other impacts on the surrounding community and shall be planned, designed, located, and erected in accordance with the city's design and construction standards and the following: 1. General Guidelines. a. The applicant shall employ screening, undergrounding and camouflage design techniques in the design and placement of wireless telecommunications facilities in order to ensure that the facility is as visually screened as possible. Site lines for vehicular safety should be considered when adding screening. b. All wireless telecommunications facilities that are located within the public right-of-way shall not obstruct vehicular travel, pedestrian travel, or any public utility. c. Screening shall be designed to be architecturally compatible with surrounding structures using appropriate techniques to camouflage, disguise, and/or blend into the environment, including landscaping, color, and other techniques to minimize the facility's visual impact as well as be compatible with the architectural character of the surrounding buildings or structures in terms of color, size, proportion, style, and quality. d. Screening of the metered service pedestal shall meet the minimum clear working space requirements per Section 10 of Roseville Electric's Specification for Commercial Construction, as amended from time to time. e. All proposed equipment shall meet the minimum street light clear area per Section 10 of Roseville Electric's Specification for Commercial Construction, as amended from time to time. f. If feasible, wireless telecommunications facilities shall not be installed directly in front of a residence. In locations where homes are only along one side of a street, it is the city's preference that such facilities be installed along the side of the street with no homes. g. All network communications and power shall have a means of disconnection at the pole so that utility workers can turn off the antennae and accessory equipment while working on the pole. 2. Metered Service Pedestal. All power required shall come from an approved metered service location. The metered power pedestal shall meet the requirements of Roseville Electric's Metered Service Pedestal Requirements and the Roseville Electric approved pages of the Electric Utility Service Entrance Requirements Committee ("EUSERC"). All metered pedestals or any other above ground equipment shall be located a minimum of three feet from the edge of any existing joint utility trench. The owner or permittee is responsible for providing and paying for their own power. Any service pedestal with backup generation provisions must be disconnected from the utility service prior to operating any backup generation so that it does not back feed onto the utility system when in use. Any permanently installed backup generation will require a break-before-make automatic transfer switch. 3. Traffic Safety. All facilities shall be designed and located in such a manner as to avoid adverse impacts on traffic safety including sight distance requirements, traffic control and sign visibility, Americans with Disabilities Act ("ADA") requirements, and minimum road clearances. 4. Blending Methods. All facilities shall have subdued colors and non-reflective materials that blend with the materials and colors of the surrounding area and structures. 5. Equipment. It is the city's preference that antenna elements be flush mounted or top mounted, to the extent feasible. All antenna mounts shall be designed so as not to preclude possible future co-location by the same or other operators or carriers. 6. New Poles in the Public Right-of-Way. If new poles are proposed in the public right-of-way the following requirements shall apply: a. Such new poles shall be designed to resemble existing poles in the public right-of way near that location, including size, height, color, materials and style, with the exception of any existing pole designs that are scheduled to be removed and not replaced. b. Except for eligible facilities, the maximum height of any antenna shall not exceed 10 feet above the average height of any nearby poles. c. Such new poles shall be located at least 25 feet from any existing pole to the extent feasible. d. Such new poles shall be located to the extent feasible in an area where there is an existing natural or other feature that obscures the view of the pole. The applicant shall further employ concealment techniques to blend the pole with said features, including, but not limited to, the addition of vegetation if appropriate. e. Except for eligible facilities, a new pole justification analysis shall be submitted to demonstrate why existing infrastructure cannot be utilized and demonstrating the new pole is the least intrusive means possible including a demonstration that the new pole is designed to be the minimum functional height and width required to support the proposed facility. f. All new poles and structures shall meet the minimum clearances to electric and other utility facilities per California Public Utilities Commission General Orders 95 and 128, as may be revised or superseded. g. The owner must provide an engineered study demonstrating the minimum safe working distance from owner's active equipment. In addition, the minimum safe working distance must be clearly posted on the equipment. The owner shall also provide a method and procedure of disabling that same equipment if work closer than the minimum safe working distance is required. h. All new poles shall be located such that there will be a minimum of three feet of native soil between the edge of any existing joint utility trench and the edge of the new pole or base. i. All cables, including, but not limited to, electrical and utility cables, shall be run within the interior of the pole and shall be camouflaged or hidden to the fullest extent feasible. For all wooden poles wherein interior installation is infeasible, conduit and cables attached to the exterior of poles shall be mounted flush thereto and painted to match the pole. 7. Space. It is the city's preference that each facility shall be designed to occupy the least amount of space in the public right-of-way that is technically feasible. 8. Wind Loads. Each facility shall be properly engineered to withstand wind loads as required by this code or any duly adopted or incorporated code. An evaluation of high wind load capacity shall include the impact of modification of an existing facility. 9. Obstructions. Each component part of a facility shall be located so as not to cause any physical or visual obstruction to pedestrian or vehicular traffic, incommode the public's use of the public right-of-way, or safety hazards to pedestrians and motorists and in compliance with Section 19.95.030(C)(3) and (C)(4) (Zoning Ordinance Definitions) so as not to obstruct the clear vision triangle. 10. Public Facilities. A facility shall not be located within any portion of the public right-of-way interfering with access to a fire hydrant, fire station, police station, fire escape, water valve, underground and pad mount utility vaults and structures, valve housing structure, bus stop, transportation facility, or any other public health or safety facility. 11. Screening. All ground-mounted facilities, pole-mounted equipment, or walls, fences, landscaping or other screening methods shall be installed at least 18 inches from the face of curb. 12. Accessory Equipment. Not including the electric meter, it is the city's preference that all accessory equipment be located underground if feasible. a. If accessory equipment will be ground-mounted, such accessory equipment shall: (i) be enclosed within a structure; (ii) be located in adjacent landscape corridors if feasible; (iii) not exceed a height of five feet and a total foot-print of 15 square feet; and (iv) be fully screened and/or camouflaged, including the use of landscaping, architectural treatment, or acceptable alternate screening. Required electrical meter cabinets shall be screened and/or camouflaged and located in adjacent landscape corridors if feasible. Screening of the metered service pedestal shall meet the minimum clear working space requirements of Roseville Electric's Specifications for Commercial Construction, as amended from time to time. b. If feasible, above-ground accessory equipment shall not be installed directly in front of a residence. In locations where homes are only along one side of a street, it is city's preference that such above-ground accessory equipment be installed along the side of the street with no homes. 13. Landscaping. Except for eligible facilities and where appropriate, each facility shall be installed so as to maintain and enhance existing landscaping on the site, including trees, foliage and shrubs. Additional landscaping shall be planted, irrigated and maintained at applicant's expense where such landscaping is deemed necessary by the city to provide screening or to conceal the facility. 14. Signage. No facility shall bear any signs or advertising devices other than certification, warning or other signage required by law or permitted by the city. 15. Lighting. a. No facility may be illuminated unless specifically required by the FAA or other government agency. Beacon lights are not permitted unless required by the FAA or other government agency. b. Legally required lightning arresters and beacons shall be included when calculating the height of facilities such as towers, lattice towers and monopoles. c. Any required lighting shall be shielded to eliminate, to the maximum extent possible, impacts on the surrounding neighborhoods. d. Unless otherwise required under FAA or FCC regulations, applicants may install only timed or motion-sensitive light controllers and lights, and must install such lights so as to avoid illumination impacts to adjacent properties to the maximum extent feasible. The city may, in its discretion, exempt an applicant from the foregoing requirement when the applicant demonstrates a substantial public safety need. e. The applicant shall submit a lighting study which shall be prepared by a qualified lighting professional to evaluate potential impacts to adjacent properties. Should no lighting be proposed, no lighting study shall be required. 16. Noise. a. Backup generators shall only be operated during periods of power outages, and shall not be tested on weekends or holidays, or between the hours of 7:00 p.m. and 7:00 a.m. b. At no time shall equipment noise from any facility exceed the exterior noise levels set forth in Chapter 9.24 (Noise Regulation). 17. Security. Each facility shall be designed to be resistant to, and minimize opportunities for, unauthorized access, climbing, vandalism, graffiti and other conditions that would result in hazardous situations, visual blight or attractive nuisances. The director may require the provision of warning signs, fencing, anti-climbing devices, or other techniques to prevent unauthorized access and vandalism when, because of their location and/or accessibility, a facility has the potential to become an attractive nuisance. Additionally, no lethal devices or elements or electric fences shall be installed as a security device. 18. Timeframe to Construct. The installation and construction approved by a wireless telecommunication facility permit shall begin within one year after its approval or it will expire without further action by the city. B. Conditions of Approval. In addition to compliance with the design and development standards outlined in this section, all facilities shall be subject to the following conditions of approval (approval may be by operation of law), as well as any modification of these conditions or additional conditions of approval deemed necessary by the director: 1. The permittee shall submit an as-built drawing within 90 calendar days after installation of the facility. As-builts shall be in an electronic format acceptable to the city which can be linked to the city's GIS. 2. The permittee shall submit and maintain current at all times basic contact and site information on a form to be supplied by the city. The permittee shall notify the city of any changes to the information submitted within 30 calendar days of any change, including change of the name or legal status of the owner or operator. This information shall include, but is not limited to, the following: a. Identity, including the name, address and 24-hour local or toll free contact phone number of the permittee, the owner, the operator, and the agent or person responsible for the maintenance of the facility. b. The legal status of the owner of the wireless telecommunications facility. 3. The permittee shall notify the city in writing at least 90 calendar days prior to any transfer or assignment of the permit. The written notice required in this section must include: a. The transferee's legal name; b. The transferee's full contact information; and c. A statement signed by the transferee that the transferee shall accept all permit terms and conditions. The director may require the transferor and/or the transferee to submit any materials or documentation necessary to determine that the proposed transfer complies with the existing permit and all its conditions of approval, if any. Such materials or documentation may include, but shall not be limited to: federal, state and/or local approvals, licenses, certificates or franchise agreements; statements; photographs; site plans and/or as-built drawings; and/or an analysis by a qualified radio frequency engineer demonstrating compliance with all applicable regulations and standards of the FCC. Noncompliance with the permit and all its conditions of approval, if any, or failure to submit the materials required by the director shall be a cause for the city to revoke the applicable permits pursuant to and following the procedure set on in Section 13.30.150 (Removal and Restoration—Permit Expiration, Revocation or Abandonment). 4. At all times, all required notices and/or signs shall be posted on the site as required by the FCC, California Public Utilities Commission, any applicable licenses or laws, and as approved by the city. The location and dimensions of a sign bearing the emergency contact name and telephone number shall be posted pursuant to the approved plans. 5. Permittee shall pay for and provide a performance bond or other form of security approved by the city attorney's office, which shall be in effect until the facilities are fully and completely removed and the site reasonably returned to its original condition, to cover permittee's obligations under these conditions of approval and this code. The security instrument coverage shall include, but not be limited to, removal of the facility. The amount of the security instrument shall be calculated by the applicant in its submittal documents in an amount rationally related to the obligations covered by the bond and shall be specified in the conditions of approval. Before issuance of any building permit, permittee must submit said security instrument. 6. If a nearby property owner or tenant registers a noise complaint, the city shall forward the same to the permittee. Said complaint shall be reviewed and evaluated by the permittee. The permittee shall have 14 calendar days to file a written response regarding the complaint which shall include any applicable remedial measures. If the city determines the complaint is valid and the permittee has not taken any steps to minimize the noise, the city may hire a consultant to study, examine and evaluate the noise complaint and the permittee shall pay the fee for the consultant. The matter shall be reviewed by the director. If the director determines sound proofing or other sound attenuation measures should be required to bring the project into compliance with the code, the director may impose conditions on the facility to achieve said objective pursuant to subsection (B)(8) of this section. In addition, violations of the city's noise ordinance may result in the enforcement proceedings, penalties, and remedies authorized by Chapters 2.50 and 2.52 of the Roseville Municipal Code. 7. A condition setting forth the permit expiration date in accordance with Section 13.30.130 (Permit term and renewals) shall be included in the conditions of approval. 8. The wireless telecommunications facility shall be subject to such conditions, changes or limitations as are from time to time deemed necessary by the director for the purpose of: (a) protecting the public health, safety, and welfare; (b) preventing interference with pedestrian and vehicular traffic; and/or (c) preventing damage to the public right-of-way or any adjacent property. The city may modify the permit to reflect such conditions, changes or limitations by following the same notice requirements as are applicable to the underlying permit for similarly located facilities, except the permittee shall be given notice by personal service or by registered or certified mail at the last address provided to the city by the permittee. 9. The permittee shall not transfer the permit to any person prior to the completion of the construction of the facility covered by the permit, unless and until the transferee of the permit has submitted the security instrument required by subsection (B)(5). 10. The permittee shall not move, alter, temporarily relocate, change, or interfere with any existing structure, improvement or property without the prior consent of the owner of that structure, improvement or property. No structure, improvement or property owned by the city shall be moved to accommodate a wireless telecommunications facility unless the city determines that such movement will not adversely affect the city or any surrounding businesses or residents, and the permittee pays all costs and expenses related to the relocation of the city's structure, improvement or property. Prior to commencement of any work pursuant to an encroachment permit issued for any facility within the public right-of-way, the permittee shall provide the city with documentation establishing to the city's satisfaction that the permittee has the legal right to use or interfere with any other structure, improvement or property within the public right-of-way to be affected by applicant's facilities. 11. To the fullest extent allowed by law and except for those matters caused by the city's sole negligence or willful misconduct, the permittee shall assume full liability for any damages or injuries caused to any property or person by the facility which resulted from or arose out of permittee's willful misconduct or negligent act. 12. The permittee shall repair, at its sole cost and expense, any damage including, but not limited to, subsidence, cracking, erosion, collapse, weakening, or loss of lateral support to city streets, sidewalks, walks, curbs, gutters, landscaping, irrigation, parkways, street lights, traffic signals, improvements of any kind or nature, or utility poles, lines and systems, underground utility line and systems, or sewer systems and sewer lines that result from any activities performed in connection with the installation and/or maintenance of a wireless telecommunications facility in the public right-of-way. The permittee shall restore such areas, structures and systems to the condition in which they existed prior to the installation or maintenance that necessitated the repairs. Such time period for correction shall be based on the facts and circumstances, danger to the community and severity of the disrepair. Should the permittee not make said correction within the time period allotted, the city shall cause such repair to be completed at permittee's sole cost and expense. 13. No facility shall be permitted to be installed in the drip line of any tree in the public right-of-way or in the minimum street light clear area of any publicly owned street light per Section 10 of Roseville Electric's Specifications for Commercial Construction, as amended from time to time. 14. Insurance. The permittee shall obtain, pay for and maintain, in full force and effect until the facility approved by the permit is removed in its entirety from the public right-of-way, an insurance policy or policies of commercial general liability insurance, with minimum limits of $2,000,000.00 for each occurrence and $4,000,000.00 in the aggregate, that fully protects the city from claims and suits for bodily injury and property damage. Alternatively, the permittee may self-insure under these same terms. The insurance must name the city and its elected and appointed council members, boards, commissions, officers, officials, agents, employees, and volunteers as additional named insureds, be issued by an insurer admitted in the State of California with a rating of at least a A:VII in the latest edition of A.M. Best's Insurance Guide, and include an endorsement providing that the policies cannot be canceled or reduced except with 30 calendar days prior written notice to the city, except for cancellation due to nonpayment of premium. The insurance provided by permittee shall be primary to any coverage available to the city, and any insurance or self-insurance maintained by the city and its elected and appointed council members, boards, commissions, officers, officials, agents, employees, and volunteers shall be excess of permittee's insurance and shall not contribute with it. The policies of insurance required by this permit shall include provisions for waiver of subrogation. In accepting the benefits of this permit, permittee hereby waives all rights of subrogation against the city and its elected and appointed council members, boards, commissions, officers, officials, agents, employees, and volunteers. The insurance must afford coverage for the permittee's and the wireless provider's use, operation and activity, representatives, agents, and employees, as determined by the city's risk manager. Before issuance of any building permit for the facility, the permittee shall furnish to the city's risk manager certificates of insurance and endorsements, in the form satisfactory to the city attorney or the risk manager, evidencing the coverage required by the city. 15. To the fullest extent allowed by law and except for those matters caused by the city's sole negligence or willful misconduct, permittee shall defend, indemnify, protect and hold harmless city, its elected and appointed council members, boards, commissions, officers, officials, agents, employees, and volunteers from and against any and all claims, actions, or proceedings against the city, and its elected and appointed council members, boards, commissions, officers, officials, agents, employees, and volunteers to attack, set aside, void or annul, an approval of the city, planning commission or city council concerning this permit and the project. Such indemnification shall include damages of any type, judgments, awards, penalties, fines, defensive costs, or expenses, including, but not limited to, interest, reasonable attorneys' fees and expert witness fees, or liability of any kind related to or arising from such claim, action, or proceeding. The city shall promptly notify the permittee of any claim, action, or proceeding. Nothing contained herein shall prohibit city from participating in a defense of any claim, action or proceeding. 16. Additionally, to the fullest extent permitted by law, the permittee, and every permittee and person in a shared permit, jointly and severally, shall defend, indemnify, protect and hold the city and its elected and appointed council members, boards, commissions, officers, officials, agents, employees, and volunteers harmless from and against all claims, suits, demands, actions, losses, liabilities, judgments, settlements, costs (including, but not limited to, attorney's fees, interest and expert witness fees), or damages claimed by third parties against the city for any injury claim, and for property damage sustained by any person, arising out of or resulting from operation of the wireless telecommunications facility, or to any work done by or use of the public right-of-way by the permittee, owner or operator of the wireless telecommunications facility, or their agents, excepting only liability arising out of the sole negligence or willful misconduct of the city and its elected and appointed council members, boards, commissions, officers, officials, agents, employees, and volunteers. 17. Removal of Meter Cabinets. Should Roseville Electric not require the use of an above ground meter cabinet, the permittee shall at its sole cost and expense remove the meter cabinet and any related foundation within 90 calendar days of electrical services being offered and reasonably restore the area to its prior condition. An extension by Roseville Electric may be granted if circumstances arise outside of the control of the permittee. 18. Relocation. The permittee shall modify, remove, or relocate its facility, or portion thereof, without cost or expense to city, if and when made necessary by: (a) any public improvement project, including, but not limited to, the construction, maintenance, or operation of any underground or above ground facilities including but not limited to traffic signals, sewers, storm drains, conduits, gas, water, electric or other utility systems, or pipes owned by the city or any other public agency; (b) any abandonment of any street, sidewalk or other public facility; (c) any change of grade, alignment or width of any street, sidewalk or other public facility; or (d) a determination by the director or the public works director that the wireless telecommunications facility has become incompatible with public health, safety or welfare or the public's use of the public right-of-way. Such modification, removal, or relocation of the facility shall be completed within 90 calendar days of notification by city unless exigencies dictate a shorter period for removal or relocation. Modification or relocation of the facility shall require submittal, review and approval of a modified permit pursuant to the code including applicable notice requirements. In the event the facility is not modified, removed, or relocated within said period of time, city may cause the same to be done at the sole cost and expense of permittee. Further, due to exigent circumstances including those of immediate or imminent threat to the public's health and safety, the city may modify, remove, or relocate wireless telecommunications facilities without prior notice to permittee provided permittee is notified within a reasonable period thereafter. 19. Permittee shall agree in writing that the permittee is aware of, and agrees to abide by, all conditions of approval imposed by the wireless telecommunications facility permit within 30 calendar days of permit issuance. The permit shall be void and of no force or effect unless such written consent is received by the city within said 30-day period. C. Other Permits Required. In addition to any permit that may be required under this chapter, the applicant must obtain all other required prior permits or other approvals from other city departments, or state or federal agencies, including, but not limited to, building and encroachment permits. Any permit granted under this chapter is subject to the conditions and/or requirements of other required prior permits or other approvals from other city departments, state or federal agencies.
( Ord. 5975 § 1, 2018 )
Ask a question about Roseville law
Corpus searches the Roseville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
