§ 14.07.030 — Multifamily parcel meter installations
Municipal Code, City of Roseville, California · Roseville Municipal Code § 14.07.030
Corpus is an independent public-information project, not the official City of Roseville website. Stable reference: corpuslaw.us/code/70c75020-5175-4fc2-afd1-f047a4d7d7e6
§ 14.07.030: Multifamily parcel meter installations.
A. Multiple Units on a Single Assessor Parcel Operating Off of a Single Water Service Line. 1. A single meter will be installed on the existing water service line within the right-of-way (at existing curb stop). 2. If requested by owner, the city can install additional meters at the property line within the public utility easement. Owner will be responsible for additional meter installations. Full payment of meter installation cost is due upon installation. A 10-year repayment plan may be authorized by the director, as provided in Section 14.07.050. 3. If multiple water services exist, the owner may combine the services to a single water service. The owner is responsible for combining the services and abandoning on site services where no meter will be installed. B. Multiple Water Services Serving a Single Dwelling Unit, or Multiple Parcels Owned by a Single Owner and Maintained as a Single Residence. 1. Connections at each parcel will be verified by city. 2. The owner shall identify which connection(s) a meter will be installed on. 3. If multiple water services exist, the owner may combine the services to a single water service. The owner is responsible for combining the on-site services and abandoning on site services where no meter will be installed. 4. If multiple connections exist, the installation will be evaluated for cross connection control. Meter setters with dual check assemblies may be required, requiring the owner to install a thermal expansion relief to the system. 5. If property owner requests additional services, full payment of meter installation costs for these additional services is due upon installation. An alternate payment plan may be authorized by the finance director. C. Multiple Units on Multiple Assessor Parcels Operating Off of a Single Water Service Line. 1. A single meter will be installed on the existing service line and additional meters, one for each parcel, will be installed at the property line within the public utility easement. 2. The property owner will be required to connect additional service lines and make whatever separation is required on site (including obtaining the proper building permit). 3. If separation is not completed, the owner of the property served through the adjacent parcel will be required to separate the on-site services upon any improvements to the property that would result in a water/sewer tenant improvement or upon sale of the property. 4. A 10-year repayment plan may be authorized by the director, as provided in Section 14.07.050. D. Multiple Privately Owned Units Operating Off of a Common (Either Public or Private) Water System (Such as, but Not Limited to, Condominiums). 1. One or more master meters will be installed at the separation between the public and private systems but within the existing public utilities easement. 2. Multiple points of connection will require multiple meter installations. 3. Cross connection surveys will be completed by city to determine the degree of hazard involved. Appropriate backflow prevention shall be installed by city with the meter improvements. This may require the owner to install a pressure relief feature on the water system. 4. A surcharge will be calculated based on the actual cost of metering and cross connection control. The total cost will be amortized over 10 years using the five-year average city pooled investment interest rate. The annual amount due will be divided on a per unit basis and billed to each unit owner monthly. E. Mobile Home Parks With a Private On-Site Water System. 1. One or more master meters will be installed at the separation between the public and private systems but within the existing public utilities easement. 2. Multiple points of connection will require multiple meter installations. 3. Cross connection surveys will be completed by city to determine the degree of hazard involved. Appropriate backflow prevention shall be installed by city with meter improvements. This may require the owner to install a pressure relief feature on the water system. 4. Mobile home park owner is responsible for the cost of meter installation and system modification, if required. 5. Payment terms for meter installation services will be arranged between the owner and the finance director. F. Apartment Complexes With a Private On-Site Water System. 1. One or more master meters will be installed at the separation between the public and private systems but within the existing public utilities easement. 2. Multiple points of connection will require multiple meter installations. 3. Cross connection surveys will be completed by the city to determine the degree of hazard involved. Appropriate backflow prevention shall be installed by the city with meter improvements. This may require the owner to install a pressure relief feature on the water system. 4. The property owner is responsible for the cost of meter installation and system modification, if required. 5. Payment terms for meter installation services will be arranged between the owner and the finance director.
( Ord. 4001 § 2, 2003 ; Ord. 4362 § 2, 2006 ; Ord. 4689 § 1, 2008 )
Ask a question about Roseville law
Corpus searches the Roseville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
