§ 14.11.100 — Inspections
Municipal Code, City of Roseville, California · Roseville Municipal Code § 14.11.100
Corpus is an independent public-information project, not the official City of Roseville website. Stable reference: corpuslaw.us/code/035dcb19-bee7-4824-ad2b-975bb4cb7338
§ 14.11.100: Inspections.
The environmental utilities director shall make an inspection of the annular seal construction work. The environmental utilities director may make an initial inspection of each proposed drilling site, an inspection at the completion of the work, and inspections at such other times as it deems appropriate. A. Initial Inspection. Upon receipt of an application, the environmental utilities director may make an inspection of the drilling site prior to the issuance of a well permit. The purpose of this inspection is to determine whether there are any site conditions requiring: 1. Relocation of the drilling site should the location shown on the permit application be too close to potential sources of pollution, or 2. Additional conditions if needed to remediate any previously unknown ground water quality protection problems. B. Inspection of Well Seal. The environmental utilities director shall inspect the annular space grout depth prior to the sealing. 1. The environmental utilities director shall be notified by the permittee a minimum of 24 hours prior to sealing the annular space. Permittees who anticipate completing a well in less than one day shall notify the environmental utilities director 24 hours prior to commencement of drilling and provide the anticipated time to commence the sealing of the annular space. 2. If the environmental utilities director wishes to allow a seal to be poured without inspection, the permittee shall seal the well in accordance with the standards of this chapter and any permit conditions. No seal shall be poured until permission to proceed is given. If the environmental utilities director fails to be present at the agreed upon inspection time, the contractor shall contact the environmental utilities director for direction. C. Final Inspection. If requested by the environmental utilities director, the permittee shall notify the environmental utilities director within seven days of the completion of their work at each drilling site. The environmental utilities director may make a final inspection after completion of the work to determine whether the well was completed in accordance with this chapter. D. Waiver of Inspections. The environmental utilities director may waive inspections should any of the following conditions exist: 1. The work will be inspected by the staff of the California Regional Water Quality Resources Control Board or the California Department of Health Services if these designated agencies will inspect and report to the city on all drilling features required by the standards. 2. The wells are monitoring wells that will penetrate only formations that normally contain no water. 3. The drilling site is well known to the city staff and it is known that no significant threats to ground water quality exist in the area.
( Ord. 2895 § 1, 1995 )
Ask a question about Roseville law
Corpus searches the Roseville sections it holds and shows the ones that match, with their citations. Free, no sign-in.