For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14.14.330 — Determination of non-compliance with FOG WDP conditions

Municipal Code, City of Roseville, California · Roseville Municipal Code § 14.14.330

Corpus is an independent public-information project, not the official City of Roseville website. Stable reference: corpuslaw.us/code/3fb2e018-a8e5-415a-9487-4b3ce5a73e6b

§ 14.14.330: Determination of non-compliance with FOG WDP conditions.

A. Sampling and Inspection Procedures. 1. Sampling and inspection of FSEs shall be conducted in the time, place, manner and frequency determined at the sole discretion of the director. 2. Non-compliance with FOG WDP discharge conditions, or any discharge provisions of these regulations may be determined by an inspection of the grease control device, grease interceptor and associated manifest and documentation, or analysis of a grab or composite sample of the effluent of an FSE. 3. Any sample taken from a sample point, as determined representative by the director, is considered representative of the discharge to the public sewer. B. Notice of Violation. Any permittee found to be in violation of the FOG WDP terms and conditions may be issued a warning notice of violation in which there will be a specified time period to correct the violation. If the violation is not corrected within the specified time period the permittee may be issued a notice of violation, with a specified time period to correct the violation. If the violation is not corrected within the time period specified the permittee shall be considered in non-compliance. C. Non-compliance Fee. Any permittee determined to be in non-compliance with the terms and conditions specified in its FOG WDP or with any provision of this chapter may be required to pay a non-compliance fee. The purpose of the non-compliance fee is to compensate the city for costs of additional inspection and follow-up, sampling, monitoring, laboratory analysis, treatment, disposal, and administrative processing incurred as a result of the non-compliance, and shall be in addition to and not in lieu of any penalties as may be assessed pursuant to Section 14.14.360. Non-compliance fees shall be in the amount determined by the director. If the permittee remains compliant for 12 consecutive months following the notice of non-compliance, the fee may be waived at the discretion of the director.

( Ord. 4683 § 1, 2008 )

Ask a question about Roseville law

Corpus searches the Roseville sections it holds and shows the ones that match, with their citations. Free, no sign-in.