§ 14.18.050: Submittal requirements.

A. Landscape Package Submittal Required. Prior to issuance of a building permit or improvement plans, the project applicant shall submit a landscape package to the city for review and approval. The landscape package shall contain the information required by subsection B, and shall be incorporated into the improvement plan and/or landscape plan set in a form determined acceptable to the environmental utilities director or designee. B. Elements of the Landscape Package. The landscape package shall include the following six elements, which shall be incorporated into the landscape plan set in a form determined acceptable to the environmental utilities director or designee: 1. Project Information. a. Date; b. Project applicant; c. Project address (if available, parcel and/or lot number(s)); d. Total landscape area (square feet); e. Project type (e.g., new, rehabilitated, public, private, cemetery, homeowner-installed); f. Water supply type (e.g., potable, recycled, well) and the identity of the local retail water purveyor if the applicant is not served by a private well; g. Checklist of all documents in landscape documentation package; h. Project contacts to include contact information for the project applicant and property owner; i. Applicant signature and date with the following statement: "I agree to comply with the requirements of the Water Efficient Landscaping Ordinance and submit a complete landscape documentation package." 2. Water Efficient Landscape Worksheet. The worksheet will be a form provided by the city, and shall include information on the plant factor, irrigation method, irrigation efficiency, and area associated with each hydrozone. Calculations are then made to show that the evapotranspiration adjustment factor (ETAF) for the landscape project does not exceed a factor of 0.55 for residential areas and 0.45 for nonresidential areas, exclusive of special landscape areas. The ETAF for a landscape project is based on the plant factors and irrigation methods selected. The maximum applied water allowance is calculated based on the maximum ETAF allowed (0.55 for residential areas and 0.45 for nonresidential areas) and expressed as annual gallons required. The estimated total water use (ETWU) is calculated based on the plants used and irrigation method selected for the landscape design. ETWU must be below the MAWA. In calculating the maximum applied water allowance and estimated total water use, a project applicant shall use the following ETo values: Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Annual ETo 1.1 | 1.7 | 3.1 | 4.7 | 6.2 | 7.7 | 8.5 | 7.3 | 5.6 | 3.7 | 1.7 | 1.0 | 52.2 a. Water budget calculations shall adhere to the following requirements: i. The plant factor used shall be obtained from the most recent Water Use Classification of Landscape Species publication or from horticultural researchers with academic institutions or professional associations as approved by the California Department of Water Resources (DWR). The plant factors ranges shall be calculated as follows: (A) 0 to 0.1 for very low water use plants; (B) 0 to 0.3 for low water use plants; (C) 0.4 to 0.6 for moderate water use plants; and (D) 0.7 to 1.0 for high water use plants. ii. All water features shall be included in the high water use hydrozone. iii. Temporarily irrigated areas shall be designed as low water use hydrozones. iv. Special landscape areas shall be clearly identified and their water use calculated as shown in the water efficient landscape worksheet. Water use for new and existing (non-rehabilitated) special landscape areas shall be calculated with an ETAF not to exceed 1.0. b. The landscape project's maximum applied water allowance (MAWA) shall be calculated as follows: i. MAWA = (ETo) (0.62) [(ETAF x LA) + (1-ETAF x SLA)], where: (A) MAWA = Maximum applied water allowance (gallons per year); (B) ETo = Reference evapotranspiration (inches per year) (as provided in subsection (B)(2) above);x2 (C) ETAF = ET adjustment factor (0.55 for residential and 0.45 for nonresidential); (D) LA = Landscaped area includes special landscape area (square feet); (E) 0.62 = Conversion factor (to gallons per square foot); (F) SLA = Portion of the landscape area identified as special landscape area (square feet). 3. Soil Management Report. In order to reduce runoff and encourage healthy plant growth, a soil management report shall be completed by the project applicant or designee, as follows: a. Submit soil sample(s) to a laboratory for analysis and recommendations. i. Soil sampling shall be conducted in accordance with laboratory protocol, including protocols regarding adequate sampling depth for the intended plants. ii. The soil analysis shall include: (A) Soil texture; (B) Infiltration rate determined by laboratory test or soil texture infiltration rate table; (C) pH; (D) Total soluble salts; (E) Sodium; (F) Percent organic matter; and (G) Recommendations for appropriate amendment. iii. In projects with multiple landscape installations (i.e., production home developments) a soil sampling rate of one in seven lots or approximately 15 percent of the landscape area will satisfy this requirement. b. The soil analysis report shall be made available, in a timely manner, to the professionals preparing the landscape and irrigation design plans to make any necessary adjustments. c. Any soil management or amendment recommendations shall be included with the design plans for city review. d. Upon completion of construction and prior to issuance of an occupancy permit, the project applicant or designee shall submit documentation verifying implementation of soil analysis report recommendations within the landscaped area to the city with the certificate of completion. 4. Landscape Plan. Landscape plans, including plant selection, shall be designed consistent with the applicable specific plan or special planning area design guidelines. At a minimum, landscape design plans shall address the following: a. Plant Materials. The estimated total water use for plants selected for the landscaped area shall not exceed the maximum applied water allowance. The landscape plan shall identify landscape materials, trees, shrubs, groundcover, turf, etc. Planting symbols shall be clearly drawn and plants shall be labeled by botanical name, common name, container size, spacing, and quantities for each group of plants indicated. Planting areas dedicated permanently and solely to edible plants should be clearly delineated. High water use plants, characterized by a plant factor of 0.7 to 1.0, are prohibited in street medians. Methods to achieve water efficiency shall include one or more of the following: i. Protection and preservation of native species and natural vegetation; ii. Selection of water-conserving plant, tree and turf species, especially local native plants; iii. Selection of plants based on local climate suitability, disease and pest resistance; iv. Selection of trees based on applicable local tree ordinances or tree shading guidelines, and size at maturity as appropriate for the planting area; v. Selection of plants from local and regional landscape program plant lists; vi. Selection of plants from local Fuel Modification Plan Guidelines. b. Plant Selection. Plants shall be selected and planted appropriately based upon their adaptability to the climatic, geologic, and topographical conditions of the project site. Methods to achieve water efficiency shall include one or more of the following: i. Use the Sunset Western Climate Zone System which takes into account temperature, humidity, elevation, terrain, latitude, and varying degrees of continental and marine influence on local climate; ii. Recognize the horticultural attributes of plants (i.e., mature plant size, invasive surface roots) to minimize damage to property or infrastructure [e.g., buildings, sidewalks, power lines]; allow for adequate soil volume for healthy root growth; and iii. Consider the solar orientation for plant placement to maximize summer shade and winter solar gain. c. Hydrozone Information. Each hydrozone shall contain plant materials with similar water use needs. Hydrozones shall be designated as low, moderate, high water, or mixed water use and shall be labeled by number, letter, or other method. Temporarily irrigated areas of the landscape shall be included in the low water use hydrozone for the water budget calculation. Areas irrigated with recycled water should be clearly delineated. For hydrozones with plants of mixed water use, refer to subsection (B)(5)(b). d. Water Features. Water features may be permitted, subject to design review, and the provisions of Chapter 14.09 (Water Conservation). i. All water features shall incorporate recirculating water systems. ii. Where available, recycled water shall be used as a source for decorative water features. iii. The surface area of a water feature shall be indicated on the plans and included in the high water use hydrozone area of the water budget calculation. e. Limitations on Turf. i. Turf shall not be permitted on slopes greater than one foot of vertical elevation change for every four feet of horizontal length. ii. Turf shall not comprise greater than 25 percent of the front yard planting area of developer-installed single-family landscaping. iii. With the exception of special landscape areas, turf shall not comprise greater than 25 percent of nonresidential landscaped area. iv. Turf shall not be permitted within the protected zone radius of any native oak tree, as defined in Chapter 19.66. f. Soil Preparation, Mulch and Amendments. i. Prior to the planting of any materials, compacted soils shall be transformed to a friable condition. On engineered slopes, only amended planting holes need meet this requirement. ii. A minimum three-inch layer of mulch shall be applied on all exposed soil surfaces of planting areas except in turf areas, creeping or rooting groundcovers or direct seeding applications where mulch is not advisable. The plans shall identify the type of mulch and application depth. Shredded (i.e., "gorilla") mulch is not acceptable. To provide habitat for beneficial insects and other wildlife, up to five percent of the landscape area may be left without mulch. Designated insect habitat must be included in the landscape design plan as such. iii. For landscape installations, compost at a rate of a minimum of four cubic yards per 1,000 square feet of permeable area shall be incorporated to a depth of six inches into the soil. Soils with greater than six percent organic matter in the top six inches of soil are exempt from adding compost and tilling. iv. Organic mulch materials made from recycled or post-consumer shall take precedence over inorganic materials or virgin forest products unless the recycled post-consumer organic products are not locally available. Organic mulches are not required where prohibited by local Fuel Modification Plan Guidelines or other applicable local ordinances. v. Stabilizing mulching products shall be used on slopes greater than one foot of vertical elevation change for every three feet of horizontal length. vi. Required soil amendments and quantities shall be clearly denoted on the plans. Soil amendments shall be incorporated based on the recommendations of the soil report and what is appropriate for the plants selected (see subsection (B)(3)). g. Other Design Considerations. The landscape design plan, at a minimum, shall: i. Delineate property lines, utilities and utility easements, streets, driveways, walkways, and other paved areas or hardscapes (pervious or impervious); ii. Identify buildings and structures including pad elevation(s) if applicable; iii. Identify natural features to remain, including rock outcroppings, existing oak and ornamental trees, shrubs, etc.; iv. Identify recreational or other special landscape areas, as defined in Section 14.18.040; v. Identify the location, installation details and any applicable stormwater best management practices. Projects shall refer to the requirements of the City's Stormwater Quality Design Manual; vi. Identify any applicable rain harvesting or catchment technologies as discussed in Section 14.18.120 and their 24-hour retention or infiltration capacity; vii. Identify any applicable graywater discharge piping, system components and area(s) of distribution; viii. A landscape design plan for projects in fire-prone areas shall address fire safety and prevention. A defensible space or zone around a building or structure is required per Public Resources Code Section 4291(a) and (b). Avoid fireprone plant materials and highly flammable mulches. Refer to the local Fuel Modification Plan guidelines. ix. The use of invasive plant species, such as those listed by the California Invasive Plant Council, is strongly discouraged. x. The architectural guidelines of a common interest development, which include community apartment projects, condominiums, planned developments, and stock cooperatives, shall not prohibit or include conditions that have the effect of prohibiting the use of low-water use plants as a group. h. Verification. The landscape plan shall contain the following statement: "I have complied with the criteria of the Water Efficient Landscaping Ordinance and applied such criteria for the efficient use of water in the landscape design plan," which shall be signed by a licensed landscape architect, licensed landscape contractor or any other person authorized to design a landscape plan pursuant to Sections 5500.1, 5615, 5641 et seq., 6701, and 7027.5 of the Business and Professions Code, Section 832.27 of Title 16 of the California Code of Regulations, and Section 6721 of the Food and Agriculture Code. 5. Irrigation Plan. This section applies to landscaped areas requiring permanent irrigation, not areas that require temporary irrigation solely for the plant establishment period. For the efficient use of water, an automated irrigation system shall meet all the requirements listed in this section and the manufacturers' recommendations. The irrigation system and its related components shall be planned and designed to allow for proper installation, management and maintenance. a. System Requirements. i. Landscape water meters defined as either a dedicated water service meter or private submeter, shall be installed for all nonresidential irrigated landscapes of 1,000 square feet but not more than 5,000 square feet (the level at which Water Code Section 535 applies) and residential irrigated landscapes of 5,000 square feet or greater. A landscape water meter may be either: (A) A customer service meter dedicated to landscape use provided by the local water purveyor; or (B) A privately owned meter or submeter. ii. Automatic irrigation controllers utilizing either evapotranspiration or soil moisture sensor data utilizing non-volatile memory shall be required for irrigation scheduling in all irrigation systems. For single-family residential properties, controller shall have a minimum of eight stations or be upgradable to eight stations or more. An exception for additional stations may be provided for front yard landscapes that will be maintained by a homeowner's association. iii. If the water pressure is below or exceeds the recommended pressure of the specified irrigation devices, the installation of a pressure regulating device is required to ensure that the dynamic pressure at each emission device is within the manufacturer's recommended pressure range for optimal performance. (A) If the static pressure is above or below the required dynamic pressure of the irrigation system, pressureregulating devices such as inline pressure regulators, booster pumps or other devices shall be installed to meet the required dynamic pressure of the irrigation system. (B) Static water pressure, dynamic or operating pressure and flow reading of the water supply shall be measured at the point of connection. These pressure and flow measurements shall be conducted at the design stage. If the measurements are not available at the design stage, the measurements shall be conducted at installation. (C) Sensors (rain, freeze, wind, etc.), either integral or auxiliary, that suspend or alter irrigation operation during unfavorable weather conditions shall be required on all irrigation systems, as appropriate for local climatic conditions. Weather-based controllers without integral rain sensors or communication systems that account for local rainfall shall have a separate wired or wireless rain sensor which connects or communicates with the controller(s). Soil moisture-based controllers are not required to have a rain sensor input. Irrigation should be avoided during windy or freezing weather or during rain. (D) Manual shut-off valves (such as a gate valve, ball valve, or butterfly valve) shall be required, as close as possible to the point of connection of the water supply, to minimize water loss in case of an emergency (such as a main line break) or routine repair. (E) Backflow prevention devices shall be provided as required by the environmental utilities department to protect the water supply from contamination by the irrigation system. (F) Flow sensors that detect high flow conditions created by system damage or malfunction are required for all nonresidential landscapes and residential landscapes of 5,000 square feet or larger. (G) Master shut-off valves are required on all projects except landscapes that make use of technologies that allow for the individual control of sprinklers that are individually pressurized in a system equipped with low pressure shut down features. (H) The irrigation system shall be designed to prevent runoff, low head drainage, overspray, or other similar conditions where irrigation water flows onto non-targeted areas, such as adjacent property, non-irrigated areas, hardscapes, roadways, or structures. (I) Relevant information from the soil management plan, such as soil type and infiltration rate, shall be utilized when designing irrigation systems. (J) The design of the irrigation system shall conform to the hydrozones delineated on the landscape design plan. (K) The irrigation system shall be designed and installed to meet irrigation efficiency criteria as described in subsection (B)(2) regarding the maximum applied water allowance. (L) All irrigation emission devices must meet the requirements set in the American National Standards Institute (ANSI) standard, American Society of Agricultural and Biological Engineers'/International Code Council's (ASABE/ICC) 802-2014 "Landscape Irrigation Sprinkler and Emitter Standard." All sprinkler heads installed in the landscape must document a distribution uniformity low quarter of 0.65 or higher using the protocol defined in ASABE/ICC 802-2014. (M) Low volume irrigation shall be used in mulched planting areas to maximize water infiltration into the root zone. (N) Sprinkler heads and other emission devices shall have matched precipitation rates, unless otherwise directed by the manufacturer's recommendations. (O) Sprinkler spacing shall be designed to achieve the highest possible distribution uniformity using the manufacturer's recommendations. (P) Swing joints or other riser-protection components shall be provided on all risers subject to damage that are adjacent to hardscapes or in high traffic areas of turf grass. (Q) Check valves or anti-drain valves are required on all sprinkler heads where low point drainage could occur. (R) Landscape areas less than 10 feet in width in any direction shall be irrigated with subsurface irrigation or low volume irrigation technology or other means that produces no runoff or overspray. (S) Overhead irrigation shall not be permitted within 24 inches of any non-permeable surface. Allowable irrigation within the setback from non-permeable surfaces may include drip, drip line, or other low volume technology. The setback area may be planted or unplanted. The surfacing of the setback may be mulch, gravel, or other porous material. These restrictions may be modified if: (1) The landscape area is adjacent to permeable surfacing and no overspray and runoff occurs; or (2) The adjacent non-permeable surfaces are designed and constructed to drain entirely to landscaping; or (3) The irrigation designer specifies an alternative design or technology as part of the landscape package, and clearly demonstrates strict adherence to irrigation system design criteria in subsection (B)(5). Prevention of overspray and runoff must be demonstrated and confirmed during the irrigation audit. (T) Slopes greater than one foot of vertical elevation change for every four feet of horizontal length shall not be irrigated with an irrigation system with an application rate exceeding 0.75 inches per hour. This restriction may be modified if the landscape designer specifies an alternative design or technology, as part of the landscape package, and clearly demonstrates no runoff or erosion will occur. Prevention of runoff and erosion must be demonstrated and confirmed during the irrigation audit. (U) Irrigation design plans that incorporate use of recycled water shall comply with the requirements of the city's design standards for on-site recycled water systems. b. Hydrozone. i. Each valve shall irrigate a hydrozone with similar site, slope, sun exposure, soil conditions and plant materials with similar water use. ii. Sprinkler heads and other emission devices shall be selected based on their appropriateness for the plant type within that hydrozone. iii. Where feasible, trees shall be placed on separate valves from shrubs, groundcovers, and turf to facilitate the appropriate irrigation of trees. The mature size and extent of the root zone shall be considered when designing irrigation for the tree. iv. Individual hydrozones that mix plants of moderate and low water use or moderate and high water use may be allowed if: (A) The plant factor calculation is based on the proportions of the respective plant water uses and their plant factor; or (B) The plant factor of the higher water using plant is used for calculations. v. Individual hydrozones that mix high and low water use plants shall not be permitted. vi. On the landscape design plan and irrigation design plan, hydrozone areas shall be designated by number, letter, or other designation. On the irrigation design plan, designate the areas irrigated by each valve, and assign a number to each valve. Use this valve number in the Hydrozone Information Table (see water efficient landscape worksheet). This table can also assist with the irrigation audit and programming the controller. c. The irrigation plan, at a minimum, shall identify: i. Location and size of separate water meters for landscape; ii. Location, type and size of all components of the irrigation system, including controllers, main and lateral lines, valves, sprinkler heads, moisture sensing devices, rain switches, quick couplers, pressure regulators and backflow prevention devices; iii. Static water pressure at the point of connection to the public water supply; iv. Flow rate (gallons per minute), application rate (inches per hour) and design operating pressure (pressure per square inch) for each station; v. Recycled water irrigation systems as specified in Section 14.18.100. d. The irrigation plan shall contain the following statement: "I have complied with the criteria of the Water Efficient Landscaping Ordinance and applied such criteria for the efficient use of water in the irrigation plan," which shall be signed by a licensed landscape architect, certified irrigation designer, irrigation consultant, licensed landscape contractor or any other person authorized to design an irrigation system pursuant to Sections 5500.1, 5615, 5641 et seq., 6701, and 7027.5 of the Business and Professions Code, Section 832.27 of Title 16 of the California Code of Regulations, and Section 6721 of the Food and Agriculture Code. 6. Grading and Drainage Plan. For the efficient use of water, grading of a project site shall be designed to minimize soil erosion, runoff and water waste. A grading and drainage plan shall be submitted as part of the landscape documentation package. The grading and drainage plan prepared by a civil engineer and submitted for improvement plan review in association with a development project may also satisfy this requirement. a. In addition to other city grading design standards, the grading plan shall include the following information: i. Height of graded slopes; ii. Drainage patterns; iii. Proposed underground and in-ground drainage improvements; iv. Pad elevations; and v. Finish grade. b. Stormwater retention or treatment improvements, if applicable. c. Verification. The grading and drainage plan shall contain the following statement: "I have complied with the criteria of the Water Efficient Landscaping Ordinance and applied such criteria for the efficient use of water in the grading and drainage plan," which shall be signed by a licensed professional as required by law. C. Approval Required. Upon approval of the landscape package by the city, and provided all other applicable city requirements are met, the project applicant shall: 1. Receive from the city a permit or approval and record the date of the permit or approval in the certificate of completion; and 2. Submit a copy of the approved landscape package along with the record drawings, and any other information to the property owner or designee.

( Ord. 5659 § 2, 2016 )