§ 14.26.380 — Reporting requirements for permittee
Municipal Code, City of Roseville, California · Roseville Municipal Code § 14.26.380
Corpus is an independent public-information project, not the official City of Roseville website. Stable reference: corpuslaw.us/code/27d77345-7be3-4176-93a8-0ab5e7984229
§ 14.26.380: Reporting requirements for permittee.
A. Within 90 calendar days following the date for final compliance with applicable pretreatment standards or, in the case of new source, following commencement of the introduction of wastewater into the POTW, any user subject to pretreatment standards shall submit to the director a report indicating the nature and concentration of all pollutants in the discharge from the regulated process which are limited by such pretreatment standards or requirements. The report shall state whether the applicable pretreatment standards are being met on a consistent basis and, if not, what additional pretreatment or action is necessary to bring the user into compliance with the applicable pretreatment standards. This report shall be signed and certified by an authorized representative of the industrial user, as required by 40 CFR 403.12(1) and 40 CFR 403.6(a)(2)(ii) respectively. If sampling performed by a user indicates a violation, the user shall notify the POTW within 24 hours of becoming aware of the violation. The user shall repeat the sampling and analysis and submit the results of the repeat analysis to the POTW within 30 days after becoming aware of the violation. B. Results of all sampling done by a permittee per 40 CFR 136 at the permit compliance monitoring point shall be submitted to the City of Roseville, Industrial Waste Division.
( Ord. 1718 § 1, 1983 ; Ord. 2280 § 8, 1989 ; Ord. 2707 § 3, 1993 ; Ord. 4768 § 2, 2009 )
Ask a question about Roseville law
Corpus searches the Roseville sections it holds and shows the ones that match, with their citations. Free, no sign-in.