§ 16.20.040: Grading plans.

A. Grading Plan Approval Required. No person may perform any grading without first obtaining a grading plan approval as set forth in this chapter, unless exempted in subsection B. B. Grading Plan Exemptions. A grading plan is not required for: 1. Grading authorized as a condition of a separate discretionary approval involving, but not limited to, a subdivision map, conditional use permit, design review permit or a tree permit; 2. A site which has previously been graded in conformance with an approved grading permit, provided that the proposed excavation or fill does not exceed a depth of three feet from existing grade across the site, that the parcel in which the project is located does not exceed 10 acres and the grading qualifies for an exemption under the California Environmental Quality Act ("CEQA"); 3. Excavation for pools, fish ponds, basements, footings, retaining walls, or demolition of buildings authorized by valid building permit; 4. Trenching for installation of underground utilities; 5. Cemetery graves; 6. Excavation for wells; 7. Exploratory excavations under direction of a soil engineer or engineering geologist; 8. Work performed in a public right-of-way or easement for construction or maintenance of public facilities; 9. Repair, maintenance of, or construction of flood protection projects by the city; 10. Grading operations resulting in excavations and fills less than two feet deep when the volume is less than 50 cubic yards; 11. Grading and clearing performed exclusively for agricultural purposes; 12. Grading associated with an approved wetland mitigation plan; 13. Clearing of land when the affected area is one acre or less, or clearing for fire protection purposes as provided in Chapter 9.20 of this code; 14. Other similar operations approved by the director. An exemption from a major or minor grading plan does not waive the requirement for a grading permit. Prior to any grading activities, a grading permit shall be obtained from the public works department in compliance with the improvement standards, unless the grading activity is specifically exempt from the requirements of a grading permit. C. Types of Grading Plan Approval. 1. Minor Grading Plan. A minor grading plan may be approved by the community development/planning director for the rough grading of a site and stockpiling of material on a site provided that the grading or stockpiling does not result in any impacts to adjacent parcels, does not have the potential to degrade important natural features (e.g., impacts to more than an acre of wetlands, removal of or damage to native oak trees) and does not include grading on any existing slope in excess of 20 percent. A minor grading plan may be issued for the realignment, channelization, or piping of a drainage channel where it is determined that the 10-year storm event would convey stormwater with a flow of 200 cfs or less assuming full development of the upstream watershed. 2. Major Grading Plan. A major grading plan is required for the rough grading of a site or stockpiling of material on a site when, as determined by the director, the grading or stockpiling has the potential to cause impacts to adjacent parcels, would degrade important natural features (e.g., impacts to more than one acre of wetlands, removal of or damage to native oak trees, grading on slopes of more than 20 percent), would result in the excavation or placement of fill within any channel or tributary which would convey stormwater with a flow of 200 cfs or more for a 10-year event assuming full development of the upstream watershed or when in the determination of the director the proposed grading required review at a public hearing. All major grading plans shall be reviewed and approved by the planning commission.

( Ord. 3000 § 1, 1996 ; Ord. 5279 § 15, 2014 )