§ 17.08.130 — Administrative review process, sign permits
Municipal Code, City of Roseville, California · Roseville Municipal Code § 17.08.130
Corpus is an independent public-information project, not the official City of Roseville website. Stable reference: corpuslaw.us/code/0d7fd40e-c07c-4214-abbd-d3ff7dcd8cee
§ 17.08.130: Administrative review process, sign permits.
A. Upon the filing of an application for a sign permit, the director shall review the application within 10 working days for conformance with this title, a planned sign permit program, if applicable, and other applicable regulations. If the application meets the requirements of this title, the director shall endorse the application and drawings as “approved” and shall transmit a copy to the building official. The building official, upon receipt of any approved application, shall review the plans within two working days for conformance with the California Building Code and California Electric Code, as adopted in Title 16 of the Roseville Municipal Code. If the plans are in conformance with the California Electric Code and have been Underwriters Laboratory (UL) designed and labeled, and are in conformance with the California Building Code, the director shall issue a sign permit; provided, however, that the applicant shall first obtain a building permit in accordance with Section 105.1 of the California Building Code, if applicable. B. Three working days prior to installation of the sign, the sign installer shall contact the building department and arrange for a sign inspection. The building official or his or her designee shall meet the sign installer at the site where the sign is to be installed to verify that the sign has been constructed and will be installed in accordance with the sign permit. If, upon inspection, the sign is consistent with the sign permit, the building official or his or her designee shall attach the sign permit sticker bearing the number of the sign permit to the sign so as to be legible to a person standing adjacent to the sign. C. Except as provided above, upon the filing of an application for a temporary sign permit, the director shall review the application within five working days for conformance with this title. If the application meets the requirements of this title, the director shall endorse the application and drawings as “approved.”
( Ord. 4648 § 2, 2008 )
Ask a question about Roseville law
Corpus searches the Roseville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
