For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4.45.060 — Determination of D.U.E. rates and total fees

Municipal Code, City of Roseville, California · Roseville Municipal Code § 4.45.060

Corpus is an independent public-information project, not the official City of Roseville website. Stable reference: corpuslaw.us/code/90e2128d-d028-4e3a-b8a9-74beb0e5c969

§ 4.45.060: Determination of D.U.E. rates and total fees.

The director shall determine D.U.E. rates for any development, project or building for which a building permit is issued. D.U.E. rates shall be based on the actual use proposed and shall consider trip generation and any other information deemed pertinent by the director. The rates shall be determined using generally accepted engineering practice and the best available information. The total fee charged shall be determined by the director and calculated by multiplying the D.U.E. rate for the particular use by the number of units or size of the development, project or building.

( Ord. 4118 § 1, 2004 )

Ask a question about Roseville law

Corpus searches the Roseville sections it holds and shows the ones that match, with their citations. Free, no sign-in.