For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4.54.010 — Purpose

Municipal Code, City of Roseville, California · Roseville Municipal Code § 4.54.010

Corpus is an independent public-information project, not the official City of Roseville website. Stable reference: corpuslaw.us/code/5780c502-ace6-4c75-85c5-5db66ca40603

§ 4.54.010: Purpose.

The city council finds and declares that the purpose of this chapter is as follows: A. The general plan of the city requires that the city be provided, in a time frame related to its development, with an adequate level of electric system subtransmission infrastructure so as to maintain an efficient, reliable and safe distribution system. B. New development, and the expansion of existing development, within the city imposes a burden on the existing electric system subtransmission infrastructure, including, without limitation, the need for upgraded or additional 60kV substations and subtransmission lines, by adding additional electric load. Such burden may vary by the type of development. C. Analysis of the electric load currently created by the various types of development within the city and of the land use expected at build out of the city pursuant to the general plan makes it possible to estimate the amount of electric load generated by different types of development and to determine the electric system subtransmission infrastructure or facilities necessary to support those loads. It is therefore possible to construct a fee, based on anticipated electric load, which equitably spreads the burden of electric system subtransmission infrastructure or facilities to those who will create the need for them and utilize them. It is the intent of this chapter to create such a fee, spreading costs of electric system subtransmission infrastructure to those who create the need for such subtransmission infrastructure, without burdening rate-payers or generating any surplus to either the general or electric funds. It is the further purpose of this chapter to implement the general plan by assuring that adequate public facilities are financed and provided to serve the city. D. The fee established by this chapter has been calculated in the manner set forth in the EES Consulting Electric Backbone Mitigation Fee Analysis ("Fee Analysis") so as to pay for those facilities listed in the capital improvement program. E. The fee established by this chapter is in addition to any other fees or charges required by law as, a condition of development or electric service, including, without limitation, by reason of enumeration, required payments in aid of construction for the cost of distribution facilities for or within a specific development, service connection fees or direct installation fees, or periodic payments for service pursuant to rates established in Chapter 14.24. F. The fee established by this chapter is to be collected for public improvements and facilities, and for which a proposed construction schedule has been adopted. G. That the failure to impose the conditions and regulations of this chapter relating to payment of the fee on building permits would jeopardize residents of the community in that it would permit construction to proceed without adequate infrastructure or means of financing said infrastructure. H. The requirement of this chapter to pay the fee is necessary to assure compliance with the applicable Zoning Ordinance and general plan requirements for the infrastructure funded by this chapter. I. That for a period of greater than 10 days prior to adoption of this chapter, data has been available to the public and to developers and their representatives indicating the cost or estimated cost of the entire infrastructure to be funded. J. That the city council has considered the effect of the fee imposed by this chapter with respect to the housing needs of the city as a whole and of the region, particularly as required by the housing element of the general plan, and the city council finds that this chapter does not unduly adversely affect the city's ability to provide for such needs. K. That the establishment of the fee is for the purpose of obtaining funds for capital projects, necessary to maintain service required by the general plan within existing service areas and existing portions of the city which are developed or for which land use has already been granted.

( Ord. 2393 § 1, 1991 ; Ord. 4605 § 1, 2008 ; Ord. 5319 § 1, 2014 ; Ord. 6906 , 12/18/2024 )

Ask a question about Roseville law

Corpus searches the Roseville sections it holds and shows the ones that match, with their citations. Free, no sign-in.