For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.03.100 — INSPECTION AND PLAN REVIEW - DEPOSIT

San Bernardino Municipal Code (2026 S-2: Local legislation current through Ord. MC-1672, passed 10-7-2026) · San Bernardino Municipal Code § 12.03.100

Corpus is an independent public-information project, not the official City of San Bernardino website. Stable reference: corpuslaw.us/code/8652ceab-0c71-4bc7-89b6-bf6f7458fc10

§ 12.03.100 INSPECTION AND PLAN REVIEW - DEPOSIT.

(A) Before excavation/encroachment permits are issued, a deposit to cover the estimated cost of the inspection, plan review and repair/replacement costs shall be paid to the city. Franchise holders who have repair/replacement language within the franchise agreement or who have previously undertaken all repair/replacement obligations need only provide inspection and plan review fees. Both inspection and plan review will be charged as a percentage of the estimated construction cost with a minimum basic fee to cover administrative costs associated with the permit and plan review/inspections. Public utilities performing work under a blanket permit, in lieu of providing the inspection and plan review deposit, shall be billed quarterly for costs based on construction activities and plan reviews conducted for the public utilities, by the city, in public rights-of-way and public places. (B) Plan reviews shall be submitted to the Department of Development Services for review and comment. Two plans shall be submitted and no permits shall be issued or construction started, until the plan review has been completed and plans approved. (C) No portion of the deposit for repair/replacement costs shall be returned until all work has been satisfactorily completed and all markings, signs, conduits and systems are returned to working order or replaced in kind. This shall also include the removal of pavement markings made to locate underground utilities and facilities and used by the contractor for construction purposes. The street shall be returned to a condition that reflects no evidence of the construction activities. Depending on the location of and direction of the excavation, the contractor may be required to pave to limits of two feet each side of the trench, from the curb to the first lane line, a full lane width, a full half street section or the entire street section should the trench be skewed or impact both sides of the street. Surface treatments, such as chip seal and slurry seal, may be considered based on the condition of the street and area of the patch. (Ord. MC-1004, passed 10-21-1997; Ord. MC-1027, passed 9-9-1998)

Ask a question about San Bernardino law

Corpus searches the San Bernardino sections it holds and shows the ones that match, with their citations. Free, no sign-in.