For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.20.380 — NEW WELLS

San Bernardino Municipal Code (2026 S-2: Local legislation current through Ord. MC-1672, passed 10-7-2026) · San Bernardino Municipal Code § 13.20.380

Corpus is an independent public-information project, not the official City of San Bernardino website. Stable reference: corpuslaw.us/code/95e737b0-32f9-4b3c-9e8e-8fa9bc0a9ff7

§ 13.20.380 NEW WELLS.

(A) New wells meaning. All wells constructed or altered within the city subsequent to the effective date of this chapter shall be known as new wells, and shall be subject to the requirements of this article. (B) Application for well permit. In addition to all applicable state and federal requirements, any person, except the Board, desiring to construct, install or alter a well within the city shall first apply for a well permit at the Geothermal Data Center on forms provided for that purpose by the Geothermal Data Center. Well contractors or drilling operators shall not commence construction or alteration of a well prior to the owner of a proposed well receiving a well permit. (C) Application fee. All applications for a well permit shall be accompanied by an application fee established by Board resolution. (D) Application review. The General Manager shall review each application to determine any potential impacts upon the city heating service; any potential for adverse effects to the surrounding reservoir and other wells; conformity with city plans and ordinances; and to assure registration with the Geothermal Data Center. (E) Permit decision. No later than 21 days from the date of filing a well permit application, using the criteria contained in division (F) below, the General Manager shall notify the applicant, by certified mail, of his or her decision, setting forth any conditions imposed, and, if denied, the basis thereof. Any well permit issued pursuant to this chapter is in addition to any permits required by state and federal regulations. (F) Permit decision criteria. Permit decisions pursuant to division (E) above shall contain written findings for approval or denial which may include, but are not limited to, the following criteria: (1) The estimated hydrological impacts of the proposed wells operation upon the reservoir and surrounding wells; (2) The adequacy of provisions for environmental protection and public safety; (3) The compliance of the proposed well and its use with this chapter, the city’s general plan and all other applicable city laws, ordinances and regulations; and (4) Such other reservoir management criteria as may be deemed directly relevant to the proposed well or its operation. (G) Appeal of permit decision. Applicants or other affected persons may appeal the permit decision to the Board in accordance with § 13.20.270. (H) Authority to attach conditions to permits. When the General Manager determines that certain construction or operational conditions are necessary to assure the conservation and protection of thermal ground water and/or geothermal resources, or to assure the conservative and efficient utilization of said water and/or resources, the General Manager may stipulate conditions within a well permit issued according to division (E) above; such conditions may include, but are not limited to: (1) Restrictions on hours of well construction, with appropriate requirements for noise muffling and waste disposal necessary to assure compatibility with surrounding land uses; (2) Well casing requirements above and beyond state requirements, necessary for ground water and geothermal fluid protection; (3) Restrictions on pumping, heat exchanging, storage and injection operations necessary for the conservation or protection of ground waters and geothermal fluids; and (4) Requirements for scientific sampling, testing or monitoring necessary to conserve or protect ground water or geothermal fluids, or to determine the permitted wells impacts on such water or fluids. (I) Completion inspection. Upon completion of any well construction or alteration, but prior to any testing or commencement of regular use, the owner shall promptly notify the Geothermal Data Center to request a well completion inspection. Promptly after receiving such request, the Board shall cause an inspection and written report thereof to be made for purposes of assuring compliance with this chapter and registration with the Geothermal Data Center. Notice of well pump testing shall be given in accordance with § 13.20.400(C). (J) New surface discharges. Any well or geothermal facilities constructed or altered after the effective date of this chapter shall be operated or altered in such a manner as to conform with applicable environmental rules and regulations. Surface discharges for maintenance purposes shall be conducted in accordance with applicable environmental rules and regulations. (Ord. MC-298, passed 8-17-1983)

Ask a question about San Bernardino law

Corpus searches the San Bernardino sections it holds and shows the ones that match, with their citations. Free, no sign-in.