For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.10.040 — Application, permit, and inspection requirements

Municipal Code of the City of San Marcos, California (Codified through Ordinance No. 2026-1582, enacted September 22, 2026. (Supp. No. 14)) · San Marcos Municipal Code § 17.10.040

Corpus is an independent public-information project, not the official City of San Marcos website. Stable reference: corpuslaw.us/code/ee2b7700-9b48-4472-a924-8a210dc54f26

17.10.040 - Application, permit, and inspection requirements.

(a) Applicant shall verify the electric vehicle charging station meets all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability. (b) For a project complying with the checklist for an electric vehicle charging station the applicant may submit the permit application and associated documentation to the city's building safety division by personal, mailed, or electronic submittal. (c) An application that satisfies the information requirements in the checklist, as determined by the building official, shall be deemed complete. Upon receipt of an incomplete application, the building official shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. (1) Review of the application to install an electric vehicle charging station shall be limited to the building official's review of whether it meets all health and safety requirements of local, state, and federal law. Requirements imposed by the City shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the City makes a finding, based on substantial evidence, that the electric vehicle charging station could have a specific, adverse impact upon the public health or safety, the City may require the applicant to apply for a use permit. (d) Any conditions imposed on an application to install an electric vehicle charging station shall be designed to mitigate the specific, adverse impact upon the public health and safety at the lowest cost possible. (e) Upon confirmation by the building official of the application and supporting documentation being complete and meeting the requirement of the checklist, the building official shall administratively approve the application and issue all required permits or authorizations. Such approval shall not include any necessary approval or permission by a local utility provider to connect the electric vehicle charging station to the provider's electricity grid. The applicant is responsible for obtaining such approval or permission from the local utility provider. (f) If an electric vehicle charging station and any associated equipment interfere with, reduce, eliminate, or in any way affect the required parking spaces for existing uses, the City shall reduce the number of required parking spaces for the existing uses by the amount necessary to accommodate the electric vehicle charging station and any associated equipment.

(Ord. No. 2023-1529, § 2(Att. A), 2-28-2023)

Ask a question about San Marcos law

Corpus searches the San Marcos sections it holds and shows the ones that match, with their citations. Free, no sign-in.