5.72.180 - System Design and Construction.

(a) The System shall be constructed in accordance with the provisions of the franchise agreement. Construction components and techniques shall be in accordance with the franchise and all applicable law. Consistent with applicable law, system technical and performance standards shall be in accordance with the franchise. (b) The Grantee shall strictly adhere to all building and zoning codes currently or hereafter in force and obtain all necessary permits. The Grantee shall arrange its lines, cables, and other appurtenances, on both public and private property, in such a manner as to cause no unreasonable interference with the use of said property by any person. In the event of such interference, the Grantor may require the removal of the Grantee's lines, cables, and appurtenances from the property in question. Grantee shall give at least 48 hours advance notice to all property owners and the Grantor prior to installing any above ground and underground structures upon easements located on private property. Grantor shall not modify its construction requirements subsequent to the completion of construction so as to require reconstruction or retrofit unless the public health and safety so requires. (c) Cables shall be installed underground at Grantee's cost where all existing utilities are already underground. Previously installed aerial cable shall be installed underground at Grantee's pro rata cost in concert with other utilities when all such other utilities may convert from aerial to underground construction. (d) No franchise shall relieve Grantee of any obligations involved in obtaining pole or conduit space from any department of Grantor, utility company, or from others maintaining utilities in streets. (e) Any and all streets and public ways disturbed or damaged by the Grantee or its contractors, during the construction, operation, maintenance, or reconstruction of the System, shall be restored within the time frame and limits specified by Grantor or agent of Grantor, at Grantee's expense, to their original condition unless otherwise authorized in writing by Grantor. (f) The Grantee shall not erect any pole on or along any street or public way in an existing aerial utility system. If additional poles in an existing aerial route are required, Grantee shall negotiate with public utility for their installation. Any such installation shall require the advance written approval of the Grantor. Subject to applicable federal and State law, the Grantee shall negotiate the lease of pole space and facilities from the existing pole owners for all aerial construction, under mutually acceptable terms and conditions. (g) Grantee may cut or trim any trees in any street and Grantee may cut or trim trees pursuant to a prior agreement with the owner of property on which they stand, or as otherwise authorized in writing by Grantor.

Ask a question about San Marcos law

Corpus searches the San Marcos sections it holds and shows the ones that match, with their citations. Free, no sign-in.