For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33-54 — Excavation moratorium for the preservation of newly constructed, reconstructed, resurfaced, surface sealed streets, or any treatment that adds to the structural capacity or life of the pavement

Santa Ana Municipal Code (Supp. No. 33, Update 1: codified through Ordinance No. NS-3097, adopted July 7, 2026) · Santa Ana Municipal Code § 33-54

Corpus is an independent public-information project, not the official City of Santa Ana website. Stable reference: corpuslaw.us/code/77c6697b-b5d4-4570-bac6-0532ca2207c8

Sec. 33-54. - Excavation moratorium for the preservation of newly constructed, reconstructed, resurfaced, surface sealed streets, or any treatment that adds to the structural capacity or life of the pavement.

(a) Purpose. In order to preserve the ride quality, structural integrity, and appearance of newly constructed, reconstructed, resurfaced, surface sealed street pavement, or any treatment that adds to the structural capacity, life, or aesthetic value of the streets in Santa Ana, a moratorium on excavation or street cuts shall be imposed. (b) Definitions. As used in this section, the following words, terms, or phrases shall have the meaning hereinafter set forth: (1) "Utility operator" or "Utilities" means privately or publicly owned entities that provide electricity, natural gas, water and sewer, and telecommunication services to the public. (2) "Private developer" means any individual or entity proposing to construct projects residential, commercial, or industrial in nature that include construction in the public right-of-way. (3) "Moratorium" means the prohibition of any cutting, digging, potholing, or other disturbance of any city street surface, including arterial streets, local streets, and alleys that is imposed by this section. (4) "City street pavement" means all street classifications, including, but not limited to, arterial streets, local streets, and alleys. (c) Moratorium on cutting or excavating street pavement. (1) Newly constructed, reconstructed or resurfaced city street pavement shall not be cut or excavated for a period of five (5) years, subject to exceptions below. Newly constructed, reconstructed or resurfaced city street pavement is defined as any installation that adds to the structural capacity or life of the pavement of any street resulting from placing one (1) inch thickness or more of new asphaltic or cementitious materials. (2) Newly surface sealed city street pavement shall not be cut or excavated for a period of three (3) years, subject to exceptions below. Newly surface sealed city street pavement is defined as any treatment that adds to the structural capacity, life of the pavement, or aesthetic value of any street resulting from applying less than one (1) inch thickness of asphaltic or cementitious materials overlaying, filling existing surface defects, or stabilizing base or subbase layers. (3) The City Engineer or his or her authorized representative may permit newly constructed, reconstructed, resurfaced, or surfaced sealed city street pavement to be cut or excavated prior to expiration of the respective moratorium period above. The city engineer or his or her authorized representative may approve or conditionally approve any such exception if one (1) or more of the following cases are present: A. Emergencies which endanger life, property, or public health and safety. B. Restoration of essential utility service. C. Other situations deemed by the city engineer or his or her authorized representative to be in the best interest of the general public. Exceptions made will require special restoration to mitigate the excavation which impacts the structural capacity, life of the pavement, or aesthetic value of any city street pavement. The city engineer or his or her representative shall cause to be made available an accompanying set of details which mitigate the excavation or cuts. (d) Start of the moratorium time period. The moratorium shall begin on the date that the city accepts the newly constructed, reconstructed or resurfaced city street pavement, or newly surface sealed city street pavement, as documented by the city. Such records and documents shall be made available by the city upon request. (e) Notice of Moratorium to Utilities and Private Developers. The city shall provide notice of the moratorium by making available a list of city street pavements that will be newly constructed, reconstructed, resurfaced, or surface sealed on the city website to provide utility operators and prospective private developers time to arrange for excavation or street cuts prior to the noticed city street pavement that will be newly constructed, reconstructed, resurfaced, or surface sealed. (1) City street pavements that will be newly constructed, reconstructed, resurfaced, or surface sealed will be published on the city's website and made available for inspection in the public works agency at least twelve (12) months prior to the beginning of such construction. (2) For private developers who have received conditions of approval from the public works agency, it shall be the private developer's responsibility to be informed of any updated moratorium locations that may impact their proposed development using the means described above. (f) Streets where moratorium not in effect. Cuts or excavations performed on city street pavement not subject to this moratorium shall be subject to the following requirements: (1) For new utilities' service laterals, the street opening limits shall comply with City of Santa Ana Standard Plans and policies for purposes of connecting the service lateral. Notwithstanding the foregoing, the lateral itself shall be bored, jacked or open-cut installed from the property line of the property being serviced. (2) All street openings, trenching, backfilling and resurfacing shall at all times comply with the City of Santa Ana Standard Plans, as specifically approved in writing by the city engineer or his or her authorized representative. (3) All street openings shall be subject to the then-current street work permit requirements and fees. (g) Appeal. An applicant shall have the right to appeal any decision of the city engineer or his or her authorized representative under Section 33-54 pursuant to the provisions of Chapter 3 of the Santa Ana Municipal Code.

(Ord. No. NS-3006, § 2, 7-6-21)