For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 422 — Public works contracts

Santa Ana Municipal Code (Supp. No. 33, Update 1: codified through Ordinance No. NS-3097, adopted July 7, 2026) · Santa Ana City Charter, art. IV, § 422

Corpus is an independent public-information project, not the official City of Santa Ana website. Stable reference: corpuslaw.us/code/37a7959d-1e3a-4c55-a8ec-c6f730b70e0f

Sec. 422. - Public works contracts.

(a) For purposes of this section, "public works construction" shall be deemed to mean a project for the erection or improvement of public buildings, streets, drains, sewers, or parks. Maintenance and repair of public buildings, streets, drains, sewers, or parks shall not be considered as public works construction. (b) Every contract for public works construction in excess of that amount set from time to time by ordinance of the City Council pursuant to (c) below, shall be made by the City Council with the lowest and best bidder after publication for at least two (2) days in a newspaper of general circulation in the City of notice calling for bids and fixing a period during which such bids will be received, which shall be for not less than ten (10) days after the first publication of said notice, except where alternate contracting procedures are utilized pursuant to (c), below. (c) The City Council shall adopt by ordinance rules and procedures for competitive bidding for all public works contracts, which rules and procedures shall establish limits for public works contracts approved by the City Manager. Such rules and procedures shall establish criteria for thresholds for formal and informal bidding, and notice requirements therefor; standards for rejection of bids and dispensing with bidding; criteria and procedures for prequalifying bidders and contractors; and utilization of alternate project delivery systems such as design-build contracts. For purposes of this Article, "design-build" means a range of methods of procuring design and construction from a single source, where the selection of the single source occurs before the development of complete plans and specifications. Notwithstanding the foregoing, any rule permitting dispensing of bidding and/or performing work with City forces for any reason including an emergency shall require the affirmative votes of at least two-thirds (⅔) of the members of the City Council.

(Ord. No. NS-2715, 7-3-06, approved at election 11-7-06)

Ask a question about Santa Ana law

Corpus searches the Santa Ana sections it holds and shows the ones that match, with their citations. Free, no sign-in.