For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-2511 — Solar energy system review process

Santa Ana Municipal Code (Supp. No. 33, Update 1: codified through Ordinance No. NS-3097, adopted July 7, 2026) · Santa Ana Municipal Code § 8-2511

Corpus is an independent public-information project, not the official City of Santa Ana website. Stable reference: corpuslaw.us/code/745c1fa6-89c9-42b3-baa9-461593139f8e

Sec. 8-2511. - Solar energy system review process.

(a) Definitions. As used herein the following terms shall mean the following: 1. Electronic submittal shall mean the utilization of one or more of the following: e-mail, internet or facsimile. 2. Solar easement shall mean the right of receiving sunlight across real property of another for any solar energy system. Any instrument creating a solar easement shall include, at a minimum, all of the following: (1) A description of the dimensions of the easement expressed in measurable terms, such as vertical or horizontal angles measured in degrees, or the hours of the day on specified dates during which direct sunlight to a specified surface of a solar collector, device, or structural design feature may not be obstructed, or a combination of these descriptions; (2) The restrictions placed upon vegetation, structures, and other objects that would impair or obstruct the passage of sunlight through the easement; and, (3) The terms or conditions, if any, under which the easement may be revised or terminated. 3. Solar energy system shall mean either of the following: (1) Any solar collector or other solar energy device whose primary purpose is to provide for the collection, storage, and distribution of solar energy for space heating, space cooling, electric generation, or for water heating. (2) A structural design feature of a building, including either of the following: (A) Any design feature whose primary purpose is to provide for the collection, storage, and distribution of solar energy for electricity generation, space heating or cooling, or for water heating. (B) Any photovoltaic device or technology that is integrated into a building, including, but not limited to, photovoltaic windows, siding, and roofing shingles or tiles. (b) Applicability. This chapter applies to the permitting of all solar energy systems. Solar energy systems legally established or permitted prior to the effective date of this chapter are not subject to the requirements of this chapter unless physical modifications or alterations are undertaken that materially change the size, type, or components of a solar energy system in such a way as to require new permitting. Routine operation and maintenance or like-kind replacements shall not require a permit. (c) Eligibility. 1. The Building Department shall adopt a standard plan and checklist of all requirements which solar energy systems shall comply with to be eligible for expedited review. 2. The solar energy system permit process, standard plans, and checklist shall substantially conform to the recommendations for expedited permitting, including the checklist and standard contained in the most current version of the California Solar Permitting Guidebook adopted by the Governor's Office of Planning and Research. 3. Prior to submitting an application, the applicant shall: i. Verify to the City's reasonable satisfaction through the use of standard engineering evaluation techniques that the support structure for the solar energy system is stable and adequate to transfer all wind, seismic, and dead and live loads associated with the system to the building foundation. ii. At the applicant's cost, verify to the applicant's reasonable satisfaction using standard electrical inspection techniques that the existing electrical system including existing line, load, ground and bonding wiring as well as main panel and subpanel sizes are adequately sized, based on the existing electrical system's current use, to carry all new photovoltaic electrical loads. (d) Review/Issuance Process. 1. An application that satisfies the information requirements in the checklist pursuant to Section (c)(2) above, shall be deemed complete. Upon receipt of an incomplete application, the building official shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. 2. Upon confirmation by the building official of the application and supporting documentation being complete and meeting the requirements of the checklist, the building official shall administratively approve the application and issue all required permits. 3. City building permit approval does not authorize an applicant to connect the solar energy system to the local utility provider's electricity grid. The applicant is responsible for obtaining such approval or permission from the local utility provider. 4. If the property is located within a historical district, is listed on any historic register or has entered into a Mills Act Agreement, the applicant shall schedule a consultation with the Planning Manager or his/her designee pertaining to the proposed work. (e) Inspections. 1. For a solar energy system eligible for expedited review, only one inspection shall be required. 2. If a solar energy system fails inspection, a subsequent inspection is authorized; however, the subsequent inspection need not conform to the requirements of this subsection.

(Ord. No. NS-2884, § 3, 9-15-15; Ord. No. NS-2950, § 3, 6-19-18)

Ask a question about Santa Ana law

Corpus searches the Santa Ana sections it holds and shows the ones that match, with their citations. Free, no sign-in.