§ 17.38.030 — MOCA—Mineral/Oil Conservation Area Overlay Zone
Municipal Code, City of Santa Clarita, California (Santa Clarita Municipal Code current through legislation adopted 09-08-2026 (eCode360 publication SA4627, scraped 2026-11-18)) · Santa Clarita Municipal Code § 17.38.030
Corpus is an independent public-information project, not the official City of Santa Clarita website. Stable reference: corpuslaw.us/code/71ad83b5-c76d-4f02-8f06-1538aaa39543
§ 17.38.030: MOCA—Mineral/Oil Conservation Area Overlay Zone.
A. Purpose. The mineral/oil conservation area (MOCA) overlay zone designates areas which have a significant mineral aggregate resource and/or oil fields. The purpose is to permit the continuation of the mineral/oil usage while providing development of the area when certain environmental factors have been adequately mitigated. B. Permitted Uses. All uses shall be subject to the requirements of the underlying zone, with the exception of mineral extraction and oil production which shall be subject to the requirements of this section. The following uses shall be permitted where the symbol "P" appears; subject to a conditional use permit where the symbol "C" appears; subject to a minor use permit where the symbol "M" appears; and prohibited where the symbol "X" appears: Extraction and Oil Production | MOCA 1. | Drilling for and/or production, handling, storage, extraction and removal of oil, gas and other hydrocarbons, including but not limited to compressors and other structures and buildings for oil field workers in connection with the operation. | C 2. | Drilling for and/or production, handling, storage, extraction and removal of oil, gas and other hydrocarbons, including but not limited to compressors and other structures and buildings for oil field workers in connection with the operation on properties owned by a public utility and more than five hundred (500) feet from a public right-of-way. | P 3. | Mining for and/or production handling, processing and removal of rock, aggregate, precious metals, sand and other similar material, including but not limited to structures and buildings in connection with the operation. | C 4. | Refineries, absorption plants or gasoline extraction plants. | X C. Property Development Standards. The following regulations shall apply to the site of a mineral/oil conservation area in addition to the regulations of the underlying zone. Additional regulations may be specified as conditions of approval through the conditional use permit, minor use permit and development review process. 1. General Requirements. The general requirements of the underlying zone shall apply to any development within the mineral/oil conservation area overlay zone. 2. Special Requirements. The following special requirements shall apply to development in the mineral/oil conservation area overlay zone. Additional requirements may be specified as conditions of approval of a conditional use permit, minor use permit and/or development review. a. A reclamation plan shall be required for all applications for mineral/oil extraction. The plan shall indicate the expected time frame for reclamation and the various phases. Annual progress reports shall be submitted to the Director. b. Screening and landscaping shall be required of all oil operations. Oil pumping facilities shall be contained within a solid eight (8) foot fence or wall with a securely locked gate to the satisfaction of the Director. c. Truck and service vehicles used in the operation of the facility shall be permitted only on approved routes and shall only be operated within approved hours of operation. d. Outdoor storage of materials shall be in accordance with outdoor storage requirements in commercial and industrial zones. e. Oil well installation and use, including the installation and use of equipment, structures and facilities necessary for all drilling and producing operations customarily required or incidental to usual oil field practice, the initial separation of oil, gas and water, and for the storage, handling, recycling and transportation of oil, gas and water to and from the premises shall conform to the following conditions. The approving authority may waive or modify any one (1) or more of these conditions if it finds that the waiver or modification will not result in material detriment to the public welfare or to the property of other persons located in the vicinity thereof. i. New wells shall not be located within three hundred (300) feet of any existing residence, except the residence of the owner of the land on which the well is located, and except a residence located on land which, at the time of the drilling of the well, is under lease to the person drilling the well. New residential development shall not be located within fifty (50) feet of an existing well, in accordance with the fire code. ii. If the drilling is within five hundred (500) feet of one (1) or more residences and except a residence located on land which, at the time of the drilling of the well, is under lease to the person drilling the well, that: (A) All derricks used in connection with the drilling of the well shall be enclosed with fire-resistant and soundproofing material unless the occupants of all residences within one thousand three hundred twenty (1,320) feet (one-fourth (1/4) mile) of the drilling site, other than of a residence described in subsection (C)(2)(e)(ii) of this section, file a written waiver with the Commission; (B) All drilling and pumping equipment shall be operated by muffled internal-combustion engines or by electric motors; (C) Materials, equipment, tools or pipe used for either drilling or producing operations at the well hole shall be delivered to or removed from the drilling site only between the hours of eight a.m. and six p.m. of any day, except in the case of emergency. f. The derrick used pursuant to this section to drill any well hole or to repair, clean out, deepen or re-drill any completed or drilling well shall be removed within ninety (90) calendar days after completion or abandonment of any well. g. Within ninety (90) calendar days after abandonment of any well, earthen sumps used in drilling or production, or both, shall be filled, and the drilling site restored as nearly as practicable to its original condition. h. Any unattended earthen sump located within one thousand three hundred twenty (1,320) feet (one-fourth (1/4) mile) of the nearest highway, or within two thousand six hundred forty (2,640) feet (one-half (1/2) mile) of twenty (20) or more residences shall be enclosed with a wall not less than eight (8) feet high. i. When private roads to wells are constructed, that portion of such roads lying within two hundred (200) feet of a public highway, or of an existing residence, shall contain a surface that controls dust. j. A well hole, derrick or tank shall not be placed within fifty (50) feet of any public highway. k. Except as provided in this code, a faithful performance bond in amount determined by the Director, but not less than two thousand dollars ($2,000), shall be filed with the City for each well for the first five (5) wells. Where more than five (5) wells are drilled, ten thousand dollars ($10,000) in bonds shall be the minimum total required of all oil operators. Either such bond shall include as obligees all persons who may be damaged or annoyed by such use, or a policy of insurance shall be filed with the City having a maximum amount of recovery not less than the amounts required of a bond, directly insuring all persons who may be damaged or annoyed by such use. Faithful performance bonds for mining operations shall be determined by the approving authority as part of the conditional use permit approval. l. All drilling and producing operations shall conform to all applicable grading, oak tree, fire and safety regulations. m. Not more than two (2) production tanks, neither to exceed one thousand (1,000) barrels capacity, shall remain on the premises following completion of production tests at each well; provided, however, that this condition shall not restrict the maintenance of additional tanks for storage and shipping as part of the conditional use permit approval. n. Technological improvements in drilling, mining, and production methods shall be adopted as they become, from time to time, available if capable of reducing factors of nuisance and annoyance. o. All drilling, mining and production operations shall be conducted in such a manner as not to constitute a public nuisance. p. Signs shall not be constructed, erected, maintained or placed on the premises, or any part thereof, except those required by law or ordinance to be displayed in connection with the drilling or maintenance of the well. q. Suitable and adequate sanitary toilet and washing facilities shall be installed and maintained to a clean and sanitary condition at all times. r. For aggregate mining and processing activities, a minimum one (1) mile distance and/or additional buffering shall be maintained from residential uses or other sensitive receptors to mitigate for noise and airborne emissions. s. After completion of mining activities, all lands shall be remediated and restored to a condition that supports beneficial uses, which may include but are not limited to recreational open space, habitat enhancement, groundwater recharge, or urban development. t. Mitigation of impacts from mining and processing of materials on adjacent uses or on the community, including but not limited to air and water pollution, traffic and circulation, noise, and land use incompatibility. u. Mineral extraction sites shall be maintained in a safe and secure manner after cessation of extraction activities, which may include the regulated decommissioning of wells, clean-up of any contaminated soils or materials, closing of mine openings, or other measures as deemed appropriate by the agencies having jurisdiction including the City.
( Ord. 13-8 § 4 (Exh. A), 6/11/2013 )
Ask a question about Santa Clarita law
Corpus searches the Santa Clarita sections it holds and shows the ones that match, with their citations. Free, no sign-in.
