§ 19.03.100 — Sections 80.21(D), (E), (F), and (G) are Added

Municipal Code, City of Santa Clarita, California (Santa Clarita Municipal Code current through legislation adopted 09-08-2026 (eCode360 publication SA4627, scraped 2026-11-18)) · Santa Clarita Municipal Code § 19.03.100

Corpus is an independent public-information project, not the official City of Santa Clarita website. Stable reference: corpuslaw.us/code/d22efaf3-f2dc-43c2-9b0c-11bbd2404b25

§ 19.03.100: Sections 80.21(D), (E), (F), and (G) are Added.

Sections 80.21(D), (E), (F), and (G) are added to read as follows: (D) Submittal Documents. The authority having jurisdiction shall require the submission of plans, specifications, drawings, descriptions and diagrams as appropriate to clearly show the character, kind, and extent of electrical work covered by an application for a permit. Such documents may be submitted in electronic format upon approval of the authority having jurisdiction. Exception: If in the opinion of the authority having jurisdiction the scope of work is determined to be of a minor nature, the submittal of such documents may be waived by the authority having jurisdiction. (E) Information Required on Plans. 1. Every plan required by section (D) of this section shall be a print or other type approved by the Building & Safety Division. Electronic media documents may be submitted as determined by the Building Official. The information contained on the plans shall be drawn in a professional manner, be clearly legible and contain the information required in section (E)(2) of this section. Labeling, lettering, dimensioning, and numbering shall be of a size and style to be easily read and shall be in conformance with accepted professional practices and standards for architectural and engineering documents. Reasonable symbols satisfactory to the Division shall be used in all plans. Submitted plans and specifications, which are deemed incomplete or incorrect, shall be returned to the architect or registered engineer or other individual in general responsible charge with a request for compliance with these regulations before checking is begun or resumed by Building & Safety Division staff. 2. | The following is required to be shown on the plans for all electrical installations requiring a permit: a. | A complete single-line diagram; b. | The type, location, and capacity of all service equipment; c. | The size and length of all feeder raceways; d. | The dimensions of all pull or junction boxes larger than four (4) inches trade size; e. | The number, size, and type of all conductors to be installed in each feeder circuit; f. | The location of every proposed outlet and switch in all parts of the building or structure, including all fixed showcases, wall-cases, office furnishings, and similar wiring and the location of all existing circuits and outlets within or related to the areas of new or modified electrical installations; g. | The location, voltage and HP rating of every motor that is not a component of a listed appliance and the KW rating of every generator; h. | The location and KVA or equivalent rating of each transformer and similar equipment; and the location and ampere or wattage rating of other appliances of the noninductive type; i. | Details of panelboard, switchboard and motor control center schedules, showing wattage and amperage, of active branch circuits to be installed or modified, and the number of spare branch circuits for future use. This shall include identifying the circuits to which the outlets are connected and listing the number and type of outlets; j. | A lighting fixture schedule; k. | The existing load, as calculated in accordance with Articles 210 and 220 of the NEC or by other methods satisfactory to the authority having jurisdiction shall be indicated for existing installations, alterations, or additions made thereto; l. | Other additional information as the authority having jurisdiction may consider necessary for proper enforcement of this code. Exception (1): R-3 and U occupancies that are accessory to R-3. Information required is limited to the location of all electrical outlets, including, but not limited to receptacles, switches, lighting, power for appliances, disconnecting means for appliances, and the location and size of the electrical service and any sub-panel(s). Alternative power source systems and specialized electrical installations may require more information on the plans. Exception (2): Some or all plan requirements may be waived at the discretion of the authority having jurisdiction for work considered to be of a minor nature. (F) Plan Review Fees. Plan review fees shall be paid in full when the plans are submitted for review. The cost of the electrical plan review shall be as established by the City Council. (G) Expiration of Plan Review. Applications for which no electrical permit has been issued within twelve months following the date of application, shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the authority having jurisdiction. The authority having jurisdiction may extend the time for action by the applicant for a period not exceeding one hundred eighty (180) days on request by the applicant which includes sufficient justification for the extension. The authority having jurisdiction may collect a fee for any application for extension of plan review in accordance with the city's fee schedule. No application shall be extended more than twice. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee.

( Ord. 25-5 , 11/25/2025 )

Ask a question about Santa Clarita law

Corpus searches the Santa Clarita sections it holds and shows the ones that match, with their citations. Free, no sign-in.