§ 18-68.060 — Permit review and inspection requirements

Code of Ordinances, City of Santa Rosa, California (Code 2026-09-15: eCode360 publication current through Ord. No. 2026-014 adopted September 15, 2026 (scraped 2026-11-20)) · Santa Rosa Code of Ordinances § 18-68.060

Corpus is an independent public-information project, not the official City of Santa Rosa website. Stable reference: corpuslaw.us/code/04a593e7-04ec-4cf2-b2cb-95e2591bf8c8

§ 18-68.060: Permit review and inspection requirements.

(A) The Building Official may require an applicant to apply for a Minor Use Permit if the Building Official determines that the small residential rooftop energy system as proposed would have a specific, adverse impact upon the public health or safety. Such decisions may be appealed to the Planning Commission in the manner set forth in the City Zoning Code. (B) If a Minor Use Permit is required, the City may deny such application if it makes written findings based upon substantive evidence in the record that the proposed installation would have specific, adverse impact upon public health or safety and there is no feasible method to satisfactorily mitigate or avoid the adverse impact. Such findings shall include the basis for the rejection of the potential feasible alternatives for preventing the adverse impact or inconsistency. Such decisions may be appealed to the Planning Commission in the manner set forth in the City Zoning Code. (C) Any condition imposed upon an application shall be designed to mitigate the specific, adverse impact or inconsistency at the lowest possible cost. (D) Prior to submitting an application, the applicant shall: (1) Verify to the applicant's reasonable satisfaction through the use of standard engineering evaluation techniques that the support structure for the small residential rooftop solar energy system is stable and adequate to transfer all wind, seismic, and dead and live loads associated with the system to the building foundation; and (2) At the applicant's cost, verify to the applicant's reasonable satisfaction using standard electrical inspection techniques that the existing electrical system including existing line, load, ground and bonding wiring as well as main panel and subpanel sizes are adequately sized, based on the existing electrical system's current use, to carry all new photovoltaic electrical loads. (E) Review of the nondiscretionary application shall be limited to the Building Official or qualified designee's review of whether the application is complete and meets the requirements of the standard plans and checklist and all State law and City Codes and standards. The Building Official shall have the discretion to accept additional documentation to substantiate compliance with standards as an amendment to the checklist. (F) If an application is deemed incomplete, a written correction notice detailing all deficiencies in the application and any additional information or documentation required to be eligible for expedited permit issuance shall be sent to the applicant for resubmission. Additional fees may be charged for subsequent application reviews. (G) The nondiscretionary small residential rooftop solar energy system application shall be reviewed and approved or rejected within three business days of application. Resubmittals shall also be reviewed, approved or rejected within three business days and may be subject to additional plan review fees. (H) Upon confirmation by the Building Official of the application and supporting documentation being complete and meeting the requirements of the standard plans and checklist including all health and safety requirements of State and City Code standards, the Building Official shall administratively approve the application and issue all required permits or authorizations. Such approval does not authorize an applicant to connect the small residential rooftop energy system to the local utility provider's electricity grid. The applicant is responsible for obtaining such approval or permission from the local utility provider. (I) Only one small residential rooftop solar energy system inspection shall be required and performed by the Building Official or qualified designee. Said inspection shall be performed in a timely manner as soon as practical and as staff resources permit. (J) If a small residential rooftop solar energy installation fails inspection, a subsequent re-inspection is authorized and may be subject to additional fees.

( Ord. 4048 § 2, 2015 )

Ask a question about Santa Rosa law

Corpus searches the Santa Rosa sections it holds and shows the ones that match, with their citations. Free, no sign-in.