For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18-69.060 — Permit review and inspection requirements

Code of Ordinances, City of Santa Rosa, California (Code 2026-09-15: eCode360 publication current through Ord. No. 2026-014 adopted September 15, 2026 (scraped 2026-11-20)) · Santa Rosa Code of Ordinances § 18-69.060

Corpus is an independent public-information project, not the official City of Santa Rosa website. Stable reference: corpuslaw.us/code/ec23995b-9f07-4589-bc5d-8dbfcd0ae790

§ 18-69.060: Permit review and inspection requirements.

(A) Prior to submitting an application, the applicant shall: (1) At the applicant's cost, verify to the applicant's reasonable satisfaction using standard electrical inspection techniques that the existing electrical system including existing line, load, ground and bonding wiring as well as main panel and subpanel sizes are adequately sized, based on the existing electrical system's current use, to carry all new electric vehicle charging station electrical loads. (B) Review of the ministerial application shall be limited to the Building Official or qualified designee's review of whether the application is complete and meets the requirements of the standard plans and checklist and all state law and City Codes and standards. The Building Official may accept additional documentation to substantiate compliance with standards as an amendment to the checklist. (C) If an application is deemed incomplete, a written correction notice detailing all deficiencies in the application and any additional information or documentation required to be eligible for expedited permit issuance shall be sent to the applicant for resubmission. Additional fees may be charged for subsequent application reviews. (D) The ministerial electric vehicle charging station application shall be reviewed and approved or rejected within three business days of application. Resubmittals shall also be reviewed, approved or rejected within three business days and may be subject to additional plan review fees. (E) Upon confirmation by the Building Official of the application and supporting documentation being complete and meeting the requirements of the standard plans and checklist including all health and safety requirements of state and City Code standards, the Building Official shall administratively approve the application and issue all required permits or authorizations. Such approval does not authorize an applicant to connect the electric vehicle charging station to the local utility provider's electricity grid. The applicant is responsible for obtaining such approval or permission from the local utility provider. (F) If an electric vehicle charging station installation fails inspection, a subsequent re-inspection is authorized and may be subject to additional fees.

( Ord. 2019-022 § 15 ; Ord. 2022-015 § 15 ; Ord. 2025-014 , 11/18/2025 )

Ask a question about Santa Rosa law

Corpus searches the Santa Rosa sections it holds and shows the ones that match, with their citations. Free, no sign-in.