For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 20-35.070 — Temporary housing

Code of Ordinances, City of Santa Rosa, California (Code 2026-09-15: eCode360 publication current through Ord. No. 2026-014 adopted September 15, 2026 (scraped 2026-11-20)) · Santa Rosa Code of Ordinances § 20-35.070

Corpus is an independent public-information project, not the official City of Santa Rosa website. Stable reference: corpuslaw.us/code/c3b763be-2eb7-4feb-b1b7-cfeda0b637c1

§ 20-35.070: Temporary housing.

A. Temporary Housing is a permitted use on residential or nonresidential parcels. Temporary Housing is not permitted on Damaged Property. Temporary Housing applicants and permitted users must be one of the following: 1. Displaced Person. 2. Property Owner(s) with Damaged Property and/or Eligible Property. B. Application filing and processing. 1. General. Applications for Temporary Housing shall be filed and processed in compliance with Chapter 20-50, Permit Application Filing and Processing. A Temporary Use Permit application shall include all information and materials required by the Conditional Use Permit application and Section 20-50.050, Application Preparation and Filing, and provided that the application is following standards listed in this section. 2. Ministerial Temporary Use Permit Application. The approval of a Temporary Use Permit for Temporary Housing on Eligible Property shall be considered a ministerial act. 3. Discretionary Temporary Use Permit Application. The approval of a Temporary Use Permit for Temporary Housing on a property not affected by a Hazard shall be considered a discretionary act for the purpose of the California Environmental Quality Act (CEQA). 4. Application processing: a. Duration. The duration of a Temporary Housing shall not exceed three years from the date of approval of the Temporary Use Permit. b. It shall be the responsibility of the property owner to ensure that Temporary Housing units are vacated in accordance with law on or before expiration of the Temporary Use Permit. c. A Temporary Use Permit for Temporary Housing can only be acquired once. d. Extensions of Temporary Use Permits are prohibited per Section 20-52.040. 5. Building Permit Application. A Building Permit is required for all temporary housing. C. Development and Performance Standards. 1. Development Standards. a. Setbacks. Temporary Housing shall provide a minimum four-foot side and four-foot rear setback, and a front setback consistent with that of the primary dwelling unit in a standard zoning district, or the most similar zoning district in the case of a PD. An 800 square foot Temporary Housing unit that complies with all other development standards in this section may be located within the front yard setback of a lot if it is otherwise physically infeasible to locate the Temporary Housing unit on other areas of the lot while maintaining the minimum rear and side yard setbacks outlined in this Subsection. Side-corner setbacks shall be a minimum of eight feet. b. Temporary Housing shall not exceed 16 feet in height. c. Temporary Housing shall not exceed 1,200 square feet. d. Lot coverage shall not apply to a Temporary Housing unit. 2. Number of units permitted. The number of temporary housing units, either individual, single-family units, or multi-bed/multi-tenant units, permitted on a parcel shall be consistent with the allowable density established by the General Plan. Zoning Districts that do not have a density established by the General Plan shall follow applicable density requirements listed in Section 20.22.030, Section 20-23.040, Section 20-24.040, or Section 20-26.040. Parcels that do not have a density established by the General Plan, Zoning Code, or are regulated through Floor Area Ratio (FAR) will be allowed 1 unit maximum per parcel. 3. Lighting. Adequate external lighting shall be provided for security purposes in compliance with Section 20-30.080, Outdoor lighting. 4. Temporary Housing Local Contact. For proposals that include group quarters or multiple temporary housing units with five or more units, at least one Temporary Housing Local Contact shall be required. The City will provide mailed notice of permit issuance, local contact information, and applicable Temporary Housing regulations to property owners and tenants within 600 feet of the Temporary Housing site. 5. Sanitation facilities. The number of bathrooms and showers required on site shall be determined through the building permit process and shall be consistent with the California Building Code. 6. Parking. Each temporary housing unit shall demonstrate on a site plan the number of automobile parking spaces and bicycle parking spaces required below, except where a greater or lesser number of spaces is required through conditions of approval or state law. Temporary Housing Type | Number of Parking Spaces Required Vehicle | Bicycle One single-family temporary housing unit | 1 space per temporary housing unit unless determined unfeasible by the Director | None required Multiple temporary housing units | 1 space per 1 temporary housing units unless determined unfeasible by the Director | 1 space per 4 temporary housing units Group quarters (including multiple beds in a single temporary unit to be occupied by individuals) | 1 space for each 100 sq ft of common sleeping area, | 1 space per temporary housing unit 7. Water and wastewater services. Water and wastewater service shall be available on the site proposed for temporary housing structures unless an alternative source is approved by Santa Rosa Water and complies with any applicable provisions of the California Building Code and California Health and Safety Code. a. Water. To protect the public water system, the appropriate approved backflow device shall be required. Initial testing certification of backflow devices is required and shall be performed by an entity as determined by the Director of Santa Rosa Water. b. Wastewater. To protect public health, connection to the wastewater system is required. The Director of Santa Rosa Water will determine the appropriate connection requirement. c. Santa Rosa Water will require an agreement from owner of the underlying property to assure termination of the connections at the expiration of the temporary use. 8. Electrical service. Electrical services shall be available on the site proposed for temporary housing structures unless an alternate source is approved by the Planning and Economic Development Director and is in accordance with any applicable provisions of the California Building Code. All temporary or permanent electrical service shall be located on the subject site. 9. Noise limits. The operation of the site is subject to Santa Rosa Municipal Code Section Chapter 17-16, Noise. 10. The site shall be cleaned-up and returned to its original condition following termination of the Temporary Housing use. 11. Temporary Housing shall be located outside the boundaries of any easements. D. Multiple Temporary Housing units. For proposals that include group quarters or multiple temporary housing units on a single residential or nonresidential parcel, the application shall also include details of the operations of the use, including, but not limited to, a description of the following: 1. Number of proposed beds/occupants. 2. Cooking facilities. 3. Sanitation facilities and management thereof. 4. Power source and associated noise mitigation. 5. Site lighting. 6. Site security and management, including the number of staff on site at any given time. 7. Location of proposed parking. 8. On-going site maintenance. 9. Duration of temporary housing. 10. Pedestrian and vehicular circulation, including how units will be moved on and off-site during operation. E. Rental requirements. Temporary housing shall not be used for rentals with terms of less than 30 days. F. Findings and decision. A Temporary Use Permit for Temporary Housing may be approved by the Director pursuant to Section 20-52.040(G), Findings and decision. The approval of a Temporary Use Permit for Temporary Housing on property not affected by a Hazard shall be considered a discretionary act for the California Environmental Quality Act (CEQA). G. Post approval procedures. Post approval procedures for a Temporary Use Permit for temporary housing shall be as provided by Section 20-52.040(H), Post approval procedures. 1. Termination of Connection. Termination proceedings for utilities shall initiate within 30 days after expiration of the Temporary Use Permit. The Temporary Housing use shall terminate after utilities have been terminated.

( Ord. 2024-012 , 11/19/2024 )

Ask a question about Santa Rosa law

Corpus searches the Santa Rosa sections it holds and shows the ones that match, with their citations. Free, no sign-in.