§ 144.0220 — Soils and Geologic Reports Required
San Diego Municipal Code (City Clerk PDFs, pages revised through October 2026) · San Diego Municipal Code § 144.0220
Corpus is an independent public-information project, not the official City of San Diego website. Stable reference: corpuslaw.us/code/1d98a1b9-0aef-4f6a-a767-e91f9e9f7779
§144.0220 Soils and Geologic Reports Required
Geotechnical reports are required as follows: City Engineer may require that these conditions be addressed in a (a) A preliminary soils report is required for all subdivisions and a more detailed soils investigation may be required by the City Engineer under the conditions described in the Subdivision Map Act, Chapter 4, Article 7. The requirement for a preliminary soils report may be waived by the City Engineer after a determination that additional information regarding soils of the subdivision is not needed; (b) In addition to the requirement for a preliminary soils report, a geological reconnaissance report that addresses potential geologic hazards may be required by the City Engineer; and (c) Where unstable conditions are indicated, the final engineering geology report. The final engineering geology report, including specific mitigation measures, shall be incorporated in the detailed construction plans as a condition of final map or parcel map approval.
(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.)
Ask a question about San Diego law
Corpus searches the San Diego sections it holds and shows the ones that match, with their citations. Free, no sign-in.
