§ 25.04.310 — Passenger facilities development phasing
San José Municipal Code (Supp. No. 5: codified through Ordinance No. 31341, enacted August 25, 2026) · San José Municipal Code § 25.04.310
Corpus is an independent public-information project, not the official City of San Jose website. Stable reference: corpuslaw.us/code/7656b58e-4778-430e-9c3d-de68d010210e
25.04.310 - Passenger facilities development phasing.
A. Any construction of additional of air carrier gates beyond thirty-one air carrier gates shall not proceed until the year 2000 or beyond, and shall not proceed until: 1. The conditions specified in Part 4 of this chapter, pertaining to traffic congestion measures, have been met; and 2. Total annual passenger volumes at the airport exceed eleven million two hundred thousand annual passengers. B. Modifications in design concept, planning, and construction of the terminal facilities shall be consistent with the 1997 Airport Master Plan (including any amendments to the plan). C. Any construction, reconfiguration, or remodeling of terminal buildings into a centralized terminal facility shall be phased so that existing air carrier gates are taken out of service as replacement, reconfigured, or new gates are constructed, so as to not have more than either: (i) thirty-one air carrier gates in the terminal facilities at any one time unless the pre-requisites of Section 25.04.410 have been met; (ii) nor more than forty air carrier gates in the terminal facilities at the airport at any one time, if the pre-requisites of Section 25.04.410 have been met.
(Ords. 25528, 26516.)
Ask a question about San Jose law
Corpus searches the San Jose sections it holds and shows the ones that match, with their citations. Free, no sign-in.
