§ 13.08.320 — Reporting and monitoring requirements

Stockton Municipal Code, California (Code 2026-10-13: eCode360 publication current through the 2026-10-13 codification (scraped 2026-11-17)) · Stockton Municipal Code § 13.08.320

Corpus is an independent public-information project, not the official City of Stockton website. Stable reference: corpuslaw.us/code/46d7357c-4c86-47f0-9289-16440664fc1d

§ 13.08.320: Reporting and monitoring requirements.

A. The Director shall require users, including significant industrial users, to submit periodic monitoring and compliance reports. Such reports may consist of baseline monitoring reports, compliance schedule reports, reports on compliance with categorical deadlines, periodic reports from categorical users, and periodic compliance reports from significant noncategorical users, and, at a minimum, shall comply with the reporting requirements set forth in 40 CFR 403.12. In addition, industrial users subject to national pretreatment standards shall comply with all requirements governing those standards. In cases where the pretreatment standard requires compliance with a best management practice (BMP) or pollution prevention alternative, the user shall submit documentation required by the Director or the pretreatment standard necessary to determine the compliance status of the user. B. All reports and documentation required to be submitted pursuant to this section shall be signed by an authorized or duly authorized representative of the user and shall contain a certification statement as that required by 40 CFR 403.6(a)(2)(ii) which shall attest to the integrity of the analytical data submitted. Furthermore, all such users must keep records of monitoring activities and results for a minimum of three years, or longer in the case of unresolved litigation or when requested to do so by the approval authority. C. Industrial users shall notify the POTW at least 10 calendar days, if possible, prior to releasing any discharge which differs from the terms of the permit in measurable amounts with regard to the volume or character of pollutants contained in the discharge, including hazardous wastes. In addition, all users shall immediately notify the POTW and the appropriate local, State, and Federal agencies of any discharge which would be considered a hazardous waste if disposed of in a different manner. Any verbal notice given to the POTW as required by this chapter shall be followed by a written report of the particulars of each such incident within five calendar days after the user becomes aware or should have become aware of the discharge. In addition, all industrial users shall promptly notify the POTW at least 10 calendar days, if possible, in advance of any substantial change in the volume or character of pollutants in their discharge. D. Where sampling by a user, conducted pursuant to this section, indicates a violation, the user shall notify the POTW within 24 hours of becoming aware of the violation. Within 30 calendar days of discovering the violation, the user shall resample and submit a report of the results of the resampling to the POTW. The industrial user is not required to resample if the POTW performs monitoring at the industrial user's facility at least once a month or if the POTW performs sampling between the industrial user's initial sampling and when the industrial user receives the results of the initial sampling. If the City performs the sampling and analysis in lieu of the industrial user, the City shall perform the repeat sampling and analysis unless it notifies the user of the violation and requires the user to perform the repeat sampling and analysis. E. Samples collected to satisfy reporting requirements shall be based on data obtained through appropriate sampling and analysis performed during the period covered by the report, based on data that is representative of conditions occurring during the reporting period. 1. Except as indicated in subsections (E)(2) and (3), the user shall collect wastewater samples using 24-hour flow proportional composite sampling techniques, unless time proportional composite sampling or grab sampling is authorized by the Director. Where time proportional composite sampling or grab sampling is authorized by the Director, the samples shall be representative of the discharge. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: for cyanide, total phenols, and sulfides the samples may be composited in the laboratory or in the field; for volatile organics and oil and grease, the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the Director, as appropriate. In addition, grab samples may be required to show compliance with instantaneous limits. 2. Samples for oil and grease, temperature, pH, cyanide, total phenols, sulfides, and volatile organic compounds shall be obtained using grab collection techniques. 3. For sampling required in support of baseline monitoring and 90-day compliance reports required in Section 13.08.320 and 40 CFR 403.12(b) and (d), a minimum of four grab samples shall be used for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which historical sampling data do not exist; for facilities for which historical sampling data are available, the Director may authorize a lower minimum. For periodic compliance reports required by Section 13.08.320 and 40 CFR 403.12(e) and (h), the industrial user is required to collect the number of grab samples necessary to assess and assure compliance with applicable pretreatment standards and requirements. F. If a user subject to the reporting requirement in this section monitors any regulated pollutant at the appropriate sampling location more frequently than required by the Director, using the procedures prescribed in this section, the results of this monitoring shall be included in the report. G. Bypass. 1. For the purposes of this section: a. Bypass means the intentional diversion of wastestreams from any portion of a user's treatment facility. b. Severe property damage means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. 2. A user may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the provision of subsections (G)(3) and (4) of this section. 3. Bypass Notifications. a. If a user knows in advance of the need for a bypass, it shall submit prior notice to the POTW, at least 10 calendar days before the date of the bypass, if possible. b. A user shall submit oral notice to the POTW of an unanticipated bypass that exceeds applicable pretreatment standards within 24 hours from the time it becomes aware of the bypass. A written submission shall also be provided within five calendar days of the time the user becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact dates and times, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the bypass. The Director may waive the written report on a case-by-case basis if the oral report has been received within 24 hours. 4. Bypass Prohibition. a. Bypass is prohibited, and the Director may take an enforcement action against a user for a bypass, unless: i. Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; ii. There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and iii. The user submitted notices as required under subsection (G)(3) of this section. b. The Director may approve an anticipated bypass, after considering its adverse effects, if the Director determines that it will meet the three conditions listed in subsection (G)(4)(a) of this section. H. Upset. 1. For the purposes of this section, upset means an exceptional incident in which there is unintentional and temporary noncompliance with categorical pretreatment standards because of factors beyond the reasonable control of the user. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, failure to follow BMPs, or careless or improper operation. 2. An upset shall constitute an affirmative defense to an action brought for noncompliance with categorical Pretreatment Standards if the requirements of subsection (H)(3) are met. 3. A user who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or other relevant evidence that: a. An upset occurred and the user can identify the cause(s) of the upset; b. The facility was at the time being operated in a prudent and workman-like manner and in compliance with applicable operation and maintenance procedures; and c. The user has submitted the following information to the Director within 24 hours of becoming aware of the upset [if this information is provided orally, a written submission must be provided within five calendar days]: i. A description of the indirect discharge and cause of noncompliance, ii. The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue, and iii. Steps being taken and/or planned to reduce, eliminate, and prevent recurrence of the noncompliance. 4. In any enforcement proceeding, the user seeking to establish the occurrence of an upset shall have the burden of proof. 5. Users shall have the opportunity for a judicial determination on any claim of upset only in an enforcement action brought for noncompliance with categorical pretreatment standards. 6. Users shall control production of all discharges to the extent necessary to maintain compliance with categorical pretreatment standards upon reduction, loss, or failure of its treatment facility until the facility is restored or an alternative method of treatment is provided. This requirement applies in the situation where, among other things, the primary source of power of the treatment facility is reduced, lost, or fails. I. Baseline Monitoring Reports. 1. Within either 180 calendar days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing categorical industrial users currently discharging to or scheduled to discharge to the POTW shall submit to the Director a report which contains the information listed in subsection (I)(2). At least 90 calendar days prior to commencement of their discharge, new sources, and sources that become categorical industrial users subsequent to the promulgation of an applicable categorical standard, shall submit to the Director a report which contains the information listed in subsection (I)(2). A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged. 2. Users described above shall submit the information set forth below. a. All information required in Section 13.08.310(C). b. Measurement of Pollutants. i. The user shall provide the following information: (A) The categorical pretreatment standards applicable to each regulated process and any new categorically regulated processes for existing sources. (B) The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the Director, of regulated pollutants in the discharge from each regulated process. (C) Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported. (D) The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in Section 13.08.320(E) of this chapter. Where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the Director or the applicable standards to determine compliance with the standard. ii. The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this paragraph. iii. Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment the user should measure the flows and concentrations necessary to allow use of the combined wastestream formula in 40 CFR 403.6(e) to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e) this adjusted limit along with supporting data shall be submitted to the Control Authority. iv. Sampling and analysis shall be performed in accordance with Section 13.08.320(E). v. The Director may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures. vi. The baseline report shall indicate the time, date and place of sampling and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges to the POTW. c. Compliance Certification. A statement, reviewed by the user's authorized representative as defined in Section 13.08.080 and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements. d. Compliance Schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O&M must be provided. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in Section 13.08.400 of this chapter. e. Signature and Report Certification. All baseline monitoring reports must be certified in accordance with Section 13.08.320 of this chapter and signed by an authorized representative as defined in Section 13.08.080.

( Ord. 2015-12-08-1601 C.S. § 2 )

Ask a question about Stockton law

Corpus searches the Stockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.