§ 13.40.110 — Facilities and drawing submittal requirements
Stockton Municipal Code, California (Code 2026-10-13: eCode360 publication current through the 2026-10-13 codification (scraped 2026-11-17)) · Stockton Municipal Code § 13.40.110
Corpus is an independent public-information project, not the official City of Stockton website. Stable reference: corpuslaw.us/code/179e0002-02da-436b-9152-aaa3315884f8
§ 13.40.110: Facilities and drawing submittal requirements.
Upon request by the Director: A. Any FSE and/or property owner may be required to submit to the City two copies of facility site plans, floor plans, mechanical and plumbing plans, detail drawings showing all sewer locations and connections, and schematic drawings of grease interceptors, FOG control devices or other FOG control equipment and appurtenances by size, location and elevation. The submittal shall be in a form and content acceptable to the Director for review of the existing or proposed grease control device, monitoring facilities, metering facilities, and operating procedures. The review of the plans and procedures shall in no way relieve the FSE of the responsibility of modifying the facilities or procedures in the future as necessary to produce an acceptable discharge, and to meet the requirements of this chapter or the requirements of any other regulatory agency. B. The Director may require the drawings be prepared by a California registered civil, chemical, mechanical, or electrical engineer.
( Ord. 002-10 C.S. § 2, eff. 2-25-10 )
Ask a question about Stockton law
Corpus searches the Stockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.