For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.08.030 — Removal of rubbish and waste

Stockton Municipal Code, California (Code 2026-10-13: eCode360 publication current through the 2026-10-13 codification (scraped 2026-11-17)) · Stockton Municipal Code § 15.08.030

Corpus is an independent public-information project, not the official City of Stockton website. Stable reference: corpuslaw.us/code/bca5e7d0-90cc-4b85-ac5d-7bdc6fbf5c57

§ 15.08.030: Removal of rubbish and waste.

It is unlawful for any person, building contractor or subcontractor engaged in the repair, construction or demolition of any building or structure, or part thereof, to fail to remove from any street, alley, gutter, park, sidewalk, curbing, space between sidewalk and curbing, or any public way, building materials, wasted matter or rubbish deposited therein in connection with that portion of the repair, construction or demolition work under his or her special or general supervision. The person, building contractor or subcontractor must remove such building materials or waste matter within seven days of his or her final cessation of work on said building or structure, or part thereof.

( Prior code § 14-103 )

Ask a question about Stockton law

Corpus searches the Stockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.