§ 16.120.050 — Application filing, processing, and review procedures

Stockton Municipal Code, California (Code 2026-10-13: eCode360 publication current through the 2026-10-13 codification (scraped 2026-11-17)) · Stockton Municipal Code § 16.120.050

Corpus is an independent public-information project, not the official City of Stockton website. Stable reference: corpuslaw.us/code/1dab8d78-c3be-4f08-8d5c-225bfab34986

§ 16.120.050: Application filing, processing, and review procedures.

A. Optional Preliminary Design Review. The option of a preliminary design review is strongly encouraged and may be requested by applicants before the formal submittal of an application. This is an informal review by the Director or ARC in order to provide direction/guidance to project proponents before preparation of detailed designs/plans for formal application submittal. B. Application. The application shall be prepared in compliance with the Department handout for design review, filed with the Department, and accompanied by the fee required by the Council's fee resolution. C. Initial Review. Each application shall be reviewed by the Director to ensure that the application is consistent with this Development Code, the City of Stockton Citywide Design Guidelines (Guidelines), other design guidelines that may be adopted by the City, and the purpose and intent of this chapter. D. Procedures. 1. Review. a. Nondiscretionary Permits (Building Permit/Allowed Uses). For projects that do not require any type of discretionary approval, the applicant shall submit design review plans before building permit submittal. The ARC shall review the submitted plans for compliance with the Guidelines, other design guidelines that may be adopted by the City, and/or applicable Development Code standards, and make recommendations and supporting findings in compliance with subsection (D)(2). Following the ARC's review of the plans, the Director shall prepare and transmit a list of the ARC's findings and recommendations to the applicant in a timely manner, noting that a request for reconsideration may be submitted, where applicable. b. Discretionary Permit/Entitlement. For projects that require a discretionary approval of a development application (e.g., use permit, variance, land development permit, planned development permit, etc.), the applicant shall submit design review plans for the proposed project at the same time as the discretionary application is submitted to the Department. The Director shall review the project for compliance with the land use and development regulations contained in this Development Code. The ARC shall review the overall design of the project for compliance with the Guidelines and other design guidelines that may be adopted by the City. In reviewing the design of the project, the ARC shall use the guidelines as a reference, and make recommendations and supporting findings in compliance with subsection (D)(2). Following the ARC's review of the plans, the Director shall prepare and transmit a list of the ARC's findings and recommendations to the applicant in a timely manner, noting that a request for reconsideration may be submitted and/or that the Planning Commission is the final Design Review Authority, where applicable. 2. List of Recommendations. a. The list of findings and recommendations shall be forwarded: i. To the applicant within 30 working days from the date the application is deemed complete by the Director. ii. To the applicable Review Authority for consideration simultaneously with any accompanying discretionary permit/entitlement application. b. Where the recommendations would substantially alter a proposed development, the applicant may submit revised plans with a request for reconsideration by the ARC. 3. Resubmittals. Following a redesign of, or changes to, a project, the applicant shall resubmit an application for review and recommendation by the ARC. If a recommendation has not been reached by the ARC after two reviews, the project shall be referred directly to the Director for a decision. 4. Determination. Following submittal of the list of recommendations to the applicant and the submittal of any revisions and request for reconsideration, if applicable, the Review Authority shall review the design of the project in compliance with the list of recommendations in subsection (D)(2), and: a. Nondiscretionary Permits. Make a consistency determination. b. Discretionary Permit/Entitlement. i. Director. If the final Design Review Authority is the Director, the Director shall make a consistency determination. ii. Other Review Authorities. If the Director is not the final Design Review Authority, the Director shall make a written recommendation to the Review Authority and the Design Review plans shall be considered with the application(s) by the applicable Review Authority identified in Table 4-1 (Review Authority). Following review of the design review plans, the Review Authority shall make a consistency determination. E. On-Site Review. The review may include on-site inspection of the subject parcel, if deemed necessary by the ARC or the Director.

( Prior code § 16-515.050 ; Ord. 002-06 C.S. § 1 ; Ord. 015-09 C.S., eff. 12-3-09 )