§ 16.208.030 — Monuments
Stockton Municipal Code, California (Code 2026-10-13: eCode360 publication current through the 2026-10-13 codification (scraped 2026-11-17)) · Stockton Municipal Code § 16.208.030
Corpus is an independent public-information project, not the official City of Stockton website. Stable reference: corpuslaw.us/code/a592dde6-a283-43c2-8850-af0b3e604cf8
§ 16.208.030: Monuments.
In surveying a subdivision, the engineer or surveyor shall set sufficient permanent monuments so that any part of the survey may be readily retraced. Survey monuments shall be set by the engineer or surveyor for all new subdivisions requiring a parcel map or final map (Chapter 16.184, Requirements to File Subdivision Maps), unless waived by the City Engineer, in compliance with this section. A. Boundary Monuments. 1. Boundary monuments shall be set on the exterior boundary of the subdivision at all corners, angle points, beginnings and ends of curves and at intermediate points approximately 1,000 feet apart. The locations of inaccessible points may be established by ties and shall be so noted on the final map or parcel map. 2. All exterior boundary monuments shall be set prior to recordation of the final map or parcel map or as certified on the final map or parcel map. B. Interior Monuments. Whenever interior monuments are required, the monuments shall be set at: 1. All block and lot corners and angle points; 2. The beginnings and ends of curves; 3. Points of intersection with centerlines of other existing and proposed streets and alleys; and 4. The points of intersection with the exterior boundary lines. C. Monument Type and Positioning. All monuments set in the course of the survey shall be as specified by the City Engineer and shall be set to the depth and in the manner prescribed by the City Engineer. D. Identification Marks. All monuments shall be permanently and visibly marked or tagged with the registration or license number of the engineer or surveyor who signs the engineer's or surveyor's certificate and under whose supervision the survey is made. E. Replacement of Destroyed Monuments. Any monument which is disturbed or destroyed before acceptance of all improvements by the City shall be replaced by the developer. F. Timing of Monument Installation. The timing of the installation of a monument shall be in compliance with the Map Act (Section 66496). G. Notice of Completion. Within five days after all monuments have been set, the engineer or surveyor shall give written notice to the developer and the City Engineer that the final monuments have been set. Verification of payment to the engineer or surveyor shall be filed as required by the Map Act (Article 9, Chapter 4). The cost of setting monuments shall be included in the engineer's estimate for improvements in compliance with Section 16.72.070 (Improvements (plans, agreements and security)). If requested, this amount of the bond may be released upon verification of the setting of the monuments by the City Engineer. H. Inspection and Approval. All monuments shall be subject to the inspection and approval of the City Engineer.
( Prior code § 16-680.030 )
Ask a question about Stockton law
Corpus searches the Stockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
