For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.12.150 — Reporting Requirements

Code of Ordinances, City of Sunnyvale, California (includes legislation through Ord. No. 3260-26 adopted August 11, 2026) · Sunnyvale Code of Ordinances § 12.12.150

Corpus is an independent public-information project, not the official City of Sunnyvale website. Stable reference: corpuslaw.us/code/f6558b30-99b0-4718-b686-dccb726bef6b

§ 12.12.150: Reporting Requirements.

(a) Baseline Monitoring Reports. (1) Within either one hundred eighty days after the effective date of a categorical pretreatment standard, or the EPA final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing categorical industrial users currently discharging to or scheduled to discharge to the POTW shall submit to the director a report which contains the information listed in subsection 2 of this section. At least ninety days prior to commencement of their discharge, new sources, and sources that become categorical industrial users subsequent to the promulgation of an applicable categorical standard, shall submit to the director a report which contains the information listed in subsection 2 of this section. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged. (2) Users described above shall submit the information set forth below: (i) All information required in Section 12.12.160(a)(1), (a)(3), (a)(4), and (a)(11); (ii) Measurement of pollutants: (A) The user shall provide the information required in Section 12.12.160(a)(13)(i) through (iv), (B) The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this paragraph, (C) Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment the user should measure the flows and concentrations necessary to allow use of the combined wastestream formula in 40 CFR 403.6(e) to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e) this adjusted limit along with supporting data shall be submitted to the city, (D) Sampling and analysis shall be performed in accordance with Section 12.12.118, (E) The director may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures, (F) The baseline report shall indicate the time, date and place of sampling and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant Discharges to the POTW. (3) Compliance Certification. A statement, reviewed by the user's authorized representative as defined in Section 12.04.030(1) and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance and/or additional pretreatment is required to meet the pretreatment standards and requirements. (4) Compliance Schedule. If additional pretreatment and/or operations and maintenance will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or operations and maintenance must be provided. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in Section 12.12.150(b) of this chapter. (5) Signature and Report Certification. All baseline monitoring reports must be certified in accordance with Section 12.12.310 of this chapter and signed by an authorized representative as defined in Section 12.04.030(1). (b) Compliance Schedule Progress Reports. The following conditions shall apply to the compliance schedule required by Section 12.12.150(a)(4) of this chapter: (1) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation); (2) No increment referred to above shall exceed nine months; (3) The user shall submit a progress report to the director no later than fourteen days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the user to return to the established schedule; and (4) In no event shall more than nine months elapse between such progress reports to the director. (c) Reports on Compliance with Categorical Pretreatment Standard Deadline. Within ninety days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the POTW, any user subject to such pretreatment standards and requirements shall submit to the director a report containing the information described in Section 12.12.160(a)(12) and (14) and 12.12.150(a)(2)(ii) of this chapter. All compliance reports must be signed and certified in accordance with Section 12.12.310 of this chapter. All sampling will be done in conformance with Section 12.12.118. (d) Periodic Compliance Reports. (1) Except as specified in subsection 2 of this section, all significant industrial users must, at a frequency determined by the director submit no less than twice per year on dates specified reports indicating the nature, concentration of pollutants in the discharge which are limited by pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. In cases where the pretreatment standard requires compliance with a best management practice (bmp) or pollution prevention alternative, the user must submit documentation required by the director or the pretreatment standard necessary to determine the compliance status of the user. (2) The director may authorize an industrial user subject to a categorical pretreatment standard to forego sampling of a pollutant regulated by a categorical pretreatment standard if the industrial user has demonstrated through sampling and other technical factors that the pollutant is neither present nor expected to be present in the discharge, or is present only at background levels from intake water and without any increase in the pollutant due to activities of the industrial user. This waiver is subject to the following conditions: (i) The waiver may be authorized where a pollutant is determined to be present solely due to sanitary wastewater discharged from the facility provided that the sanitary wastewater is not regulated by an applicable categorical standard and otherwise includes no process wastewater. (ii) The monitoring waiver is valid only for the duration of the effective period of the individual wastewater discharge permit, but in no case longer than five years. The user must submit a new request for the waiver before the waiver can be granted for each subsequent individual wastewater discharge permit. See Section 12.12.160(a)(14). (iii) In making a demonstration that a pollutant is not present, the industrial user must provide data from at least one sampling of the facility's process wastewater prior to any treatment present at the facility that is representative of all wastewater from all processes. (iv) The request for a monitoring waiver must be signed in accordance with Section 12.04.030(1), and include the certification statement in Section 12.12.310(a). (v) Nondetectable sample results may be used only as a demonstration that a pollutant is not present if the EPA approved method from 40 CFR Part 136 with the lowest minimum detection level for that pollutant was used in the analysis. (vi) Any grant of the monitoring waiver by the director must be included as a condition in the user's permit. The reasons supporting the waiver and any information submitted by the user in its request for the waiver must be maintained by the director for three years after expiration of the waiver. (vii) Upon approval of the monitoring waiver and revision of the user's permit by the director, the industrial user must certify on each report with the statement in Section 12.12.310(b), that there has been no increase in the pollutant in its wastestream due to activities of the industrial user. (viii) In the event that a waived pollutant is found to be present or is expected to be present because of changes that occur in the user's operations, the user must immediately comply with the monitoring requirements of Section 12.12.150(d)(1), or other more frequent monitoring requirements imposed by the director, and notify the director. (ix) This provision does not supersede certification processes and requirements established in categorical pretreatment standards, except as otherwise specified in the categorical pretreatment standard. (3) All periodic compliance reports must be signed and certified in accordance with Section 12.12.310 of this chapter. (4) All wastewater samples must be representative of the user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge. (5) If a user subject to the reporting requirement in this section monitors any regulated pollutant at the appropriate sampling location more frequently than required by the director, using the procedures prescribed in Section 12.12.118 of this chapter, the results of this monitoring shall be included in the report. (e) Monitoring and Analysis to Demonstrate Continued Compliance. The reports required in subsections (a), (b), (c), and (d) of this section shall contain the results of sampling and analysis of the discharge, including the flow and the nature and concentration, or production and mass where requested by the POTW, of pollutants contained therein which are limited by the applicable pretreatment standards. This sampling and analysis may be performed by the POTW in lieu of the industrial user. Where the POTW performs the required sampling and analysis in lieu of the industrial user, the user will not be required to submit the compliance certification required under subsections (a)(5) and (c) of this section. In addition, where the POTW itself collects all the information required for the report, including flow data, the industrial user will not be required to submit the report. (f) Reports from Unpermitted Users. All users not required to obtain an individual wastewater discharge permit shall provide appropriate reports to the director as the director may require.

( Ord. 2490-94 § 1 ; Ord. 2896-09 § 19 )

Ask a question about Sunnyvale law

Corpus searches the Sunnyvale sections it holds and shows the ones that match, with their citations. Free, no sign-in.