§ 16.27.080 — Flood management
Municipal Code, City of Temecula, California (legislation through Ord. No. 2026-04 adopted April 14, 2026) · Temecula Municipal Code § 16.27.080
Corpus is an independent public-information project, not the official City of Temecula website. Stable reference: corpuslaw.us/code/3f184f94-70b0-4b89-83b7-ddad1e4d2997
§ 16.27.080: Flood management.
Prior to approval of any tentative map or parcel map, the subdivider shall demonstrate, to the satisfaction of the director of public works, that the design of the subdivision is such that it conforms with Chapter 17.20 of the city's Municipal Code. The director of public works may require studies, mapping, easements, design and construction as part of the final or parcel map processing to ensure that this requirement is met. Unless otherwise permitted by this title, no final tract map shall be recorded if additional studies, engineering design, acquisition of easements or construction of flood control facilities are required for issuance of any building permit for the subdivision. The director of public works shall make a copy of all approved studies available to the public. Such studies shall be prepared under the direction of a registered civil engineer.
( Ord. 99-23 § 1 )
Ask a question about Temecula law
Corpus searches the Temecula sections it holds and shows the ones that match, with their citations. Free, no sign-in.