§ 17.22.174 — Infrastructure and Development Phasing
Municipal Code, City of Temecula, California (legislation through Ord. No. 2026-04 adopted April 14, 2026) · Temecula Municipal Code § 17.22.174
Corpus is an independent public-information project, not the official City of Temecula website. Stable reference: corpuslaw.us/code/3d61e087-c8d7-4b0d-bac8-a493e2715f57
§ 17.22.174: Infrastructure and Development Phasing.
Development of Rancho Pueblo is expected to take place over a number of years, reflecting the congregational growth in the Church and market demand for professional and commercial facilities in the area. While each component of the Rancho Pueblo project may be developed separately, they will do so under the guidelines developed herein and, when needed, the citywide design guidelines. Development may proceed sequentially or concurrently, with each portion contributing piece-by-piece to the overall vision, acting as a microcosm of the way in which a well-planned city develops. Construction of the planned first phase of buildings will begin immediately following initial site grading. The development schedule for the Church and School site is currently planned in five phases. The initial phase is the most extensive, including construction of the family life center/interim sanctuary, chapel, preschool/elementary school complex, the first phase of the administration building, east and west sports fields with the associated western storage building, and construction of two groupings of temporary, modular buildings (A and B) at the rear and front of the site, respectively. Phase two, includes construction of the adult education building, the first phase of the elementary school, the second phase of the administration building, and the eastern field house and an additional storage building. The third phase of the Church and School site commences with the removal of the rear (A), temporary, modular buildings and progresses to the addition of the high school building, first phase of the gymnasium, completion of the elementary school and the final storage building. Phase four, begins with removal of the remaining, front-most (B) temporary modular buildings and continues with the construction of the middle school and completion of phase two of the gymnasium. The fifth, and final, phase involves construction of the worship center and the necessary, associated, parking structure. A high degree of flexibility is designed into the Church project to allow for possible alternative building phasing if the need arises. Should funds be available or needs arise earlier than initially planned, later phases of the Church's development may be accelerated. It is expected that, in contrast to the Church and Schools site, the professional center areas to the east and west of the site will develop reasonably quickly in accordance with market dictates. The expected first phase will be construction of the self-storage facility at the rear of the eastern site followed by the professional office on the eastern site, with the final phase being the medical office buildings on the western site. Similar to the Church portion of Rancho Pueblo, these areas have a great deal of flexibility allowed in their design to incorporate the diversity of uses permitted. Initial development within the PDO Area shall include the installation of all improvements on both sides of Rancho Pueblo Road from its intersection with SR-79 South to its intersection with Chapel Lane. This includes curbs, sidewalks, and landscape planting design and installation on both sides of the street (for a minimum of sixteen feet from the face of curb) and both corner entry statements of Rancho Pueblo at SR-79 South. A. Utilities. Major infrastructure needs within the PDO area will be planned at one time and designed for construction in a manner that will serve both initial and long-term build-out needs. Backbone corridors will be planned and set forth, within dedicated public streets or easements where appropriate, and delineated in concert with the appropriate utility district or other utility purveyor. B. Grading and Drainage. It is anticipated that, at the time of adoption of this PDO, site grading and associated drainage will occur in a single phase (Figures 20 and 21). Site grading is expected to be one percent minimum fall, with on-site and through-site drainage accommodated in a combination of street storm drains, culverts and overland channels. [image] Fig. 20 Planned Development Overlay PA01-0522Grading Exhibit [image] Fig. 21 Planned Development Overlay PA01-0522Drainage Exhibit
( Ord. 09-01 § 4 )
Ask a question about Temecula law
Corpus searches the Temecula sections it holds and shows the ones that match, with their citations. Free, no sign-in.