§ 18.21.080: Requirements of professional engineers/architect.

A. It shall be the responsibility of the civil engineer, who prepared the construction and/or grading plans, to incorporate the applicable recommendations from the geotechnical engineering and geology reports and to incorporate any city engineer approved alternatives into the construction and/or grading plan. 1. The civil engineer shall be responsible for establishing line and grade for the grading and drainage improvements and shall act as the coordinating agent in the event the need arises for liaison between the other professionals, the contractor and the city engineer. 2. The civil engineer shall be responsible for the preparation of plan revisions to be approved by the city engineer, prior to implementing the change in the field. 3. Prior to issuance of building permits for any given lot or lots, the civil engineer shall be responsible for submitting a pad certification letter stating line and grade as evidence that the grading activity has been completed within standard tolerances in accordance with the approved plans and that all embankments, cut slopes and pad sizes are as shown on the approved plans. B. The geotechnical engineer's area of responsibility shall include, but not be limited to, performing the preliminary geotechnical engineering investigation and report, determining the suitability of soils during grading, providing compaction inspection and testing and preparing the final geotechnical engineering report. C. The engineering geologist's area of responsibility shall include, but not be limited to, professional inspection and approval of the stability of cut slopes with respect to geological matters and the need for subdrains or other groundwater drainage devices. He or she shall report his or her findings to the geotechnical engineer for engineering analysis. D. The landscape architect shall incorporate applicable recommendations from the geotechnical engineering reports into the landscape and irrigation plans. The landscape architect shall also prepare plan revisions to be approved by the city engineer, prior to implementing the change in the field. All groundcover shall provide one hundred percent coverage within nine months of planting or additional landscaping shall be required in order to meet this standard.

( Ord. 13-01 § 4 )