§ 18.24.040: Permits.
A. All applicants requesting a grading permit (for work related to mass, rough, precise, borrow site/stockpile, erosion and sediment control, administrative clearing, rock blasting, paving/watercourse alterations), a haul route permit and an encroachment permit, as required by this title, shall pay all fees and/or deposits, as required by this title and by city council resolution establishing applicable fees and deposits. All permit fees shall be collected prior to issuance of permit. B. A permit may expire in one hundred eighty days from the date of issuance in accordance with Sections 18.06.160 and 18.12.120 unless it is formally extended. 1. If the permit has expired, the applicant shall be required to resubmit a new application and pay a permit issuance fee based on the city's current fee schedule. 2. If the permit is officially extended, as a condition of said extension of any time period, the city engineer may require the payment of additional permit, plan checking, inspection and/or soils review fees required to cover the administration of the extensions and/or increased costs to the city and to bring the project into conformance with any fee schedule in effect at the time of extension. C. The fee for a permit, authorizing additional work under a valid permit, shall be the difference between the fee paid for the original permit and the fee shown for the entire project, as indicated in the city's current fee schedule. D. Failure to pay fees and obtain a permit, before commencing work, shall be deemed a violation of this title, except where it can be proven to the satisfaction of the city engineer that an emergency existed that made it impractical to first obtain the permit. A violation shall result in an assessment of double permit fees (per the city engineer) that shall be in addition to the required permit fee for work done prior to permit issuance. Payment of such fees shall not relieve any person from fully complying with the requirements of this title. E. A separate permit shall be required for each separate (noncontiguous) site. One permit may cover both an excavation and a fill on the same site.
( Ord. 13-01 § 4 )
Ask a question about Temecula law
Corpus searches the Temecula sections it holds and shows the ones that match, with their citations. Free, no sign-in.