§ 411.1.070 — Stormwater pollution control requirements

Municipal Code, City of Torrance, California · Torrance Municipal Code § 411.1.070

Corpus is an independent public-information project, not the official City of Torrance website. Stable reference: corpuslaw.us/code/239b635a-c4b7-4e3e-a5f2-f11596d824f4

§ 411.1.070: Stormwater pollution control requirements.

a) The site for every planning priority project shall be designed to control pollutants, pollutant loads, and runoff volume to the maximum extent feasible by minimizing impervious surface area and controlling runoff from impervious surfaces through infiltration, evapotranspiration, bioretention and/or rainfall harvest and use. 1) A new single-family hillside home development shall include mitigation measures to: A) Conserve natural areas; B) Protect slopes and channels; C) Provide storm drain system stenciling and signage; D) Divert roof runoff to vegetated areas before discharge unless the diversion would result in slope instability; and E) Direct surface flow to vegetated areas before discharge, unless the diversion would result in slope instability. 2) Street and road construction of ten thousand (10,000) square feet or more of impervious surface shall follow U.S. EPA guidance regarding Managing Wet Weather with Green Infrastructure: Green Streets (December 2008 EPA-833-F-08-009) to the maximum extent practicable. 3) The remainder of planning priority projects shall prepare a LID Plan to comply with the following: A) Retain stormwater runoff on site for the stormwater quality design volume (SWQDv) defined as the runoff from: i) The eighty-fifth (85th) percentile twenty-four (24) hour runoff event as determined from the Los Angeles County eighty-fifth (85th) percentile precipitation isohyetal map; or ii) The volume of runoff produced from a three-quarters (0.75) inch, twenty-four (24) hour rain event, whichever is greater. B) When, as determined by the Community Development Department, one hundred percent (100%) on-site retention of the SWQDv is technically infeasible, partially or fully, the infeasibility shall be demonstrated in the submitted LID Plan. The technical infeasibility may result from conditions that may include, but are not limited to: i) The infiltration rate of saturated in-situ soils is less than three-tenths (0.3) inch per hour and it is not technically feasible to amend the in-situ soils to attain an infiltration rate necessary to achieve reliable performance of infiltration or bioretention BMPs in retaining the SWQDv on site; ii) Locations where seasonal high groundwater is within five (5) to ten (10) feet of surface grade; iii) Locations within one hundred (100) feet of a groundwater well used for drinking water; iv) Brownfield development sites or other locations where pollutant mobilization is a documented concern; v) Locations with potential geotechnical hazards; vi) Smart growth and infill or redevelopment locations where the density and/or nature of the project would create significant difficulty for compliance with the on-site volume retention requirement. C) If partial or complete on-site retention is technically infeasible, the project site may biofiltrate one and one-half (1.5) times the portion of the remaining SWQDv that is not reliably retained on site. Biofiltration BMPs must adhere to the design specifications provided in the municipal NPDES permit. i) Additional alternative compliance options such as off-site infiltration may be available to the project site. The project site should contact the Community Development Department to determine eligibility. Alternative compliance options are further specified in California Stormwater Quality Association BMP handbooks. D) The remaining SWQDv that cannot be retained or biofiltered on site must be treated on site to reduce pollutant loading. BMPs must be selected and designed to meet pollutant-specific benchmarks as required per the municipal NPDES permit. Flow-through BMPs may be used to treat the remaining SWQDv and must be sized based on a rainfall intensity of: i) Two-tenths (0.2) inches per hour; or ii) The one (1) year, one (1) hour rainfall intensity as determined from the most recent Los Angeles County isohyetal map, whichever is greater. E) A multi-phased project may comply with the standards and requirements of this Section for all of its phases by: i) Designing a system acceptable to the Community Development Department to satisfy these standards and requirements for the entire site during the first phase; and ii) Implementing these standards and requirements for each phase of development or redevelopment of the site during the first phase or prior to commencement of construction of a later phase, to the extent necessary to treat the stormwater from such later phase. For purposes of this Section, "multi-phased project" shall mean any planning priority project implemented over more than one (1) phase and the site of a multi-phased project shall include any land and water area designed and used to store, treat or manage stormwater runoff in connection with the development or redevelopment, including any tracts, lots, or parcels of real property, whether developed or not, associated with, functionally connected to, or under common ownership or control with such development or redevelopment.

Ask a question about Torrance law

Corpus searches the Torrance sections it holds and shows the ones that match, with their citations. Free, no sign-in.