§ 74.6.6 — Completion of work
Municipal Code, City of Torrance, California · Torrance Municipal Code § 74.6.6
Corpus is an independent public-information project, not the official City of Torrance website. Stable reference: corpuslaw.us/code/2e9d15f8-a299-42e5-8aa1-77fdbb42b502
§ 74.6.6: Completion of work.
a) After an excavation, cut or fill in or under the surface of any street or other public place, or in the construction, alteration or reconstruction of any improvements thereon or therein is commenced, such work shall be prosecuted diligently to completion. b) Every permit for making an excavation for a sewer lateral connection to a main sewer, or for any service connection, or for making repairs to the same, shall be void unless all work to be done pursuant thereto shall be done and the same area so excavated, cut or filled is resurfaced with permanent pavement in the manner required by this Code within forty-five (45) days after the date such permit was issued, unless otherwise specified by the City Engineer. The City Engineer may grant extensions of time for periods not exceeding fifteen (15) days for the performance of such work and resurfacing whenever the City Engineer shall deem that good cause exists therefor. If any such extension of time be granted, such permit shall be void unless all such work and resurfacing shall be done in the manner required by this Code prior to the expiration of such extension of time. Any excavation, cut or fill made for the purpose of constructing a sewer lateral shall be completed with temporary pavement in the manner required by this Code within three (3) days after inspection of the pipe by the City Engineer, if a pipe is laid, and nothing herein contained shall be deemed or construed to allow a longer period of time therefor. c) Every street excavation permit, except one issued for the purposes specified in subsection b), shall be void unless all work to be done pursuant thereto shall be completed and the public improvements affected by such work shall be resurfaced with permanent paving in the manner required by this Code within sixty (60) days after the date of issuance of such permit. The City Engineer may grant extensions of time for periods not exceeding thirty (30) days for the performance of such work and resurfacing whenever the City Engineer shall deem that good cause exists therefor. If any such extension of time be granted, such permit shall be void unless all such work shall be done and such improvements shall be resurfaced with permanent pavement in the manner required by this Code prior to the expiration of such extension of time. d) Notwithstanding the above provisions of this Section, every street excavation permit shall be void unless the public improvement affected thereby is replaced and resurfaced with temporary pavement within fifteen (15) days from the date of the commencement of the work to be performed under the permit; provided, however, that trenches longer than two hundred (200) feet shall be refilled and resurfaced with temporary pavement within thirty (30) days after the commencement of such work; and provided further, that curbs, sidewalks or gutters excavated or cut pursuant to such permit shall be replaced in permanent form within fifteen (15) days after the date of such excavation or cut. The City Engineer may grant extensions of time as provided in subsection c). Notwithstanding the above provisions of this subsection, such provisions shall not apply where excavations, cuts, fills or trenches are resurfaced with permanent pavement within the time limits specified therein for temporary pavement. e) If any person shall fail to replace, repair, resurface, repaint or restripe or replace traffic control signs on or within any public improvement within the time required by this Section and in the manner required by this Code, then the City or a contractor hired by the City may complete the replacement, repair, resurfacing, repainting or restriping of such improvement in the manner required by this Code. In such event, the City of Torrance shall retain the cost of such work, plus fifteen (15) percent thereof for engineering, inspection and administrative overhead, from the special or general deposit made for such work, or from the deposits set forth in subsection f) of Section 74.6.4
[Amended by Ord. 1073 ; Ord. 3177 ]
Ask a question about Torrance law
Corpus searches the Torrance sections it holds and shows the ones that match, with their citations. Free, no sign-in.
