For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 76.5.8 — Conversion to reclaimed water

Municipal Code, City of Torrance, California · Torrance Municipal Code § 76.5.8

Corpus is an independent public-information project, not the official City of Torrance website. Stable reference: corpuslaw.us/code/2fe3f18e-b27a-4370-8101-92c7aa06ad5c

§ 76.5.8: Conversion to reclaimed water.

a) The City Engineer, in consultation with prospective reclaimed water users, shall implement a program of review of each parcel of property within the City to determine which parcels would be appropriate for using reclaimed water for industrial processing, landscape irrigation, or other appropriate uses by the then existing users. b) In making such determination, the City Engineer, in consultation with prospective reclaimed users, shall consider, but not be limited to, the following factors: 1) Whether reclaimed water is available to the site. 2) Whether the uses, processes or equipment used on the site can safely and effectively be operated with reclaimed water. 3) Whether it is feasible to modify on-site facilities to utilize reclaimed water. 4) Whether the use of reclaimed water would be cost effective, technically feasible and cost competitive for prospective reclaimed water customers. c) If a property is identified as being suitable for use of reclaimed water and reclaimed water is available to the site, the property owner shall be so notified. d) Within six (6) months of such notification, the property owner or the occupant of the property must either: apply for the use of reclaimed water and commence the necessary work to convert to reclaimed water, or provide satisfactory evidence to the City that conversion of the site to use reclaimed water is not technically or economically feasible, or would result in the loss or diminution of an existing water right, or would be harmful to the public health, safety, welfare or to the environment. At the time of commencing the work, the property owner shall furnish the City a schedule showing the time frame of when the conversion work will be completed. The City Engineer may grant an extension of time for the preparation of studies, environmental review or other good reason. e) In the event the property owner or the occupant fails, neglects, or refuses to convert to the use of reclaimed water, such owner or occupant shall pay to the City a surcharge on the amount of potable water used on the site in an amount to be set from time-to-time by resolution of the City Council.

Ask a question about Torrance law

Corpus searches the Torrance sections it holds and shows the ones that match, with their citations. Free, no sign-in.