§ 97.5.9: Safety standards.

a) All derricks and portable masts shall be maintained free from patent structural defects and free from any patent defect which might render such derrick or mast a hazard to life or property. b) All portable masts shall be equipped with wind guy lines; provided, however, that outriggers may be used instead of wind guy lines in those cases where it has been determined by a registered engineer that, due to the physical characteristics of the site, it is impracticable to use guy lines for wind loading. c) All wind guy lines, and outriggers used in place of wind guy lines, shall be designed to withstand wind loads as set forth in the said API Specifications. d) All wind guy lines shall be anchored to permanent concrete deadmen which shall be of sufficient strength and size, as determined by a registered engineer, to safely accommodate the tension and weight to be placed thereon. Screw-in type anchors shall not be used. e) All outriggers used in place of wind guy lines shall rest on permanent pads which shall be of sufficient strength and size, as determined by a registered engineer, to safely accommodate the tension and weight to be placed thereon. f) In all cases where outriggers are used in place of wind guy lines, tubing shall be pulled and stacked in single lengths only. g) Lights shall be installed and used during nighttime drilling on all derricks and portable masts and at other times when necessary for safety purposes. h) All derricks and portable masts shall rest on a permanent foundation which shall be of sufficient strength and size as determined by a registered engineer, to safely accommodate the tension and weight to be placed thereon by the derrick or mast with full rack of drill pipe. i) Notwithstanding the provisions of subsections d), e) and h) of this Section 97.5.9., permanent concrete deadmen, permanent concrete pads and permanent concrete foundations need not be installed as otherwise required by said subsections for an oil well abandonment operation; provided, however, that in lieu thereof deadmen, pads and foundations shall be used which, in the opinion of a registered engineer, are of sufficient strength and size to safely accommodate the tension and weight to be placed thereon. j) All derricks and portable masts shall be provided with a wind gauge indicator in a location satisfactory to the Director of Building and Safety.

[Amended by Ord. 2893 ]