§ 17.12.030 — Water Efficient Project Requirements
Code of Ordinances, City of Upland, California (eCode360 UP5026 version 2025-09-22: Includes legislation through Ord. No. 2002 adopted September 22, 2025) · Upland Zoning Code § 17.12.030
Corpus is an independent public-information project, not the official City of Upland website. Stable reference: corpuslaw.us/code/79e82966-3999-4588-bf03-d265d7b84d8c
§ 17.12.030: Water Efficient Project Requirements.
A. General Submittal Requirements. 1. Applicants for projects that are subject to the water efficiency requirements of this chapter in accordance with Section 17.12.020 shall submit complete landscaping and irrigation plans prepared by a licensed landscape architect for review and approval prior to the issuance of construction permits. 2. Applicants for homeowner-installed landscapes at single-family residences shall submit complete landscaping and irrigation plans, which may be prepared by a licensed landscape architect, landscape professional, or self-prepared, for review and approval prior to the issuance of construction permits. 3. Applicants for projects that require other discretionary approvals shall submit conceptual landscaping plans for design review in accordance with Chapter 17.44 and in conjunction with the other discretionary applications, and the submittal and approval of landscape and irrigation construction plans shall be required as a condition of approval. 4. Applicants for projects that do not require discretionary approvals, the applicant shall submit landscape and irrigation construction plans as a ministerial application that demonstrate conformance with the requirements set forth in this chapter. B. Conceptual Landscape Plan. Conceptual landscape plans shall be submitted in conjunction with other discretionary applications and shall include: 1. A design statement indicating that the annual applied water use will not exceed the maximum annual applied water allowance; 2. The estimated total annual applied water use (ETWU) and the maximum annual applied water allowance (MAWA) calculation for the project; 3. A description of any existing plant material to be retained or removed; 4. A plan showing the planting areas and hydrozones, plant species and spacing, natural features, water features and all paved areas; 5. A legend listing the plant name (botanical and common) and total quantities by container size and species; 6. Identification of amenities, boulders, pools, fountains, and other features; 7. Identification of headers and curbs; 8. Calculation of paved areas, including parking areas; 9. Calculation of required parking lot and site landscape areas; 10. Calculation of total on-site landscape in square feet and by percentage of lot; 11. If available or required for the project, an approved grading plan shall be submitted for reference. C. Landscape and Irrigation Construction Plans. All landscape construction plan submittals shall include a planting and soils plan and irrigation and water management plan, including detailed project notes and legends necessary and sufficient for a complete landscape plan review by the city. 1. Planting and Soils Plan. a. A description of any existing plant material to be retained or removed; b. A plan showing the planting areas and hydrozones, plant species and spacing, natural features, water features and all paved areas; c. A legend listing the plant name (botanical and common) and total quantities by container size and species; d. A description of the seed mixes with application rates; e. Identification of amenities, boulders, pools, fountains, and other features; f. Identification of headers and curbs; g. Calculation of paved areas, including parking areas; h. Calculation of required parking lot and site landscape areas; i. Calculation of total on-site landscape in square feet and by percentage of lot; j. Soil test results and recommendations; k. If available or required for the project, an approved grading plan shall be submitted for reference. 2. Irrigation and Water Management Plan. a. A plan showing the location, installation details, specifications, and water efficiency status of all irrigation components, including, but not limited to, control valves, irrigation heads, irrigation head radius and gallons per minute (GPM), line sizes and pipe schedules, hose bibs or quick coupler valves, irrigation controllers, backflow devices, and power supply; b. Pressure calculations; c. The estimated total water use (ETWU) and the maximum annual applied water allowance (MAWA) calculation for the project; d. A design statement indicating that the estimated annual applied water use will not exceed the maximum annual applied water allowance; e. Water conservation methods to be applied; f. Seasonal irrigation water schedules or procedures for programming of proposed controllers; g. Identification of the party(ies) responsible for implementation of water management; h. Maintenance schedule for the ongoing operation and maintenance of the irrigation system
Ask a question about Upland law
Corpus searches the Upland sections it holds and shows the ones that match, with their citations. Free, no sign-in.