§ 23-310 — Inspections
Municipal Code of the City of West Covina, California (Codified through Ordinance No. 2531, adopted July 15, 2025. (Supp. No. 94)) · West Covina Municipal Code § 23-310
Corpus is an independent public-information project, not the official City of West Covina website. Stable reference: corpuslaw.us/code/83c3a5bc-0ac2-4b41-a9d0-acbbf81fcdfa
Sec. 23-310. - Inspections.
The city engineer shall make an inspection of the annular seal construction work. It may make an initial inspection of each proposed drilling site, an inspection at the completion of the work, and inspections at such other times as it deems necessary. (a) Initial inspection: Upon receipt of an application, the city engineer may make an inspection of the drilling site prior to the issuance of a well permit. The purpose of this inspection is to determine whether there are any site conditions such that the enforcement agency shall do the following: (1) Relocation of drilling site: Require relocation of the drilling site should the location shown on the permit application be too close to potential sources of pollution. (2) Additional conditions: Set additional conditions if needed to remediate any previously unknown ground water quality protection problems. (b) Inspection of well seal: The city engineer shall inspect the annular space grout depth prior to the sealing. (1) Required notice: The city engineer shall be notified by the well driller in writing a minimum of twenty-four (24) hours prior to sealing the annular space. Drillers who anticipate completing a well in less than one (1) day shall notify the city engineer in writing twenty-four (24) hours prior to commencement of drilling and provide the anticipated time to commence the sealing of the annular space. (2) Should city engineer fail to be present: If the city engineer wishes to allow a seal to be tremied or placed without inspection, the driller shall seal the well in accordance with the standards of this article and any permit conditions. No seal shall be tremied or placed until written permission to proceed is given. (c) Final inspection: If requested by the city engineer in the permit, the driller shall notify the city engineer in writing within seven (7) days of the completion of their work at each drilling site. The city engineer may make a final inspection after completion of the work to determine whether the well was completed in accordance with this article. (d) Waiver of inspections: The city engineer may waive inspections should any of the following conditions exist: (1) Well inspected by other agencies: Inspections may be waived where the work will be inspected by the staff of the California Regional Water Quality Control Board or the California Department of Health Services if these designated agencies will inspect and report to the city engineer on all drilling features required by the standards. (2) Monitoring wells under specified conditions: Inspections may be waived for monitoring wells that will penetrate only aquifers containing degraded waters or will penetrate only formations that normally contain no water. (3) Drilling sites known to have no threats to ground water quality: Initial inspections may be waived when the drilling site is well known to the enforcement agency staff and it is known that no significant threats to ground water quality exist in the area.
(Ord. No. 1836, § 1, 2-12-90)
Ask a question about West Covina law
Corpus searches the West Covina sections it holds and shows the ones that match, with their citations. Free, no sign-in.