§ 16.04.100: Final parcel maps—Requirements and processing.

When a subdivision of not more than four lots is proposed to be created through the tentative parcel map process, a final parcel map shall be filed for record with the county recorder. A. Content of Final Parcel Map. The same improvements required for a subdivision under the tentative and final tract map process are required for a final parcel map. The same information and content as required on a tentative map shall be required for a final parcel map. B. Certification. When dedications or offers of dedications are made on the final parcel map, all parties having any record title interest in the real property being subdivided shall consent to the preparation and recordation of the final parcel map by signing the required certificate. 1. The certificate need not be signed by public entities and public utilities that own rights-of-way, easements or other interests that cannot become a fee provided that: a. The division and development of the property will not unreasonably interfere with the free and complete exercise of the public entity or public utility right-of-way or easement and a statement as such is included as required information; b. The public entity or utility has been given the opportunity to object to such a determination in accordance with the provisions of the Subdivision Map Act. 2. When dedications or offers of dedications are not being made, no owner's or subdivider's signatures shall be required on the final parcel map. C. Method of Approval. One original mylar (4 mil) and three paper prints of the final parcel map, prepared by a licensed survey or registered civil engineer, shall be submitted to the city engineer. 1. The city engineer shall examine the map and determine that the map is technically correct in all aspects not certified to by the county surveyor, and conforms to the approved tentative map and any conditions imposed thereon as follows: a. That all lot sizes shall conform with provisions of this title and of Title 17, and that all lots shall comply with the standards set forth in this chapter; b. That curbs, gutters, sidewalks and paving will be installed along all street frontages of the property being divided; c. That separate and adequate distribution lines for domestic water supply will be constructed to each lot; d. That separate and individual sanitary sewer facilities and connection shall be made to each lot; e. That no lot contained in such proposed subdivision shall conflict with any street, highway, park, playground, public building or other type of public project indicated on a master plan or specific plan; f. That no lot in the proposed subdivision may be subject to flood or inundation; g. That no division will be permitted that will block the development of adjacent property. 2. If the city council is satisfied with the final parcel map, it shall approve the final map and authorize the city clerk to certify it on behalf of the city council. 3. The approved final parcel map shall be transmitted to the county recorder for recordation. A duplicate mylar and three paper prints of the recorded map shall be provided to the city engineer within one week after recordation.

( Prior code §§ 8115.1, 8115.19 ; Ord. 1875 § 1, 1979 ; Ord. 2198 § 2, 1993 )