§ 17.400.105 — Offsite Hazardous Waste Facilities
Code of Ordinances, City of Westminster, California (eCode360 WE5033 publication; scraped 2026-11-22) · Westminster Code of Ordinances § 17.400.105
Corpus is an independent public-information project, not the official City of Westminster website. Stable reference: corpuslaw.us/code/735a59a9-1e16-486b-a533-8f594c6a0f22
§ 17.400.105: Offsite Hazardous Waste Facilities.
A. Purpose and Intent. The purpose of regulating offsite hazardous waste facilities is to ensure such uses do not present any risk to public health, safety, and welfare. B. Applicability of These Regulations. The specific requirements of this Section are applicable to the siting and development of all offsite hazardous waste treatment, storage, transfer, and disposal facilities, as defined in Article 7. C. Procedures. The following procedures are intended to identify the steps for processing a Conditional Use Permit application for a specified off-site hazardous waste facility. These procedures include steps to be taken by the applicant, State and City. 1. Pre-application. At least 90 days before filing an application (Conditional Use Permit) with the community development department for a specified hazardous waste facility project, the applicant shall file with the Office of Permit Assistance (OPA) and the City, a Notice of Intent (NOI) to make an application. The Notice of Intent (NOI) shall contain a complete description of the nature, function, and scope of the project. The Office of Permit Assistance (OPA) shall immediately notify the affected State agencies of the Notice of Intent (NOI). The City shall publish a notice in a newspaper of general circulation in the area affected by the proposed project, shall post notices at the location where the project is proposed, and shall notify, by a direct mailing, the owners of the contiguous property as shown on the latest equalized assessment roll. The City shall impose a fee upon a project applicant equal to the cost of notification required by this Section. Within 90 days after a Notice of Intent (NOI) is filed with the Office of Permit Assistance (OPA), the Office of Permit Assistance (OPA) shall convene a public meeting within the City to inform the public of the nature, function, and scope of the proposed facility project and the procedures that are required for approving applications for the project. The City shall contact Office of Permit Assistance (OPA) regarding the location and time of the meeting and shall have representatives attend. Within 90 days after receiving notification of the filing of a Notice of Intent (NOI), the City council shall appoint a seven-member local assessment committee (LAC) pursuant to the provisions of subsection D, Local Assessment Committee, of this Section. 2. Application submittal. The applicant for an off-site hazardous waste facility project shall submit the required plans, documents, studies, assessments, and other materials pursuant to this subsection and the submittal deadline schedule, on file with the community development department. The City shall notify the Office of Permit Assistance (OPA) within 10 days after an applicant has filed with the City for a Conditional Use Permit for a specified hazardous waste facility project that the application has been accepted as complete by the City. Within 60 days after receiving such notice, the Office of Permit Assistance (OPA) shall convene a meeting of the City and responsible agencies for the project, the applicant, the Local Assessment Committee (LAC) and the interested public, for the purpose of determining the issues which concern the public. The meeting shall take place in the City. Following the meeting as specified in Section 17.510.030.B of this Title, the applicant and the Local Assessment Committee (LAC) of the City shall meet and confer on the specified hazardous waste facility project proposal for the purpose of establishing the terms and conditions under which the project will be acceptable to the community. At the request of the applicant, the Community Development Department shall, within 60 calendar days after the City has determined that an application for a Conditional Use Permit to operate a hazardous waste facility is complete, issue an initial written determination on whether the hazardous waste facility project is consistent with the Westminster Comprehensive General Plan, Land Use Ordinance in effect at the time that the application was received, and the Orange County Hazardous Waste Management Plan (requirement of Section 25199.5(a) of the California Health and Safety Code). The applicant for a specified hazardous waste project shall pay a fee established by the Office of Permit Assistance (OPA) equal to the cost of hiring independent consultants to review the project. The Office of Permit Assistance (OPA) shall deposit these fees in the Local Agency Technical Assistance Account, created within the State General Fund. The monies in that account may be expended by the Office of Permit Assistance (OPA), upon appropriation by the legislature, to make technical assistance grants to the Local Assessment Committee (LAC) to enable the Local Assessment Committee (LAC) in reviewing the project and negotiation terms and connections with the applicant. The City may request technical assistance from any State agency which authorizes permits for hazardous waste facility projects (requirement of Section 25199.7(g) of the California Health and Safety Code). 3. Appeal to City Council. The applicant or any interested party may appeal the final decision of the Planning Commission regarding a specific off-site hazardous waste facility within 15 calendar days of the Commission's decision. The appeal must contain a written explanation of why the decision is being appealed and be addressed to the Secretary of the Planning Commission. 4. Appeal to State . An applicant may file, within 30 calendar days, an appeal of the City Council's final decision regarding a Conditional Use Permit to operate a hazardous waste facility with the Governor or Governor's designee. (Requirement of Section 25199.9 of the California Health and Safety Code.) D. Local Assessment Committee 1. Pursuant to subsection C, Procedures, the City Council shall appoint a 7-member Local Assessment Committee (LAC). The membership of the Local Assessment Committee (LAC) shall be broadly constituted to reflect the make-up of the community and shall include three representatives of the community at large, two representatives of the environmental or public interests groups, and two representatives of affected businesses and industries. Members of the Local Assessment Committee (LAC) shall have no direct financial interest, as defined in Section 87103 of the California Government Code, in the proposed specified hazardous waste facility project. 2. Pursuant to Section 25199.7(d)(2) of the California Health and Safety Code, the Local Assessment Committee (LAC) shall do all of the following: a. Negotiate with the applicant for the proposed hazardous waste facility project on the detailed terms of, and conditions for project approval, which would protect the public health, safety and welfare, and the environment of the City and its surroundings and would promote the fiscal welfare of the City through special benefits and compensation; b. Represent generally, in negotiation with the applicant, the interests of the residents in the City and the interests of adjacent communities; c. Receive and expend the technical assistance grants made available as specified in Section 17.510.030 of this Title; d. Adopt rules and procedures which are necessary to perform its duties as outlined herein; e. Advise the City of the terms, provisions, and conditions for project approval which have been agreed upon by the Local Assessment Committee (LAC) and the applicant and any additional information which the Local Assessment Committee (LAC) deems appropriate. The legislative body of the City may use this advice for their independent consideration of the project; f. Cease to exist after final administrative action has been taken by the State and local agencies on the permit application for which the Local Assessment Committee (LAC) was formed. 3. The approval body shall provide staff resources to assist the Local Assessment Committee (LAC) in performing its duties. 4. If the Local Assessment Committee (LAC) and the applicant cannot resolve any differences through the meetings specified in this Section, the Office of Permit Assistance (OPA) may recommend the use of a mediator. The applicant shall pay one-half of the costs for this mediation and the remaining costs shall be paid, upon appropriation by the legislature, from the State General Fund. E. Application Submittal Requirements. The applicant for a specific hazardous waste facility project must submit a complete application package before the Planning Division of the Community Development Department will accept it for further processing. 1. The following information is required for submittal of a Conditional Use Permit application for an off-site hazardous waste facility: a. A completed Conditional Use Permit application form; b. A completed public hearing notification package; c. An initial environmental assessment form; d. Property owner verification/property owner's permission to construct facility; e. Fees and deposits as required by resolution; f. A comprehensive and accurate site plan drawn to the specifications of the City's site plan standards, which are on file with the Community Development Department, in addition to the following: i. The distance from the project property lines to the nearest residential structures, ii. Proximity of the project to 100-year flood plain area, iii. Proximity of the project to any known earthquake fault zones, iv. Relationship of the project to all above-ground water supplies as well as known underground aquifers that could conceivably suffer contamination, v. Topographic description of the property and surrounding area, vi. Identification of surrounding zoning and land uses; g. Complete building elevations of all sides of all structures, including all exterior details and height dimensions; h. Complete and accurate roof plan of all structures; i. Full floor plan of all buildings, with the interior dimensions of rooms and a description of their use shown; j. A full landscaping and irrigation plan per the City's landscaping standards; k. A complete grading plan of the site; l. Sections of all structures on the site. 2. In addition to the City's initial environmental assessment, the applicant shall describe in detail at least two reasonable alternatives to the project which shall be reviewed pursuant to the California Environmental Quality Act (Public Resources Code Section 15060(d)). The applicant shall also submit for review, concurrently with the application package, the following documents: a. A Health and Safety Assessment, which shall evaluate, at a minimum, the area within 2,000 feet of the exterior boundaries of the site which is designated a sensitive area, and shall evaluate all potential health and safety impacts on sensitive populations. Sensitive populations shall include, but not be limited to, residential populations, employment populations, and immobile populations such as schools, hospitals, convalescent homes, jails, and other similar facilities within the area of potential impact. The assessment must take into consideration the quantities and the physical and chemical characteristics of the specific types of waste that would be handled, the facility design features, and planned operation practices. The assessment must analyze in detail all probabilities of accidents or spills at the site as well as transportation-related accidents from the point of origin to the facility. Such analysis shall identify and explain, in detail, mitigation measures to reduce identified risks. b. A Traffic Impact Assessment which identifies the existing conditions on the circulation system within the sensitive area of the proposed hazardous waste facility. The assessment shall identify the potential impacts the facility may have upon the existing network of roads, and the ability of local safety personnel to respond to any potential accident, and the ability to evacuate adjacent businesses, schools, hospitals, and residences. c. Geological/Seismic/Hydrological Assessment that assesses the geological, seismic, and hydrological structure and conditions of the sensitive area. All earthquake faults within the sensitive area must be identified. The assessment must include maps and text explaining the composition and suitability of the underlying soil profile and strata, including the effects the project will impose upon these areas and the underlying water table. d. A Noise/Visual Assessment that indicates the potential noise and visual impacts the proposed facility will place upon the sensitive area and the community as a whole. The assessment must include a noise contour map of the ambient noise levels within the sensitive area. e. An Air Quality Impact Assessment that describes in detail the existing air quality of the sensitive area and the changes that will occur as a result of the project being built. Potential mitigation measures must be discussed in detail. f. A Materials Processing Assessment which identifies the amounts (tonnage) and types of hazardous wastes to be treated at the proposed facility, the source of these wastes, the ultimate disposition of the wastes, and the anticipated life of the facility. Information shall be provided on the amount, sources, and types of hazardous waste to be treated based on an actual survey of the industries to be served and, thereby, be representative of the wastes that will be processed at the facility. g. A preliminary Facility Monitoring Plan that identifies an ongoing monitoring program to ensure no unintentional release of any hazardous substance from the site. The plan must address by type and quantity, the movement, on-site and off-site, of all waste at the site along with the processing that it is subject to. This shall include any ongoing monitoring required by other permitting agencies such as the State Department of Health Services, the South Coast Air Quality Management District, the Environmental Protection Agency, the Midway City Sanitary District, etc. h. A Preliminary Contingency Plan for emergency procedures designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste constituents to air, soil, or surface water. The plan shall provide for its immediate implementation whenever there is fire, explosion, or release of hazardous waste constituents which could threaten human health or the environment. The preliminary contingency plan shall address the requirements included in subsection O, Minimum Development Requirements. i. A Fiscal Impact Study which clearly demonstrates in a detailed fashion the financial impacts that the project will place upon the City. F. Public Hearing. The proposed off-site hazardous waste facility shall require a public hearing before the Westminster planning commission and is therefore subject to the notification and processing requirements for other Conditional Use Permits. Because of the needs and requirements of the sensitive area, as defined in this ordinance, a minimum radius of 500 feet, measured from the exterior boundaries of the proposed off-site facility, shall be used for the purpose of notification of the public hearing. G. Siting Restriction on Off-site Hazardous Waste Facilities. All off-site hazardous waste facilities shall comply with the siting criteria set forth in the Orange County Hazardous Waste Management Plan. These criteria have been established for use by hazardous waste facility applicants in locating and designing suitable facility sites and projects. The purpose of the criteria is to reduce public health and environmental risks and governmental costs associated with development of a potential facility. The siting criteria can be found in the Orange County Hazardous Waste Management Plan, copies of which are on file with the City's Community Development Department. H. Findings Required for Approving Hazardous Waste Facilities. At a minimum, the following findings shall be made in writing by the Commission prior to granting a Conditional Use Permit for a hazardous waste facility project: 1. The project is consistent with the City's General Plan and all applicable ordinances of the City; 2. The project will not be detrimental to the health, safety, or general welfare of the community as determined in the required health and safety assessment and other documents describing the potential impacts of the proposed project; 3. The project site is or will be adequately served by streets, highways, infrastructure, and other public or private service facilities; 4. The project complies with the siting criteria outlined in the Orange County Hazardous Waste Management Plan; 5. The project contains a contingency plan that adequately provides for evacuation or other responses necessary as a consequence of an accident at the proposed site; 6. The City's emergency police and fire response personnel and equipment can respond and treat, contain, or mitigate the possible hazards associated with an accident on the proposed project site; 7. The project is in conformance with all Federal, State, and County fire standards, as well as the requirements of the Uniform Fire Code. I. Standards for the Physical Development of Such Uses. The City may impose conditions on the granting of a Conditional Use Permit for a hazardous waste facility in order to achieve the purpose of this Title and the General Plan and to protect the health, safety, and general welfare of the community. In addition to the standard planning conditions and any special conditions required by the City, the following minimum conditions shall be placed upon an applicant: 1. To ensure the safety and security of the community and the operation of the facility, the owner shall: a. Prevent the unknowing entry, and minimize the possibility of the unauthorized entry, of persons onto any portion of the facility. b. Provide a 24-hour surveillance system (e.g., television monitoring or surveillance by guards or facility personnel) that continuously monitors and controls entry onto the facility. c. Construct an artificial or natural barrier (e.g., a wall or a wall combined with a landscape berm) that completely surrounds the facility. d. Provide all gates or other entrances into the facility with adequate means to control entry at all times. Signs stating, "Danger—Hazardous Waste Area—Unauthorized Personnel Keep Out," shall be posted at each entrance to the facility and at other locations in sufficient numbers to be seen from any approach. The sign shall be written in English, Spanish, and Vietnamese, and shall be legible from a distance of at least 25 feet. J. Hazardous Materials Disclosure. All off-site hazardous waste facilities shall comply with the hazardous materials disclosure criteria set forth in Chapter 8.31 of the WMC. K. Contingency Plan Required 1. The hazardous waste facility shall be required to have a contingency plan designed to minimize hazards to human health and the environment from fires, explosions, or unplanned release of hazardous waste to the air, soil, or surface water. The plan shall be carried out immediately whenever a fire, explosion, or unplanned release occurs. The contingency plan shall include: a. The actions employees must take in response to a fire, explosion, or unplanned release of hazardous waste; b. Arrangements agreed to by local emergency-response officials; c. The names, addresses, and telephone numbers (office and home) of all persons qualified to act as emergency coordinator. (If more than one name is listed, the order in which they may assume authority shall be given, with one person designated as primary coordinator.) The emergency coordinator shall be available to respond to an emergency and shall have the responsibility for coordinating all emergency response measures. The emergency coordinator shall be familiar with all aspects of the contingency plan, all operations and activities of the facility, the location and characteristics of waste handled, and general facility layout. The emergency coordinator shall have the authority to commit the resources needed to carry out the contingency plan; d. A listing of all emergency equipment at the facility, including its location and an outline of its capabilities; e. An evacuation plan for employees where evacuation may be necessary, including signals used to begin evacuation, primary evacuation routes, and alternate routes. 2. Facility emergency coordinator responsibilities shall be identified in the contingency plan to include, at minimum, the following: a. In event of an emergency (imminent or natural) fire, the emergency coordinator shall immediately activate facility alarms to notify employees and shall contact appropriate State or local emergency response agencies; b. In the event of a fire, explosion, or release of any hazardous material, the emergency coordinator shall immediately identify the character, exact source, amount, and real extent of any released materials. Concurrently, the emergency coordinator shall assess possible hazards, both direct and indirect, to human health or the environment that may result from the emergency; c. If the emergency coordinator determines that the facility has had a release, fire, or explosion that could threaten human health and the environment outside the facility, the emergency coordinator shall report his or her findings as outlined in subsections K.2.d and e; d. If evacuation is necessary, local officials shall be so notified; e. The emergency coordinator shall, in every situation, notify the State Office of Emergency Services at 1-800-852-7550, providing the following information: i. Name and telephone number of person reporting, ii. Name and address of facility, iii. Time and type of incident, iv. Name and quantity of material(s) involved, v. Extent of injuries, vi. Possible hazard to human health and the environment outside facility; f. During the emergency, the emergency coordinator shall take all reasonable measures to ensure that fires, explosions, and releases do not occur or spread, including such measures as: i. Stopping operations, ii. Collecting and containing release water, iii. Removing and isolating containers; g. If the facility stops operations during an emergency, the emergency coordinator shall monitor for leaks, pressure build-ups, and gas generation or ruptures in valves, pipes, or other equipment as appropriate; h. Immediately after an emergency, the emergency coordinator shall provide for treating, storing, or disposing of recovered waste, contaminated soil or surface water, or any other material resulting from a release, fire, or explosion; i. Other activities required of the emergency coordinator after an emergency are: i. Ensure that no waste incompatible with the released material is handled until cleanup is completed, ii. Ensure that emergency equipment is cleaned and ready for use before operations are resumed; j. Owner/operator responsibilities shall be identified in the contingency plan to include, at minimum, the following: i. Notify the State Department of Health Services and appropriate State and local authorities that the above requirements have been met before operations are resumed in the affected area, ii. Record the time, date, and details of any incident that requires implementing the contingency plan; k. Within 15 days, submit a written report of the incident to the State Department of Health Services. The report shall include: i. Name, address, and telephone number of the owner/operator, ii. Name, address, and telephone number of the facility, iii. Date, time, and type of incident, iv. Name and quantity of materials involved, v. Extent of any injuries, vi. Assessment of actual or potential hazards to human health or the environment, where applicable, vii. An estimate of the quantity of materials recovered and its disposition. 3. A copy of the contingency plan shall be maintained at the facility. A copy shall be sent to the City's Public Safety and Planning divisions, Orange County Fire Department, surrounding hospitals, Orange County Health Care Agency, the Westminster Fire Prevention Bureau, and other regulatory agencies as deemed appropriate. 4. The contingency plan shall be reviewed and amended when any of the following occur: a. The facility permit is revised; b. Applicable regulations are revised; c. The plan fails in an emergency; d. Operations at the facility change in a way that materially increases the potential of fire, explosion, or unplanned release of hazardous waste; e. The list of emergency coordinators changes; f. The list of emergency equipment changes. L. Monitoring of Facility Operations Authorized 1. Upon reasonable notice, the City, its designated representatives, and representatives of other affected regulatory agencies may enter a parcel for which a Conditional Use Permit for a hazardous waste facility has been granted, in order to monitor the operation of the facility. 2. The holder of a Conditional Use Permit for a hazardous waste facility shall report quarterly to the City the amount, type, and disposition of all wastes processed by the facility. Included in the report shall be copies of all manifests showing the delivery and types of hazardous waste materials. The report shall also include a map showing the exact location (coordinates and elevation) by quantity and types of material placed in repositories or otherwise stored or disposed on-site. 3. All structures shall remain accessible for inspection purposes. M. Closure Plan Required. The owner or operator of a hazardous waste management facility shall submit a written closure plan. A copy of the approved plan and all revisions to the plan shall be kept at the facility until closure is completed. The plan shall identify steps necessary to completely or partially close the facility at any point during its intended operating life and to completely close the facility at the end of this intended operating life. The closure plan shall include at a minimum: 1. A description of how and when the facility will be partially closed, if applicable, and finally closed. The description shall identify the maximum extent of the operation that will be open during the life of the facility; 2. An estimate of the maximum inventory of wastes in storage and treatment at any time during the life of the facility; 3. A description of the steps needed to decontaminate facility equipment during the closure; 4. An estimate of the expected year of closure and a schedule for final closure. The schedule shall include, at a minimum, the initial time required to close the facility and the time required for intervening closure activities that will allow tracking of the progress of closure. The owner or operator may amend the closure plan at any time during the active life of the facility (that period during which wastes are periodically received). The owner or operator shall amend the plan whenever changes in operating plans or facility design affect the closure plan, or whenever there is a change in the expected year of closure. When the owner or operator requests a permit modification to authorize a change in operating plans or facility design, a modification of the closure plan shall be requested at the same time; 5. The plan shall clearly indicate an effective and ongoing use for the facility after closure. The plan shall identify how the subject property will be used after the anticipated life of the project; the nature and type of reclamation; provisions for maintenance of the project; and finally, the requirements for long-term monitoring of the reclaimed area to ensure no hazardous materials are leaking from the site; 6. The plan shall indicate financial arrangements (irrevocable trust or other form of security arrangement) for the purpose of providing funds for the closure of its site and its long-term postclosure monitoring maintenance per Section 17.400.090, Mobile Home Park Conversions. N. Proof of Liability Insurance Required. To ensure financial responsibility, the owner/operator shall show proof of liability insurance as follows: 1. The types, amounts, periods of coverage, and provisions for periodic review as to adequacy of coverage shall be specified in the conditions of approval. Required insurance shall include, but not be limited to, general liability insurance, automotive liability insurance, environmental impairment liability insurance, and architect's and engineer's professional liability insurance. All such insurance shall name the City as an additional insured and shall be maintained for the life of the site and such additional periods as shall be specified in the conditions of approval. 2. Additionally, coverage shall be provided for workers' compensation insurance and such other insurance as may be required. Said insurance shall name the City as either an additional insured or as an additional loss payee. Certificates of Insurance shall be submitted to the City annually. 3. An irrevocable trust shall be established to provide funds for closure of the site and its long-term postclosure monitoring and maintenance. Funds for this trust shall be provided by the owner/operator of the facility quarterly, based on quantity and types of hazardous waste received and processed or percentage of gross income. The terms of the trust shall be agreed upon by the project owner/operator and the City. The terms shall be reviewed annually in regard to the amount of funds in the trust and anticipated closure monitoring and maintenance costs. The applicant shall provide a bond in the amount to be determined by the City for purposes of closure of the site. 4. The owner/operator shall defend, indemnify, and hold harmless the City, its officers, agents, servants, and employees from all claims, actions, or liabilities arising out of the issuance of this permit, operations at the facility, and transportation of wastes to and from the facility. O. Minimum Development Requirements 1. The City may impose conditions on the granting of a Conditional Use Permit for a hazardous waste facility in order to achieve the purpose of this Section and the General Plan and to protect the health, safety, and general welfare of the community. In addition to the standard planning conditions and any special conditions required by the City, the following minimum conditions shall be placed upon an applicant: a. To ensure the safety and security of the community and the operation of the facility, the owner shall: i. Prevent the unknowing entry, and minimize the possibility of the unauthorized entry, of persons onto any portion of the facility; ii. Provide a 24-hour surveillance system (e.g., television monitoring or surveillance by guards or facility personnel) which continuously monitors and controls entry onto the facility; iii. Construct an artificial or natural barrier (e.g., a wall or a wall combined with a landscape berm) which completely surrounds the facility; iv. All gates or other entrances into the facility shall be provided with adequate means to control entry at all times. Signs with the legend, "Danger—Hazardous Waste Area— Unauthorized Personnel Keep Out," shall be posted at each entrance to the facility and at other locations in sufficient numbers to be seen from any approach. The legend shall be written in English, Spanish, and Vietnamese, and shall be legible from a distance of at least 25 feet. b. The hazardous waste facility is required to have a contingency plan designed to minimize hazards to human health and the environment from fires, explosions, or unplanned release of hazardous waste to the air, soil, or surface water. The plan shall be carried out immediately whenever a fire, explosion, or unplanned release occurs. The contingency plan shall include: i. The actions employees must take in response to a fire, explosion, or unplanned release of hazardous waste; ii. Arrangements agreed to by local emergency response officials; iii. The names, addresses, and telephone numbers (office and home) of all persons qualified to act as emergency coordinator. (If more than one name is listed, the order in which they may assume authority shall be given, with one person designated as primary coordinator.) The emergency coordinator shall be available to respond to an emergency and shall have the responsibility for coordinating all emergency response measures. The emergency coordinator shall be familiar with all aspects of the contingency plan, all operations and activities of the facility, the location and characteristics of waste handled, and general facility layout. The emergency coordinator shall have the authority to commit the resources needed to carry out the contingency plan; iv. A listing of all emergency equipment at the facility, including its location and an outline of its capabilities; v. An evacuation plan for employees where evacuation may be necessary, including signals used to begin evacuation, primary evacuation routes, and alternate routes. c. Facility emergency coordinator responsibilities shall be identified in the contingency plan to include, at minimum, the following: i. In event of emergency (imminent or natural) fire, the emergency coordinator shall immediately activate facility alarms to notify employees and shall contact appropriate State or local emergency response agencies. ii. In the event of a fire, explosion, or release of any hazardous material, the emergency coordinator shall immediately identify the character, exact source, amount, and real extent of any released materials. Concurrently, the emergency coordinator shall assess possible hazards, both direct and indirect, to human health or the environment that may result from the emergency. iii. If the emergency coordinator determines that the facility has had a release, fire, or explosion which could threaten human health and the environment outside the facility, the emergency coordinator shall report his or her findings as per the following subsections d and e. iv. If evacuation is necessary, local officials shall be so notified. v. The emergency coordinator shall, in every situation, notify the State Office of Emergency Services, telephone number 1-800-852-7550, providing the following information: (A) Name and telephone number of person reporting; (B) Name and address of facility; (C) Time and type of incident; (D) Name and quantity of material(s) involved; (E) Extent of injuries; and (F) Possible hazard to human health and the environment outside facility. vi. During the emergency, the emergency coordinator shall take all reasonable measures to ensure that fires, explosions, and releases do not occur or spread, including such measures as: (A) Stopping operations; (B) Collecting and containing release water; and (C) Removing and isolating containers. vii. If the facility stops operations during an emergency, the emergency coordinator shall monitor for leaks, pressure build-ups, and gas generation or ruptures in valves, pipes, or other equipment as appropriate. viii. Immediately after an emergency, the emergency coordinator shall provide for treating, storing, or disposing of recovered waste, contaminated soil or surface water, or any other material resulting from a release, fire, or explosion. ix. Other activities required of the emergency coordinator after an emergency are: (A) Ensure that no waste incompatible with the released material is handled until cleanup is completed; and (B) Ensure that emergency equipment is cleaned and ready for use before operations are resumed. d. Owner/operator responsibilities shall be identified in the contingency plan to include, at minimum, the following: i. Notify the State Department of Health Services and appropriate State and local authorities that the above requirements have been met before operations are resumed in the affected area; ii. Record the time, date, and details of any incident which requires implementing the contingency plan; iii. Within 15 days, submit a written report of the incident to the State Department of Health Services. The report shall include: (A) Name, address, and telephone number of the owner/operator, (B) Name, address, and telephone number of the facility, (C) Date, time, and type of incident, (D) Name and quantity of materials involved, (E) Extent of any injuries, (F) Assessment of actual or potential hazards to human health or the environment, where applicable, and (G) An estimate of the quantity of materials recovered and its disposition; iv. A copy of the contingency plan shall be maintained at the facility. A copy shall be sent to Public Safety, Orange County Fire Department, surrounding hospitals, Orange County Health Care Agency, the Westminster Fire Prevention Bureau, the Westminster Planning Division, and other regulatory agencies as deemed appropriate; v. The contingency plan shall be reviewed and amended when any of the following occur: (A) The facility permit is revised, (B) Applicable regulations are revised, (C) The plan fails in an emergency, (D) Operations at the facility change in a way that materially increases the potential of fire, explosion, or unplanned release of hazardous waste, (E) The list of emergency coordinators changes, and (F) The list of emergency equipment changes. e. Monitoring. i. Upon reasonable notice, the City, its designated representatives, and representatives of other affected regulatory agencies may enter a parcel for which a Conditional Use Permit for a hazardous waste facility has been granted in order to monitor the operation of the facility. ii. The holder of a Conditional Use Permit for a hazardous waste facility shall report quarterly to the City the amount, type, and disposition of all wastes processed by the facility. Included in the report shall be copies of all manifests showing the delivery and types of hazardous waste materials. The report shall also include a map showing the exact location (coordinates and elevation) by quantity and types of material placed in repositories or otherwise stored or disposed on-site. iii. All structures shall remain accessible for inspection purposes. f. The owner or operator of a hazardous waste management facility shall submit a written closure plan. A copy of the approved plan and all revisions to the plan shall be kept at the facility until closure is completed. The plan shall identify steps necessary to completely or partially close the facility at any point during its intended operating life and to completely close the facility at the end of this intended operating life. The closure plan shall include at a minimum: i. A description of how and when the facility will be partially closed, if applicable, and finally closed. The description shall identify the maximum extent of the operation which will be open during the life of the facility; ii. An estimate of the maximum inventory of wastes in storage and treatment at any time during the life of the facility; iii. A description of the steps needed to decontaminate facility equipment during the closure; iv. An estimate of the expected year of closure and a schedule for final closure. The schedule shall include, at a minimum, the initial time required to close the facility and the time required for intervening closure activities which will allow tracking of the progress of closure. The owner or operator may amend the closure plan at any time during the active life of the facility. (The active life of the facility is that period during which wastes are periodically received.) The owner or operator shall amend the plan whenever changes in operating plans or facility design affect the closure plan, or whenever there is a change in the expected year of closure. When the owner or operator requests a permit modification to authorize a change in operating plans or facility design, a modification of the closure plan shall be requested at the same time; v. The plan shall clearly indicate an effective and ongoing use for the facility after closure. The plan shall identify how the subject property will be used after the anticipated life of the project; the nature and type of reclamation; provisions for maintenance of the project; and finally, the requirements for long-term monitoring of the reclaimed area to ensure no hazardous materials are leaking from the site; vi. The plan shall indicate financial arrangements (irrevocable trust or other form of security arrangement) for the purpose of providing funds for the closure of its site and its long-term post-closure monitoring maintenance per subsection g. g. To ensure financial responsibility, the owner/operator shall show proof of liability insurance as follows: i. The types, amounts, periods of coverage, and provisions for periodic review as to adequacy of coverage shall be specified in the conditions of approval. Required insurance shall include, but not be limited to, general liability insurance, automotive liability insurance environmental impairment liability insurance, and architect's and engineer's professional liability insurance. All such insurance shall name the City as an additional insured and shall be maintained for the life of the site and such additional periods as shall be specified in the conditions of approval; ii. Additionally, coverage shall be provided for workers' compensation insurance and such other insurance as may be required. Said insurance shall name the City as either additional insured or as an additional loss payee. Certificates of Insurance shall be submitted to the City annually; iii. An irrevocable trust shall be established to provide funds for closure of the site and its long-term post-closure and monitoring and maintenance. Funds for this trust shall be provided by the owner/operator of the facility quarterly based on quantity and types of hazardous waste received and processed or percentage of gross income. The terms of the trust shall be agreed upon by the project owner/operator and the City. The terms shall be reviewed annually in regard to the amount of funds in the trust and anticipated closure monitoring and maintenance costs. Applicant shall provide a bond in the amount to be determined by the City for purposes of closure of the site; iv. The owner/operator shall defend, indemnify, and hold harmless the City, its officers, agents, servants, and employees from all claims, actions, or liabilities arising out of the issuance of this permit, operations at the facility, and transportation of wastes to and from the facility. P. Use of Permit 1. A Conditional Use Permit for a hazardous waste facility shall be granted for those substances and quantities identified in the conditions of approval. No additional types of waste or increases in the quantity of approved wastes shall be allowed beyond those specified in the approval permit unless a separate application is made therefore which shall satisfy the same procedures and contents as those required in an initial application. 2. Any use authorized under the provisions of this Chapter must be exercised within one year of the final authorization of this use or such conditional use shall become null and void. Any use approved pursuant to this Chapter which has been discontinued for a period of 1 year or more shall become null and void. All use permits for off-site hazardous waste facilities shall expire 5 years from the time of the last approval of said permit. An applicant may request an extension of time to develop the facility site beyond the 1-year limit. Such extensions shall be made to the Planning Commission on forms provided by the Community Development Department and shall be filed with the director, accompanied by the appropriate fee. Within 60 days after the filing of a request for an extension, the director shall set the matter as an advertised public hearing on the regular agenda of the Planning Commission. An extension of time may be granted by the Planning Commission upon a determination that valid reasons exist for permittee not using the permit within the required period of time. The term "use" shall mean the beginning of substantial construction of the use that is authorized, which construction must thereafter be pursued diligently to completion. Q. Time Limits to Effectuate and Maintain Permit 1. Any use authorized under the provisions of this Chapter must be exercised within one year of the final authorization of this use or such conditional use shall become null and void. 2. Any use approved pursuant to this Chapter that has been discontinued for a period of one year or more shall become null and void. 3. All use permits for off-site hazardous waste facilities shall expire 5 years from the time of the last approval of said permit. An applicant may request an extension of time to develop the facility site beyond the 1-year limit. Such extensions shall be made to the Commission on forms provided by the Division and shall be filed with the Director, accompanied by the appropriate fee. Within 60 days after the filing of a request for an extension, the Director shall set the matter as an advertised public hearing on the regular agenda of the Commission. An extension of time may be granted by the Commission upon a determination that valid reasons exist for the permittee not using the permit within the required period of time. The term "use" shall mean the beginning of substantial construction of the use that is authorized, which must thereafter be pursued diligently to completion.
( Ord. 2456 § 2, 2010 )
Ask a question about Westminster law
Corpus searches the Westminster sections it holds and shows the ones that match, with their citations. Free, no sign-in.
