For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3.58.050 — Establishment of Traffic Impact Fees

Code of Ordinances, City of Westminster, California (eCode360 WE5033 publication; scraped 2026-11-22) · Westminster Code of Ordinances § 3.58.050

Corpus is an independent public-information project, not the official City of Westminster website. Stable reference: corpuslaw.us/code/5dc07b8d-5535-4b58-994d-f8b9a1852c70

§ 3.58.050: Establishment of Traffic Impact Fees.

A. The Traffic Impact Fee is based upon the unfunded portion of the construction cost of the total Circulation System Improvements necessary to implement the Traffic Circulation System Improvement Plan, and the total number of vehicle trips anticipated as a result of future growth. B. The Traffic Impact Fee shall be calculated, in accordance with the following procedure and as established by the Traffic Impact Fee Resolution adopted by city council in conjunction with this ordinance. 1. The city council shall determine by resolution net roadway cost as follows: a. The city council shall determine which roadway and related improvements are necessary to implement the Traffic Circulation System Improvement Plan. b. The city council shall determine, for each specific improvement, an estimate of the total costs necessary to complete each improvement. c. The city council shall determine, with respect to roadway improvements, an estimate of the current and anticipated funding available to satisfy the costs of construction. In determining the amount of funding available for roadway improvements the council shall include funding from other governmental entities, City revenues earmarked for roadway construction purposes, and the extent to which committed projects are required to construct or fund the specific roadway improvement. d. The city council shall determine for roadway improvements, the difference, if any, between the estimated costs of construction and the estimated funding available to complete the improvement. e. The extent to which the cost of construction for all roadway improvements exceed the funds available, or anticipated for construction the improvement, shall be the "net roadway cost". 2. The city council shall determine the total anticipated average daily trips resulting from future growth in the following manner: a. The total remaining development in each land use category as established in the Traffic Circulation System Improvement Plan shall be multiplied by the trip generation rate established by the Institute of Transportation Engineers. b. All of the additional daily trips of each land use category shall be added to determine the total average daily trips that the city's circulation system must accommodate in the future. c. The city council shall determine the average cost per trip by dividing the net roadway cost by the total traffic volume generated by future growth. d. The Traffic Impact Fee required of any project shall be calculated in the manner specified in the Traffic Circulation System Improvement Plan. If a proposed development is comprised of a land use for which a specified fee level has been set in the Traffic Impact Fee Resolution adopted by the city council, the appropriate fee should be calculated based upon the land use quantity proposed. If a proposed development is comprised of a land use for which a specific fee level has not been set, the appropriate fees should be calculated based upon the projected daily trip generation as approved by the city engineer, at a rate per trip as specified in the Traffic Impact Fee Resolution adopted by the city council. C. Biannually, or as deemed necessary, the city council in conjunction with the city's budget sessions, shall review the Trend Growth Assumptions, Trip Generation Rates, and Roadway Cost Estimates, and if necessary, shall amend the Traffic Impact Fee Resolution establishing the Traffic Impact Fees to ensure that it is a fair and equitable method for the distribution of costs of circulation system improvements necessary to accommodate traffic volumes generated by future growth. D. In the event no substantive changes to any of the provisions of this ordinance or the Traffic Impact Fee Resolution occur during the time between the mandatory biannual city council reviews as set forth herein, the dollar amounts set forth in the Traffic Impact Fees Resolution and the Traffic Circulation System Improvement Plan thereof, shall be increased by the city engineer using the most appropriate price index available. This increase shall be calculated and become effective on July 1 of any year that the city council does not otherwise review the contents or provisions of this ordinance and the Traffic Impact Fee Resolution.

( Ord. 2203 § 2, 1993 )

Ask a question about Westminster law

Corpus searches the Westminster sections it holds and shows the ones that match, with their citations. Free, no sign-in.