For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.30.040 — Control of urban runoff

Code of Ordinances, City of Westminster, California (eCode360 WE5033 publication; scraped 2026-11-22) · Westminster Code of Ordinances § 8.30.040

Corpus is an independent public-information project, not the official City of Westminster website. Stable reference: corpuslaw.us/code/814082d4-85ff-4053-95ef-ed9fa386905b

§ 8.30.040: Control of urban runoff.

A. New Development and Significant Redevelopment. 1. All new development and significant redevelopment within the city of Westminster shall: a. Require a water quality management plan which shall be prepared in accordance with the DAMP; and b. Meet any conditions and requirements established by the engineering division which are reasonably related to the reduction or elimination of pollutants in storm water runoff from the project site. 2. Prior to the issuance by the city of a discretionary land use permit or grading permit or building and safety permit for any new development or significant redevelopment, the property owner shall submit to and obtain the approval by the engineering division of a water quality management plan. 3. Notwithstanding subsections (A)(1) and (A)(2) of this section, a water quality management plan shall not be required for construction of one single-family detached residence, unless the city engineering division determines that the construction may result in the discharge of significant levels of a pollutant into a tributary to the storm water drainage system. 4. Compliance with the conditions and requirements of a water quality management plan shall not exempt any person from the requirement to independently comply with each provision of this chapter. 5. If the city determines that the project will have a de minimis impact on the quality of storm water runoff, then it may issue a written waiver of the requirement for preparation and approval of a water quality management plan. 6. Each water quality management plan shall name a responsible party for the project. 7. The owner(s) of a new development or significant redevelopment project, their successors and assigns, and each named responsible party, shall implement and adhere to the terms, conditions and requirements of the approved water quality management plan. a. Each failure by the owner(s) of the property, their successors or assigns, or a named responsible party, to implement and adhere to the terms, conditions and requirements of an approved water quality management plan shall constitute a violation of this chapter. 8. The city may require that the water quality management plan be recorded with the county recorder's office by the property owner(s). The signature of any owner of the property, any successive owner or the named responsible party shall be sufficient for the recording of the plan or any revised plan and a signature on behalf of the city shall not be required for recordation. B. Cost Recovery. The costs and expenses of the city incurred in the review, approval, or revision of any water quality management plan or storm water pollution prevention plan, and inspection, cleanup or other administration costs incurred in connection with the control of runoff shall be assessed to the property owner(s) or responsible party and shall be due and payable to the city. The city may elect to require a deposit of estimated costs and expenses, and the actual costs and expenses shall be deducted from the deposit, and the balance, if any, refunded to the property owner(s) or responsible party. C. Permittees shall meet the requirements of the NPDES permit and the DAMP.

( Ord. 2014 § 1, 1985 ; Ord. 2231 § 1, 1994 ; Ord. 2366 § 1, 2003 )

Ask a question about Westminster law

Corpus searches the Westminster sections it holds and shows the ones that match, with their citations. Free, no sign-in.