For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 102-203.2 — Sewer system development charges—Nonresidential facilities outside city

Code of Ordinances of the City of Arvada, Colorado (Supp. No. 67: codified through Ordinance No. 4932, enacted May 5, 2026) · Arvada Code of Ordinances § 102-203.2

Corpus is an independent public-information project, not the official City of Arvada website. Stable reference: corpuslaw.us/code/1f2cd531-9c3e-4c35-a2d0-4782476ea06b

Sec. 102-203.2. - Sewer system development charges—Nonresidential facilities outside city.

Sewer fees serving nonresidential facilities outside the corporate limits of the city, subject to section 102-51, are as follows: (1) An inspection fee of $37.50. (2) Sewer system development charges determined from the following schedule: Non-residential Sewer Service Tap Size | Number of Single-Family Residential Equivalents | Sewer System Development Charges ⅝" x ¾" | 2.00 | $24,960.00 ¾" | 2.00 | $24,960.00 1" | 4.80 | $59,910.00 1 ½" | 11.00 | $137,280.00 2" | 20.00 | $249,600.00 3" | 43.00 | $536,640.00 4" | 86.00 | $1,073,280.00 6" | A Metro Water Recovery formula will determine the City sewer system development charge for a 6" meter. | A Metro Water Recovery formula will determine the City sewer system development charge for a 6" meter. (3) Plus, the Metro Water Recovery (formerly known as Metro Wastewater Reclamation District) connector charge. The city acts as agent for Metro Water Recovery in collection of a connector charge in accordance with the fee schedule established by Metro Water Recovery. (4) The sewer tap size required will be determined in accordance with the Uniform Plumbing Code (UPC), as amended and adopted by the city.

(Ord. No. 4854, § 17, 9-11-2023)

Ask a question about Arvada law

Corpus searches the Arvada sections it holds and shows the ones that match, with their citations. Free, no sign-in.