Sec. 50-57. - Site disturbance permittee—Inspection responsibilities.

(a) Generally. The permittee shall perform any action or inspection as requested by and in accordance with direction from the director. The permittee shall also allow representatives of the city to enter the permitted site as necessary to make regular inspections to ensure the validity of the reports filed pursuant to this article and the permittee's compliance with the permit's conditions and requirements. The director has the right of entry pursuant to section 50-39. (b) Before construction. Following the issuance of a site disturbance permit but before any land disturbance activity begins, the applicant shall install all initial BMP and schedule an initial inspection with the public works department. The purpose of the inspection is to ensure all BMP are adequate, installed correctly, and functioning properly. (c) During construction. The permittee must inspect all erosion and sediment control measures on the site on a regular basis but no less than every 14 days. The permittee must also inspect all erosion and sediment control measures on the site within 24 hours after the end of any precipitation, windstorm, or snowmelt event that causes surface erosion. (1) Inspections shall include observations of the construction site perimeter, all disturbed areas, materials storage areas that are exposed to precipitation, discharge locations, and locations where vehicles access the site for evidence of, or potential for, pollutants entering the stormwater drainage system. The inspection shall also confirm that the site is in compliance with the BMP identified in the site disturbance permit, the erosion and sediment control plans, and/or SWMP shall be evaluated to ensure that they are operating correctly. (2) All inspections shall be documented in written form and maintained with the onsite SWMP. The documented permittee inspections must contain, at a minimum, the name of the inspector, the date of the inspection, any concerns noted during the inspection, the date that each concern was addressed, and any revisions to the site disturbance permit as a result of the inspection. A copy of the inspection must be made available to the director upon request. (3) Should revisions to the control measures be implemented as a result of deficiencies noted during site inspections, those revisions must be approved by the director and recorded within three business days on the approved supporting documentation for the site disturbance permit. (d) Final inspections. The permittee, in coordination with the city, must conduct all final inspections for all erosion and sediment control measures on the site and document the findings of such inspections in accordance with requirements established by the director.

(Ord. No. 4875, § 1, 8-19-2024)