For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-5-5 — Permit Contents

Boulder Revised Code 1981 (Supplement167; ordinances effective through July30,2026; five publisher-pending ordinances held); partial · Boulder Revised Code 1981 § 8-5-5

Corpus is an independent public-information project, not the official City of Boulder website. Stable reference: corpuslaw.us/code/ad2b7cde-f737-4c85-ba9b-a301792a668d

8-5-5. - Permit Contents.

A permit issued under this section should state the right-of-way permit number, the date of issue and expiration; the name and address of the permittee, the name and address of the developer, contractor, or subcontractor licensed to perform work under the permit; the location, nature, and purpose of the proposed work permitted; any conditions of approval, including, without limitation, inspection, testing, certification, and provision of as-built drawings; the type of existing public infrastructure including, without limitation, street pavement, curb and gutter, sidewalks, trees and landscaping, or utilities impacted by the permit; references to the approved engineering construction drawings or site plans; references to any supplemental permits including, without limitation, wetland, floodplain development, state highway access or utility, revocable right-of-way, erosion control and water and sewer utility permits required; and the amount of fees and deposits paid, and bonds filed by the permittee. Ordinance No. 8323 (2019)

Ask a question about Boulder law

Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.