§ 9-12-8 — Final Plat
Boulder Revised Code 1981 (Supplement167; ordinances effective through July30,2026; five publisher-pending ordinances held); partial · Boulder Revised Code 1981 § 9-12-8
Corpus is an independent public-information project, not the official City of Boulder website. Stable reference: corpuslaw.us/code/3fc828a5-2a94-4fec-8fe3-a574bf0286ec
9-12-8. - Final Plat.
(a) A final plat may be submitted at the same time as a preliminary plat. (b) In order to obtain city manager review of a final plat, the subdivider shall submit a final plat that conforms to the approved preliminary plat, includes all changes required by the manager or the planning board, and includes the following information: (1) A map of the plat drawn at a scale of no less than one inch equals one hundred feet (and of a scale sufficient to be clearly legible) with permanent lines in ink and whose outer dimensions are twenty-four inches by thirty-six inches on a reproducible Mylar or paper sheet (maps of two or more sheets shall be referenced to an index placed on the first sheet) or in electronic format saved as a PDF document using no less than 300 dots per inch (dpi), a font of no less than ten point type, a file size no greater than 100 MB, a drawing size of no more than twenty-four inches by thirty-six inches, legible and scalable (to a standard architectural or engineering scale) with a graphic scale bar on each page, and sufficient blank space for recording labels on each sheet; (2) A vicinity map on the title sheet showing at least three blocks on all sides of the proposed subdivision, which may be of a different scale than the plat; (3) The title under which the subdivision is to be recorded; (4) Accurate dimensions for all lines, angles and curves used to describe boundaries, public improvements, easements, areas to be reserved for public use and other important features; (All curves shall be circular arcs and shall be defined by the radius, central angle, tangent, arc and chart distances. All dimensions, both linear and angular, are to be determined by an accurate control survey in the field that must balance and close within a limit of one in ten thousand.) (5) The names of all abutting subdivisions, or, if the abutting land is unplatted, a notation to that effect; (6) An identification system for all lots and blocks and names for streets; (7) An identification of the public improvements, easements, parks and other public facilities shown on the plat, a dedication thereof to the public use and areas reserved for future public acquisition; (8) The total acreage and surveyed description of the area; (9) The number of lots and size of each lot; (10) Proposed ownership and use of outlots; (11) A designation of areas subject to the one-hundred-year flood, the estimated flow rate used in determining that designation, and a statement that such designation is subject to change; (12) A description of all monuments, both found and set, that mark the boundaries of the property and a description of all control monuments used in conducting the survey; (13) A statement by the land surveyor that the surveyor performed the survey in accordance with state law; (14) A statement by the land surveyor explaining how bearings, if used, were determined; (15) The signature and seal of the Colorado registered land surveyor; (16) A delineation of the extent of the one hundred year floodplain, the base flood elevation, the source of such delineation and elevation and a statement that they are subject to change; (17) The square footage of each lot; (18) Certification for approval by the following: (A) Director of planning, (B) Director of public works and utilities, (C) Director of parks and recreation, if park land is dedicated on the plat, and (D) Director of real estate and open space, if open space land is dedicated on the plat; (19) Signature blocks for all owners of an interest in the property; and (20) A signature block for the city manager's signature. (c) The subdivider shall include with the final plat: (1) Engineering drawings, certified by a professional engineer registered in the State of Colorado, for proposed public and private utility systems meeting the requirements of the City of Boulder Design and Construction Standards; (2) An update to the preliminary title report or attorney memorandum based upon an abstract of title current as of the date of submitting the plat; (3) Covenants for maintenance of private utilities or improvements, as prescribed by Subsection 9-12-12(c), B.R.C. 1981; (4) Copies of documents granting any easements required as part of the plat approval, the county clerk and recorder's recording number and proof of ownership of the property underlying the easement satisfactory to the city attorney; (5) Evidence that adequate utility services, including electrical, natural gas, telephone and other services, are provided for each lot within the subdivision; and (6) Agreements with ditch companies, if needed. Ordinance Nos. 5199 (1989); 5391 (1991); 5971 (1998); 5986 (1998); 7660 (2009); 7838 (2012); 7852 (2012); 8409 (2020); 8620 (2024)
Ask a question about Boulder law
Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.
