§ 9-9-5 — Site Access Control
Boulder Revised Code 1981 (Supplement167; ordinances effective through July30,2026; five publisher-pending ordinances held); partial · Boulder Revised Code 1981 § 9-9-5
Corpus is an independent public-information project, not the official City of Boulder website. Stable reference: corpuslaw.us/code/acb7ad26-f1df-4302-a4a7-976d24b46974
9-9-5. - Site Access Control.
(a) Access Control: Vehicular access to property from the public right-of-way shall be controlled in such a manner as to protect the traffic-carrying capacity and safety of the street upon which the property abuts and access is taken, ensuring that the public use and purpose of public rights-of-way is unimpaired as well as to protect the value of the public infrastructure and adjacent property. The requirements of this section apply to all land uses, including detached dwelling units, if motor vehicle access is provided to the property from the public right-of-way, as follows: (1) For all uses, except for detached dwelling units, the standards shall be met prior to a final inspection for any building permit for new development; redevelopment exceeding twenty-five percent of the value of the existing structure; or the addition of a dwelling unit. For purposes of this paragraph (1), the applicant shall demonstrate the value of the existing structure by submitting, at the discretion of the applicant, either the actual value assessed by the Boulder County Assessor's Office or the fair market value determined by a real estate appraiser licensed in Colorado. (2) For detached dwelling units, the standards of this section shall be met prior to a final inspection for any building permit for new development; the demolition of a principal structure; or the conversion of an attached garage or carport to a use other than use as a parking space. (3) Notwithstanding the above, development on a property that has three or fewer dwelling units must meet the driveway width standards of this section if the development has to comply with the landscape standards of Subsection 9-9-12(b), "Landscaping and Screening Standards," B.R.C. 1981. Compliance with the driveway width standards shall be met prior to final inspection of a building permit. (b) Access for Properties Subject to Annexation: Each parcel of land under a single ownership at the time of its annexation will be reviewed in terms of access as one parcel (regardless of subsequent sales of a portion) unless the property is subdivided at the time of its annexation. (c) Standards and Criteria for Site Accesses and Curb Cuts: Any access or curb cut to public rights of way shall be designed in accordance with the City of Boulder Design and Construction Standards and the following standards and criteria: (1) Number of Access Points Permitted: One access point or curb cut per property will be permitted, unless a site plan or traffic study, approved by the city manager, demonstrates that additional access points and curb cuts are required to adequately address accessibility, circulation, and driveway volumes, and only where additional accesses and curb cuts would not impair any public use of any public right-of-way, or create safety or operational problems, or be detrimental to traffic flow on adjacent public streets. (2) Access Restrictions: On arterial and collector streets, or if necessary for the safe and efficient movement of traffic, all accesses shall be designed and constructed with physical improvements and appropriate traffic control measures to assist or restrict turning movements, including, without limitation, acceleration or deceleration lanes, access islands, street medians, and signage, as may be required of the development if the city manager finds that they are necessary to preserve the safety or the traffic-carrying capacity of the existing street. The city manager shall determine the length and degree of the required access restriction measures for the property. (3) Residential Access to Arterial and Collector Streets Restricted: No residential structures shall have direct access onto an arterial. However, if no alternative street access is possible, an access may be permitted subject to the incorporation of any design standards determined to be necessary by the city manager to preserve the safety and the traffic-carrying capacity of the arterial or collector. (4) Access From Lowest Category Street Required: A property that has frontage on more than one street, alley or public access shall locate its access or curb cut on the lowest category street, alley or public access frontage. If more than one access point or curb cut is necessary, an additional access or curb cut will be permitted only where the proposed access or curb cut satisfies the requirements in this section. (5) Property Right to Access: If a property cannot be served by any access point or curb cut that satisfies this section, the city manager will designate the access point or curb cut for the subject property based on optimal traffic safety. (6) Multiple Access Points for Detached Dwelling Units: The city manager will permit multiple access points on the same street for a single lot containing a detached dwelling unit upon finding that there is at least one hundred linear feet of lot frontage adjacent to the front yard on such street, the area has a limited amount of pedestrian activity because of the low density character, and multiple access points are not inconsistent with the city's plans for curbside use on the street. The total cumulative width of multiple curb cuts shall not exceed the maximum permitted width of a single curb cut. The minimum spacing between multiple curb cuts on the same property shall not be less than sixty-five feet. (7) Shared Driveways for Residential Structures: A lot with a detached dwelling unit that does not have frontage on the street from which access is taken may be served by a shared driveway that meets all of the standards and criteria for shared driveways set forth in the City of Boulder Design and Construction Standards. (8) Residential Driveways: Any proposed driveway or access for a property with a residential use must lead to an off-street parking space meeting the requirements of this title and the City of Boulder Design and Construction Standards. In the RR, RE, RL, A, or P zoning districts, if an existing driveway located within the landscaped setback served as access to a parking area with at least one legally established parking space and the parking area is converted to other uses, the existing driveway may remain. (9) Driveway Width: Driveways shall meet the following standards (see Figure 9-1 of this section): (A) Minimum driveway width: The width of a driveway leading to an off-street parking space shall not be less than nine feet. A driveway, or portion of a driveway, may be located on an adjacent property if an easement is obtained from the impacted property owner. (B) Maximum Driveway Width: For any property with three or fewer dwelling units, the driveway width within a landscaped setback, including any associated circulation or turnarounds, shall not exceed 20 feet.

Figure 9-1: Driveway Width (10) Modification: The standards of this section may be modified under the process of Section 9-2-14, "Site Review," B.R.C. 1981. (11) Exceptions: The city manager may grant an exception to the requirements of this section under the provisions of Section 9-2-2, "Administrative Review," B.R.C. 1981, if the following criteria are met: (A) The topography, configuration of a lot, or other physical constraints makes taking access from the lowest category street, alley or public access frontage impractical, or the character of the existing area is such that a proposed or existing access to the street, alley or public access frontage is compatible with the access of properties in such area; (B) The site access and curb cuts would not impair public use of the public right-of-way; create safety or operational problems or be detrimental to traffic flow on adjacent public streets; and (C) The site access and curb cuts will minimize impacts to the existing on-street parking patterns. (d) Site Access in the Transit Village: In the area that is a part of the Transit Village that is shown on Appendix G of Title 9, "Land Use Regulation," B.R.C. 1981, all properties that request a development approval that includes any additional residential units or the addition of any nonresidential floor area shall take primary vehicular access off of a street that is consistent with the approved Transit Village Connection Plan and that is not a street that is classified as minor arterial or above on the Transportation Master Plan. Secondary vehicular access on a street that is classified as minor arterial or above may be approved if it meets all of the requirements of this section. (e) Access Permit Required: Prior to the issuance of a building permit, a proposed site access or curb cut to public right-of-way must receive any necessary permits, including: (1) City Streets: Any site access or curb cut proposed and constructed in City rights of way, including, without limitation, streets and alleys, require a permit under Chapter 8-5, "Work in the Public Right-of-Way and Public Easements," B.R.C. 1981. (2) State Highways: In addition to the permit required in Paragraph (d)(1) of this section, any site access or curb cut proposed, constructed, modified, or accessing a site where a change of use is being proposed on a State Highway requires a State Highway access permit as specified in the State Highway Access Code (SHAC). Applications for a State Highway access permit shall be made to the City of Boulder, which is the Issuing Authority. The City, in conjunction with the Colorado Department of Transportation, will review all applications for conformance with SHAC design and construction requirements prior to issuance of a State Highway access permit. Ordinance Nos. 5986 (1998); 7287 (2003); 7655 (2009); 7681 (2009); 7738 (2010); 8018 (2014); 8409 (2020); 8651 (2025); 8696 (2025); 8697 (2025); 8745 (2026)
Ask a question about Boulder law
Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.
