For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1.02 — Interpretation

Municipal Code of the City of Brighton, Colorado (Codified through Ordinance No. 2508, adopted June 16, 2026. (Supp. No. 26, Update 2)) · Brighton Land Use and Development Code § 1.02

Corpus is an independent public-information project, not the official City of Brighton website. Stable reference: corpuslaw.us/code/e159189c-e32a-40c4-93e7-b18730f3f04f

1.02 - Interpretation

A. Rules of Construction. The following rules shall apply to the application and interpretation of these regulations, unless the context clearly indicates otherwise: 1. All words shall have the customary dictionary meaning, unless specifically defined in these regulations. 2. The present tense includes the future tense and the future tense includes the present tense. 3. The singular includes the plural and the plural includes the singular. 4. Lists of examples prefaced by "including the following," "such as," or other similar clauses shall not be construed as exclusive or exhaustive and shall not preclude an interpretation of the list to include other similar and non-mentioned examples. 5. The conjunctive "and" in a list means that all apply; the conjunctives "or" and "and/or" mean the provisions may apply singly or in any combination; and the conjunctive "either...or" means the provisions apply singly but not in combinations. 6. When calculations to determine a requirement of the standards in this code results in fractions, it shall be rounded up to the nearest whole number if the standard is expressed as a minimum requirement and rounded down to the nearest whole number if the standard is expressed as a maximum allowance. 7. "Shall," "will" or "must" is mandatory; "should" or "may" is permissive but recommended as a way to best meet the standard or achieve the intent of the standard. 8. A reference to an administrative official shall refer to that official, or his or her official designee, and all references to specific city officials may also include any other designee of the City Manager. 9. Any reference to other official local, state or federal government rules or regulations shall include the current versions of those regulations, provided they remain binding on the City, or where not binding, remain consistent with the purposes, intent, and objectives included in these regulations. 10. References to a person shall include individuals, partnerships, agencies, corporations or other legal entities and the owner, tenant, occupant, principal, partners, officers, employees, agents and representatives of any legal entity. B. Conflicts. All provisions shall be considered the minimum requirements to promote the public health, safety and welfare. In case of a conflict between these regulations and any other adopted rule, regulation or code of the City, the higher standard shall apply. In making a determination of which standard is higher, the official may consider which is more specific; which is more consistent with the Comprehensive Plan; which is more consistent with the purposes, intent and objectives of these regulations; and which best promotes the public health, safety and welfare. C. Computations of Time. The following rules apply to any computation of time, unless a specific section of these regulations indicates otherwise: 1. The day of the act that commences a time period shall not be counted. 2. The last day of the time period shall be included, unless it is a Saturday, Sunday or legal city holiday, in which case the next working day shall end the time period. In all other cases Saturday, Sunday or legal city holidays count in the time period. 3. Whenever any time period is expressed for a formal submittal to the City, the time period shall end at 4:00 p.m. on the last day of that time period. 4. Any time period expressed in years shall include a full calendar year from the act that commences the time period. D. Building & Structure Measurements. The following shall be used in interpreting measurements and dimensional standards for buildings: 1. Front Building Line. When established as a requirement for location of the principal building, the distance or a range from the front lot line, at or within which distance the front building line of the principal structure shall be established. When expressed as a requirement to measure something else (i.e. parking or accessory buildings located behind the front building line), the front building line shall mean the actual line at which the front of the building is established, extending across the entire lot. With regard to building design standards, the "required front building line" is the percentage of the lot frontage which must be occupied by at least a portion of the front building. Required front building lines are intended to create enclosure or edges of the streetscape, in coordination with other buildings along the block face and on the opposing block face. Alternatives, such as active and social open spaces along the frontage or other defining vertical features along the building line, may serve this enclosure purpose in specific cases. [image omitted; see the official code] Figure 1-1 Front Building Line Front building line standards deal with the relationship of the principal building to the front lot line, the extent of the building along the lot frontage, and the relationship of other site elements to the front of the building. 2. Height. Building height, when expressed as a dimension, is measured from the average grade to the highest point of a roof. Average grade is determined by calculating the average of the highest and lowest elevation of finished grade along the front building line parallel to the street. Building heights expressed in both dimension and stories shall use the additional story limits to impact the scale, form, and mass of the building within the permitted overall height. [image omitted; see the official code] Figure 1-2 Building Height Building height is measured from the average of the highest and lowest elevation of finished grade along the front building line to the highest point of the roof structure. 3. Building Setbacks. The minimum required distance between any property line and the building. When front building setbacks are expressed as a range (i.e. 10' to 25'), it shall be interpreted as a "front building line" range, within which distance the front building line of the principal structure shall be established. 4. Story. The part of a building included between the surface of one floor and the surface of the floor next above, or if there is no floor above the ceiling above. Story heights shall be: a. 9 feet to 12 feet, generally; b. The first story for residential buildings should be 10 feet to 14 feet; c. The first story in non-residential buildings should be 12 feet to 20 feet; d. Building types or parts of buildings that require high floor-to-ceiling heights, such as a gymnasium, atrium or warehouse, shall have the number of stories calculated as the finished floor-to-ceiling height divided by 15. e. Any ground story that has more than 4 feet of its height exposed above finished grade along more than 50% of the foundation perimeter shall count as a story, except that the Director may determine that it is not a story (i.e. "walk out basement") provided: (1) The lot has a grade change of more than 4 feet within the buildable area established by setbacks; and (2) The building foundation is no more than 2 feet above grade at the highest grade point along the front elevation; and (3) The grading for the site was not significantly altered to benefit the height of the proposed building in a manner that is incompatible with the scale, massing and relationship to adjacent buildings. 5. Story, Half. The space under a sloping roof that has a line of intersection of the roof and exterior wall face not more than 2 feet above the floor level, and where the possible floor area with head room of 7 feet or more is no greater than 60% of the total floor area of the story directly beneath. [image omitted; see the official code] | Figure 1-3 Half Story Half stories allow for habitable or occupied space below pitched roof structure. 6. Building Transparency. When referring to the design of building facades, transparency is the percentage of windows and doors on the façade, intended for two purposes: (1) to break up the scale and massing of the façade and relate the building to the streetscape and public spaces; and (2) to provide connections - visual and perceived - between the activities on the site and the public streetscape or spaces. Therefore, transparency has two measurements: the extent of transparency, which is the percentage of the overall façade, measured at each story but which includes non-transparent components associated with the opening such as molding, casing or frames; and the degree of transparency, which is typically the clarity of the glass used for the opening. The clarity of the glass in the opening is met by a minimum Visible Light Transmission of 60% (VLT = the percent of total visible light that is transmitted through a glazing system) and a maximum Visible Light Reflectance of 15%. (VLR = the percent of total visible light that is reflected by a glazing system) For upper story windows, these measures may be 40% VLT and 20% VLR. [image omitted; see the official code] | Figure 1-4 Transparency Transparency requirements help break up the scale of building facades and create relationships between the building and the open spaces around the building. These requirements should be measured independently for each story. E. Lot Measurements . The following shall be used in interpreting measurements and dimensional standards for lots. In the case of parcels, tracts or other property lines clearly intended to bound buildable areas, these lines may be interpreted as lot lines for the purposes of this code: 1. Lot Area. The area bounded by the front, rear and side lot lines, or when expressed as a range, it shall be interpreted as a minimum and a maximum. 2. Lot Depth.The horizontal distance between the front and rear lot lines measured at right angles to the front right-of-way lines. Where the front and rear lines are not approximately parallel, the lot depth shall be the average when measured from at least three different points along the front lot line, including the two corners at the front lot line. 3. Lot Frontage. The portion of the lot that establishes the relationship between the building or site and the public realm or street upon which the lot fronts. 4. Lot Width. The horizontal distance between the side lot lines, typically measured at the front lot line, but for irregular lots it may be measured at the front building line. [image omitted; see the official code] | Figure 1-5 Lot Measurements This illustrates how to apply lot measurements on both regular and irregular lots. 5. Corner lots. When applying building, lot and frontage standards to corner lots, lots can be arranged in one of three patterns based on the context of the block and abutting lots: a. Standard Corner. The building orients to the same front as all other buildings on the same street, and an expanded side setback may apply on the other street side of the lot. Side and rear setbacks apply to the remaining sides. b. Reverse Corner. The building orients to the end-grain of the block (not the same as other buildings on the interior of the block), and the front setback and frontage design applies to that street. The other street-side setback can be the greater of (1) the stated street-side setback for that building type or (2) 10 feet in front of the forward-most point of the front building line of the abutting lot. Side and rear setbacks apply to the remaining sides. c. Corner Orientation. The building orients to both streets, with the front setback and frontage design applying on both street sides. The two remaining lot lines are treated as side setbacks and there is no rear setback. [image omitted; see the official code] [image omitted; see the official code] Standard Corner | [image omitted; see the official code] Reverse Corner | [image omitted; see the official code] Corner Orientation Figure 1-6 Corner Lots Setbacks, building lines and lot dimensions on corner lots can be varied based on the orientation of the lot, and the orientation of the buildings to adjacent lots. F. Interpretation of Zoning Map. Where uncertainty exists with respect to any boundary on the zoning district map, the following rules shall apply: 1. Boundaries approximately following streets or other rights of way or rivers or streams - the centerlines or extension of these centerlines shall be the boundaries. 2. Boundaries indicated as approximately following property lines - the platted or other official legal line of that property shall be the boundaries, unless the property boundaries on the map have been substantially altered. 3. Boundaries approximately following city limits shall be interpreted as following the actual city limits. 4. Boundaries that split any platted lots - the lot shall be interpreted in the district designated to the majority of the lot. In the case of an equal split, the Director shall determine the appropriate zoning based on consideration of the Comprehensive Plan, the context, the surrounding existing uses, and the likelihood of change in context or existing uses in the future. 5. Boundaries that split any unplatted property - any future platting of property may generally follow the zoning boundary and then each resulting property may assume the zoning applicable to the majority of the resulting lot, or where any resulting lots have significant discrepancies with zoning boundaries, rezoning may be required. 6. Boundaries following a shoreline shall be interpreted to follow the shorelines and in the event of change in the shoreline, shall move with the actual shoreline. G. Non-regulatory Provisions. Intent statements, design objectives, graphics and commentary such as captions to graphics or notes in tables, are an aid to interpretation of the standards and criteria. In the event of any a conflict between the intent statements, design objectives, graphics or commentary and a specific standard, the specific standard shall control. H. Resources, Guides and Industry Standards. Resources, guides and industry standards that are recognized as a reputable authority in the planning, development and urban design professions, may be used to supplement interpretation of this code. They shall be subject to the approval of the Director upon a determination that the content is consistent with the policies of the Comprehensive Plan and the purposes, intent, and design objectives of these regulations. Any resource, guide, or industry standard approved by the Director shall be listed in Appendix A, and at least one copy shall be kept on file with the Community Development Department. Use of these guides shall only be to the extent that it is consistent with the purposes, intent and design objectives expressed in these regulations, and shall not be used to otherwise modify or conflict with any specific standard in these regulations. I. Official Interpretations. In cases where there is uncertainty how this code applies to potentially recurring situations, the Director may make Official Interpretations. 1. Filing. Official Interpretations shall generally be in the format provided in Appendix B, and each official statement shall be filed with the Community Development Department and included in Appendix B. Official Interpretations shall be filed with the Planning Commission by placing it on the consent agenda of a regularly scheduled meeting. 2. Criteria. In making an Official Interpretation, the Director shall use the following criteria: a. Sound professional planning and urban design principles. b. The Comprehensive Plan and any specific plans or policies created under the Comprehensive Plan. c. The purposes, intent or design objectives applicable to this code and the specific article or sections subject to the interpretation. d. Any resources, guides or industry standards applicable to the specific situation. e. Based on the context of the street, block, site or building, the interpretation is at least one reasonable way the standards could be applied. f. Whether the same interpretation could be applied to all similarly situated property or circumstances, and meet these criteria; or whether any conditions or limitations are necessary to ensure it meets the criteria. 3. Effect of Decision. An approved Official Interpretation shall be effective upon approval by the Planning Commission and may apply to all similar situations unless: a. It is overruled or modified by a different Official Interpretation. b. It is overruled by appeal as provided in these regulations. c. It is amended or overruled by a text amendment to the section addressed by the statement.

Ask a question about Brighton law

Corpus searches the Brighton sections it holds and shows the ones that match, with their citations. Free, no sign-in.